|
| 1 | Rewinding of three phase squirrel cage induction motor ofMonoblock pump sets including all necessary material and of the same characteristics as original with required size of super enameled copper wire (including cost of copper wire),\"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including transportation of motor pump to and from Div/AEn/JEn store complete as per direction of engineer in charge. |
| 2 | 10.00 HP |
| 3 | 12.5 HP |
| 4 | 15.00 HP |
| 5 | 17.50 HP |
| 6 | 20.00 HP |
| 7 | SUPPLY & FIXING OF SPARE PARTS FOR MONOBLOCK PUMPSET (MOTOR + PUMP) |
| 8 | Connection Plates |
| 9 | up to 10 HP |
| 10 | 10 HP to 20 HP |
| 11 | Cooling Fan |
| 12 | up to 10 HP |
| 13 | 10 HP to 20 HP |
| 14 | GM/SS bush |
| 15 | Upto 10 HP |
| 16 | 10 HP to 20 HP |
| 17 | Mechanical reconditioning of Bearing sheet |
| 18 | Upto 10 HP |
| 19 | 10 HP to 20 HP |
| 20 | Mechanical reconditioning ofImpeller sheet and Key way slot |
| 21 | Upto 10 HP |
| 22 | 10 HP to 20 HP |
| 23 | Oil seal |
| 24 | Upto 10 HP |
| 25 | 10 HP to 20 HP |
| 26 | Labour charge for opening and fitting of pump sets |
| 27 | Upto 10 HP |
| 28 | 10 HP to 20 HP |
| 29 | Rewinding of three phase squirrel cage induction motor of HSC pump sets including all necessary material and of the same characteristics as original with required size of super enamelled copper wire (excluding cost of copper wire) \"E\" class insulation material and testing of motor on no load but to be guaranteed against testing on load at site, including making electric connection at site of installation of motor with starter, alignment with pump setsand transportation to and fro from installation site complete as per direction of engineer in charge at site. |
| 30 | Above 15.00 HP but upto 17.50 HP |
| 31 | Above 17.50 HP but upto 20.00 HP |
| 32 | Above 20.00 HP but upto 25.00 HP |
| 33 | SUPPLY & FIXING OF SPARE PARTS HSC PUMP SETS (MOTOR + PUMP) |
| 34 | Connection Plates |
| 35 | 5 HP to 20 HP |
| 36 | 20 HP to 30 HP |
| 37 | Cooling Fan |
| 38 | 5 HP to 20 HP |
| 39 | 20 HP to 30 HP |
| 40 | Fan Cover |
| 41 | 5 HP to 20 HP |
| 42 | 20 HP to 30 HP |
| 43 | G.M./SS Gland Guide Bush |
| 44 | 5 HP to 20 HP |
| 45 | 20 HP to 30 HP |
| 46 | Shaft with Sleeve Chuck Nut |
| 47 | 5 HP to 20 HP |
| 48 | 20 HP to 30 HP |
| 49 | Shaft Chuck Nut |
| 50 | 5 HP to 20 HP |
| 51 | 20 HP to 30 HP |
| 52 | G.M. Neck Ring |
| 53 | 5 HP to 20 HP |
| 54 | 20 HP to 30 HP |
| 55 | Bush Shaft Sleeve of G.M. |
| 56 | 5 HP to 20 HP |
| 57 | 20 HP to 30 HP |
| 58 | G.M. Gland Cover |
| 59 | 5 HP to 20 HP |
| 60 | 20 HP to 30 HP |
| 61 | S.S. Shaft (Non Magnetic) |
| 62 | 5 HP to 20 HP |
| 63 | 20 HP to 30 HP |
| 64 | G.M. Shaft Sleeve Check Nut |
| 65 | 5 HP to 20 HP |
| 66 | 20 HP to 30 HP |
| 67 | M.S. Shaft Check Nut |
| 68 | 5 HP to 20 HP |
| 69 | 20 HP to 30 HP |
| 70 | Cooling pipe set with nozzle & Nut |
| 71 | 5 HP to 20 HP |
| 72 | 20 HP to 30 HP |
| 73 | AIR Cock |
| 74 | 5 HP to 20 HP |
| 75 | 20 HP to 30 HP |
| 76 | JOB WORK FOR REPAIR OF PUMP MOTOR |
| 77 | Bearing Housing (rebuilding, turning & finishing) |
| 78 | 5 HP to 20 HP |
| 79 | 20 HP to 30 HP |
| 80 | Bearing Cap (rebuilding, turning & finishing) |
| 81 | 5 HP to 20 HP |
| 82 | 20 HP to 30 HP |
| 83 | Impeller Reconditioning for all type of Pump |
| 84 | 5 HP to 20 HP |
| 85 | 20 HP to 30 HP |
| 86 | Coupling with stud and rubber bush |
| 87 | 5 HP to 20 HP |
| 88 | 20 HP to 30 HP |
| 89 | Supply & Fixing of tyre coupling sets according torelevant IS code in Centrifugal couple pump sets of approved make Unit. This job also included re-alignment of centrifugal couple pump set after fixing of tyre coupling set as per directed by Engineer-in charge. |
| 90 | Type 16 Nos. set |
| 91 | Supply and fixing Ball bearing of Various size for centrifugal/monoblock pump set of ISI Mark as per specification and approved make by EIC. |
| 92 | 6310 or equivalent size |
| 93 | 6311 or equivalent size |
| 94 | 6312 or equivalent size |
| 95 | Suuplying of super enamal copper wire suitable for rewindind of induction motor (only procured for motor rewinding) |
| 96 | Routine maintenance of centrifugal coupled pump and motorincluding opening, cleaning, greasing and refitting / changing of ball bearing if required, gland refilling and replacing all rusted studs, replacing rubber bushes & coupling nut & bolts for coupling pulley, tightening all nut & bolts of foundation, baseplate, pump & motor etc. Checking & correcting alignment of pump & motor including necessary materials i.e. grease, nut & bolts, studs, washers, gland packing and rubber bushes etc. work done at site complete job |
| 97 | 5 HPto 20 HP |
| 98 | 20 HPto 30 HP |
| 99 | Cleaning of pump house by air blower/ vacuum cleaner or other means including removing of JALA from ceiling and walls etc. complete Job. |
| 100 | Cleaning of Electric PanelPMCC by air blower/vacuum cleaner or other means including tightening of loose connections etc. complete job. |
| 101 | Replacing of damaged/broken gland packing plate with new gland packing plate suitable for centrifugal pump shafts and nut&bolts etc. complete job. |
| 102 | 5 HP to 20 HP |
| 103 | Above 20 HP and up to 30 HP |