|
| 1 | Part-I (INITIAL REHABILITATION) |
| 2 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlierand disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per direction of Engineer in charge. |
| 3 | Road - A |
| 4 | Road - B |
| 5 | Road - C |
| 6 | Providing, laying, spreading and compacting stone aggregates of following size Water Bound Macadam specification (WBM Grade-III) including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of gravel and sand as binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoSRT&H Specifications for Road & Bridge works (4th Revision) including hire and running charges of PRR and all other machinaries including all labour,T&P and cost, conveyance royalty & taxes of all materials required for the work complete in all respect as per direction of the Engineer-in-Charge. |
| 7 | Road-A |
| 8 | Road-B |
| 9 | Road-C |
| 10 | Providing 37.5mm thick Built up spray grouting after scrapping, cleaning the road surface applying tack coat using 3.00kg of bitumen for 10sqm and laying of one layer of 37.5mm thick by using 0.45cum of 25mm to 40mm grade bitumin for 10 sqm in each layer with 0.12 cum of 12mm size B.H.G. C.B chips as key stone for 10 sqm.spreading over and laying induding heating pouring, spreading bitumirl metal and chips and compacting with P.R.R including cost ,conveyance royalty taxes of all required metterials,hire and running chsrges of mechinaries T&P etc complete as per direction of the Engineer-in-charge |
| 11 | Road - A |
| 12 | Road - B |
| 13 | Road - C |
| 14 | Providing granular sub-base usingsand,gravel or moorun of approved quality from approved quarry with cost conveyance, royalty, taxes including admixing of sand & moorum as per requirement, laying, spreading in uniform layers, watering and compacting with 8- including cost of all materials, labour, conveyance, taxes, cess, royalities, scaffolding, watering, curing, sundries, tools and plants etc. complete as per the direction of the Engineer-in-Charge. |
| 15 | Road - A |
| 16 | Road - B |
| 17 | Road - C |
| 18 | Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701 of MORD etc. complete as per direction of the Engineer-in-charge |
| 19 | Road - A |
| 20 | Road - B |
| 21 | Road - C |
| 22 | Earthwork in excavationfor foundation of structures in all types of soil as per drawing and technical specification Clause 305 and 1104 of MoRD includding setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead & lift, dressing of sides and bottom and back filling with excavated suitablematerial upto 3mt.as per direction of Engineer-in-Charge. |
| 23 | Road - A |
| 24 | Road - B |
| 25 | Road - C |
| 26 | Providingand constructing well compacted drainage layer above the subgrade of roadwork with approved quality of dust free washed coarse to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002. as per drawing , specification & direction of the Engineer-in-charge., |
| 27 | Road - A |
| 28 | Road - B |
| 29 | Road - C |
| 30 | Providing concrete M10 for plain / reinforced concrete in open foundation complete as per drawing andMORD technical specification Clause 800,1100,1200and as per direction of Engineer-in-Charge. |
| 31 | Road - A |
| 32 | Road - B |
| 33 | Road - C |
| 34 | Plain/reinforced cement concrete M15 in sub-structure complete as per drawings and MORDtechnical specification Clauses 800,1200 andas per direction of the Engineer in charge |
| 35 | Road - A |
| 36 | Road - B |
| 37 | Road - C |
| 38 | Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and MORDtechnical specification Clauses 614, 709, 1204and as per direction of the Engineer in charge |
| 39 | Road - A |
| 40 | Road - B |
| 41 | Road - C |
| 42 | Providing and fixing ofinformatory sign board with two No M.S.Post of angle 50x50x6 of 2.45Mtr,frame of 40x40x6 MS anglefor 1.6mm thick M.S.sheet of size(1.0x0.60)Sqm with back support by 25x6 mm M.S.flat in bothway,excavation of base of size 300x300x600mm,filled with M-20 CC,keeping the post 150mm above excavation level,painting the board with two coats of SE paint over a coat of primer,lettering as per requirement complete in all shape including cost of all labour,T&P,materials,royalty etc. complete as per direction of Engineer in charge. |
| 43 | Main information Board 800x600 |
| 44 | Road - A |
| 45 | Road - B |
| 46 | Road - C |
| 47 | Fixing of Road Cautionary Sign 900mm equilaterial Triangletriangle |
| 48 | Road - A |
| 49 | Road - B |
| 50 | Road - C |
| 51 | Fixing of Road Cautionary Sign 600mm circlcular |
| 52 | Road - A |
| 53 | Road - B |
| 54 | Road - C |
| 55 | Fixing of Direction & Place Identification Sign |
| 56 | Road - A |
| 57 | Road - B |
| 58 | Road - C |
| 59 | Maintenance of 200 metre and km stones |
| 60 | Road - A |
| 61 | Road - B |
| 62 | Road - C |
| 63 | Applying primer coat on prepared bed with bitumen emulsion(S/S) @ 6Kg/10 Sqm area over granular surface etc. complete to shape as per direction of the Engineer-in-charge. |
| 64 | Road - A |
| 65 | Road - B |
| 66 | Road - C |
| 67 | Part-III ( Periodical Renewal) |
| 68 | Providing & applying tack coat with bitumen emulsion(RS-1) using emulsion pressure distributor@ 0.2kg /sqm on the prepared bituminous/granular surface cleaned with mechanical broom etc. complete to shape as per direction of the Engineer-in-charge. |
| 69 | Road - A |
| 70 | Road - B |
| 71 | Road - C |
| 72 | Providing & laying semi-dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hours using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and fillter, transporting the bot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H Specificationscomplete in all respectionetc. complete and as per direction of Engineer-in-Charge |
| 73 | Road - A |
| 74 | Road - B |
| 75 | Road - C |
| 76 | Part-IV-Emergency Works (Work to be taken up as per the requirement & separate work order to be issued by the PIU) and all labour charges complete as per direction of E.I.C. |
| 77 | Road - A |
| 78 | Road - B |
| 79 | Road - C |
| 80 | Part-II (Routine Maintenance) |
| 81 | B T Road |
| 82 | Road - A |
| 83 | 1st year |
| 84 | 2nd year |
| 85 | 3rd year |
| 86 | 4th year |
| 87 | 5th year |
| 88 | Road -B |
| 89 | 1st year |
| 90 | 2nd year |
| 91 | 3rd year |
| 92 | 4th year |
| 93 | 5th year |
| 94 | Road -C |
| 95 | 1st year |
| 96 | 2nd year |
| 97 | 3rd year |
| 98 | 4th year |
| 99 | 5th year |
| 100 | C.C. Road |
| 101 | Road - A |
| 102 | 1st year |
| 103 | 2nd year |
| 104 | 3rd year |
| 105 | 4th year |
| 106 | 5th year |
| 107 | Road - B |
| 108 | 1st year |
| 109 | 2nd year |
| 110 | 3rd year |
| 111 | 4th year |
| 112 | 5th year |
| 113 | Road - C |
| 114 | 1st year |
| 115 | 2nd year |
| 116 | 3rd year |
| 117 | 4th year |
| 118 | 5th year |