| 1 | Cutting uprooting and clearing jungles including shrubs, water weeds, bushes, trees, plants, up to 30 cm. girth including removing as directed by Engineer-in-charge |
| 2 | Making rectangular / circular sausage cage with 10 SWG galvanized iron wire of 150 mm. x 150 mm. mesh wire netting with proper lapping of minimum 150 mm including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump Aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage upto site.(Cost is excluding the cost of end pieces). 1.50 metre diameter. |
| 3 | Making rectangular sausage cage with 10 SWG galvanized iron wire of 125mm. x 125mm. mesh wire netting with proper lapping of minimum 150 mm. including sewing the joints with 12 SWG G I wire and supply of all materials and equipments including placing the sausage cage in position, filling the same with boulder or lump aggregates complete as per direction of the Engineer-in-charge but excluding the cost of boulder / lump aggregates and its carriage up to site.(Cost is excluding the cost of end pieces ) 1.20 metre x 0.90 metre nominal section |
| 4 | Quarrying, Carrying, Supplying stone boulders from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading and carriage including all incidental charges like royalty with all leads & lifts and dressing the exposed faces etc. complete as per direction of the Engineer-In-Charge ( Quarry bed belongs to Forest Department, Govt. of W.B). Comprising Boulder above 30 Kg each 60%, above 20 Kg each 30% & above 10 Kg each 10 % for making Boulder Sausage work |
| 5 | Supplying, fitting, fixing end pieces for rectangular / square / circular sausages at the ends, with 10 SWG / 8 SWG G I wire net of different mesh sizes tying & sewing the same maintaining a lap length of 150 mm all around with 12 SWG G I wire complete, including the cost of supply of wire netting, fitting etc., complete as per direction of the Engineer - in - charge. Mesh size 150 mm x 150 mm with 10 SWG wire |
| 6 | Earthwork from borrow pits over existing embankment or for repairs to embankment, closing breaches etc. within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 7 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts both ways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Beyond 3.00 km and upto 4.00 km |
| 8 | Turing with chorkata or durba grass sods 5 cm. to 8 cm. thick in slope, crest berm etc. of embankments, canals and drainage channels etc. within a lead of 150 metre and all lifts including fine dressing, watering, ramming, guarding etc. complete. (sods will have to be arranged by the contractor at his own cost. Payment to be made on the grown grass only). |
| 9 | Extra rate over Item No 8.00 For each additional lead of 75 metre or part thereof beyond the initial lead of 150 metre upto 750 metre.Eight additional lead [Beyond 150 m and up to 750 m] |
| 10 | Quarrying, Carrying, Supplying river bed materials from the quarrying site selected by the Engineer-In-Charge to the site of work including cost of materials, loading, unloading, stacking and carriage including all incidental charges like royalty and labour charges for laying river bed materials with all leads & lifts in slope, base of apron , on the road surface and dressing the exposed faces and laying uniformly including preparing bed with earth up to 30 cm, where necessary and compacting as per direction of the Engineer-In-Charge( Quarry bed belongs to Forest Department, Govt. of W.B). River Bed materials for hard crust of the embankment |