| 1 | Dismantling wooden floor including beams and joists, stacking the materials as directed with all leads, lifts etc. complete. |
| 2 | Removing cast iron or wrought iron or A.C.pipe and stacking them as directed with all leads, lifts etc. complete. |
| 3 | Removing and refixing of existing wooden flooringwith groving nessesory fittings etc, incluiding skirting ,cleaning |
| 4 | Providing and fixing Indian teakwood planking 25 mm thick for flooring plained on both sides, tongued and grooved including scaffolding, if necessary, and one coat of primer and french polishetc. complete. |
| 5 | Providing and fixing HDF (High Density Fiber Board) AC 4 Laminated flooring of 12 mm thickness plained on both sides, tongued and grooved, Abression Resistant, Impact Resistant, Fire Resistant, Wear Resistant Including L-Patti, 2 mm Foam Plank Size 600mm x 100mm x 12mm with nessesory fittings etc, incluiding skirting. |
| 6 | Providing and applying pearl/ luster finish paint of approved colour and shade to the existing plaster surface including scaffolding, preparing the surface, applying the acrylic wall putti etc.complete |
| 7 | Material Shifting by truck Spec. No: - As directed by Engineer in charge |
| 8 | Mazdoor, Unskilled Heavy Male/Female Spec. No: - As directed by Engineer in charge |
| 9 | Providing Carpenter I Class Skilled Spec. No: - As directed by Engineer in charge |
| 10 | Providing welder / driller with tools - Skilled Spec. No: - As directed by Engineer in charge |
| 11 | Providing, fabricating and erecting at site of work the tubular steel structure (shed) as per standard design and specifications having various spans in between trusses and in multiples of standard length of bays as specified as per standard specifications, inclusive of cost of steel tubular trusses, tubular columns purlins, tie runners, foundation bolts, base plates, nuts and bolts, welding wherever required etc. as per detailed drawing inclusive of one coat of anticorrosive paint and two coats of oil painting of approved quality and shade etc. complete. Spec. One Number : As directed by Engineer-in-charge. |
| 12 | Providing and fixing double scaffolding system (cup lock type) on the exterior side of building/structure, including additional rows of scaffolding in stepped manner as per requirement of site, made with 40mm dia M.S. tube, placed 1.5 metre centre to centre, horizontal & vertical tubes joint with cup & lock system with M.S. Tubes, M.S. tube challis, M.S. clamps and staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for execution of work of cleaning and/ or pointing and/ or applying chemical and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connecting with the building etc, wherever required, if feasible, for inspection of work at required locations with essential safety features for the workmen etc., complete as per directions and approval of Engineer-in-charge. Note:- (1) The elevational area of the scaffolding shall be measured for payment purpose. (2) The payment will be made once only for executionof all items for such works. |