|
| 1 | Part - A AMC OF MGPS SYSTEM & GAS MANIFOLD |
| 2 | AMC of Main Oxygen Manifold |
| 3 | Repair and Maintenance of Fully automatic Oxygen control panel |
| 4 | Repair of Oxygen Manifold System (6+6) jumbo cylinder ( Without Cylinder) |
| 5 | Repair of High Pressure Regulators (4bar to 10bar ) |
| 6 | AMC of Emergency Oxygen Manifold Single cylinder |
| 7 | AMC of Main Nitrous Oxide Manifold |
| 8 | Repair and Maintenance of Fully automatic Nitrous Oxide Control panel |
| 9 | Repair of Nitrous Oxide Manifold System: 2+2 |
| 10 | AMC of EmergencyNitrousOxide manifold System single Cylinder |
| 11 | AMC of Compressed Air System (Repairing/Servicing) With Electrical System |
| 12 | Servicing of Oil Free Air Compressor 7.5 HP (Anest Iwata) with Trident Air Dryer, Receiver tank 1000 ltrs and air filteration System. (Servicing of compressor is Twice in a year including Overhuling of the complete Compressed Air System) |
| 13 | AMC of Vacuum System (Repairing/Servicing) With Electrical System |
| 14 | Greasing and Servicing of Vacuum Pump (Make- IR) 7.5HP & 2.5HP and Central Vcauum System with filters, interconnecting pipes, switch gear assembly, Exhaust silencer and Receiver 500ltrs. (Twice in a year including Overhauling of the complete vacuum system) |
| 15 | AMC of Medical Gas Area Alarm System(Repairing/Servicing) |
| 16 | 2 Gas Service ( O2, vacuum) |
| 17 | 3 Gas Service ( O2, vacuum, Air- 4bar) |
| 18 | 4 Gas Service ( O2, vacuum, Air- 4bar, N2O) |
| 19 | Medical Gas Area Valve Box System |
| 20 | 2 Gas Service ( O2, vacuum) |
| 21 | 3 Gas Service ( O2, vacuum, Air- 4bar) |
| 22 | 4 Gas Service ( O2, vacuum, Air- 4bar, N2O) |
| 23 | Any Breakdown and Repair and Maintenance of different size of copper pipe with support System (lekage check and brazing) |
| 24 | Repair and Maintenance of different size of Area isolation Valve installed in entire hospital pipeline |
| 25 | Repair and Maintenance of medical Gas Outlet (O2, vacuum, Air, N2O) |
| 26 | Repair of Oxygen Flow meter |
| 27 | Repair of WardVacuum Unit with Regulator and 600ml collection jar |
| 28 | PART-BMAJOR PARTS USED WHILE REPAIR / MAINTENANCE (Vendor has to quote rates only, These items will be not consider for L1 criteria). |
| 29 | Supply, installation,testing and comissioningof High Pressure regulator (4bar-10bar) |
| 30 | Supply, installation, testing and Commissioning Control valves (Ball Valve / Gate Valve ) |
| 31 | 15MM |
| 32 | 22MM |
| 33 | 28MM |
| 34 | Supply, installation, testing and Commissioning of Pressure Reducer |
| 35 | Supply, installation, testing and Commissioning of Pressure Gauge (0-10BAR) |
| 36 | Supply, installation, testing and Commissioning of Butterfly Valve |
| 37 | Supply, installation, testing and Commissioning of Vacuum Outlet |
| 38 | Supply, installation, testing and Commissioning of Nitrous oxide outlet |
| 39 | Supply, installation, testing and Commissioning of Medical Air Outlet 4bar & 7bar |
| 40 | Supply, installation, testing and Commissioning of Oxygen Gas outlet |
| 41 | Supply, installation, testing and Commissioning of Gas Outlet Assesories |
| 42 | Supply, installation, testing and Commissioning of Reducer Seat for Controll pannel |
| 43 | Supply, installation, testing and Commissioning of Medical grade copper pipe- 28mm |
| 44 | Supply, installation, testing and Commissioning of Medical grade copper pipe- 22mm |
| 45 | Supply, installation, testing and Commissioning of Medical grade copper pipe- 15mm |
| 46 | Supply, installation, testing and Commissioning of Medical grade copper pipe- 12mm |
| 47 | Supply, installation, testing and Commissioning of Vacuum Jar with Regulator with probe |
| 48 | Supply, installation, testing and Commissioning of Oxygen Flow meter with humidifier bottle with probe |
| 49 | Air compressor (Anesta iwata 7.5HP)(Supply, installation, testing and Commissioning of all spare parts mentioned bellow) |
| 50 | Piston Cylinder |
| 51 | Piston Ring |
| 52 | Connecting Rod |
| 53 | Crank Shaft |
| 54 | Finger Valve |
| 55 | Gasket |
| 56 | Pressure Switch |
| 57 | Solenoid valve |
| 58 | Teflon Coating roller Bearing |
| 59 | Air Filter |
| 60 | DOL Statter |
| 61 | Vacuum Pump (IR 7.5HP)& 2.5HP ( Supply, installation, testing and commissioning of all the spare parts mentioned bellow) |
| 62 | Piston Cylinder |
| 63 | Piston Ring |
| 64 | Connecting Rod |
| 65 | Crank Shaft |
| 66 | Finger Valve |
| 67 | Gasket |
| 68 | Lubricating Oil |
| 69 | Air Dryer(Trident) ( Supply, installation, testing and commissioning of all the spare parts mentioned bellow) |
| 70 | Fan Motor |
| 71 | Pressure Switch |
| 72 | Condensing Coil |
| 73 | Non return Valve (NRV) |
| 74 | Supply, installation, testing and Commissioning of Area alarm System (Analog )Type:- 2 gas service, 3gas service, 4 gas service,including all types of fitting and brazing |
| 75 | Supply, installation, testing and Commissioning of Area alarm System (LCD Alarm)Type:- 2 gas service, 3gas service, 4 gas service,including all types of fitting and brazing |