Road Transport and Highways Government Departments Closing in 0 days TDR #48460780

Tender For Construction And Routine Maintenance Of Road From 1. Noagang To Indural (Length - 5.615 Km), Package No. Tr-03-186 , Link No. L-023 Under Panisagar Block.

Issued by Government Departments · panisagar, Tripura
Tender Value
7.45 Crore
Estimated cost
Bid Submission
17 Apr 2025
0 days left
EMD
14.91 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
panisagar → Tripura
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction And Routine Maintenance Of Road From 1. Noagang To Indural (Length - 5.615 Km), Package No. Tr-03-186 , Link No. L-023 Under Panisagar Block. Pmgsy-I Work

BOQ

Name of Work:Construction of road from Noagang to Indural (Length - 5.615 Km), Package No. TR-03-186 , Link No.: L-023 under Panisagar Block.
Sl. No. Item Description
11.Noagang to Indural (Length - 5.615 Km), Package No.: TR-03-186 , Link No.: L-023, Block:Panisagar
2Clearing and grubbing road Land
3Clearing and grubbing road Land including uprotting wildvegetation,grass,bushes,shrubs,saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned,upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201
4(A) by Mechanically
5(I)in area of non thorny jungle
6Setting Out ( As per drawing enclosed ) using PCC with jhama brick aggregate.
7For all classes of soil.
8Dismantling of Flexible Pavements
9Dismantling of flexible pavements and disposal of dismantled materials with all lifts and upto a lead of 100 m, stacking serviceable materials and unserviceable materials separately as per Technical Specification Clause 202
10( I )By Manual Means
11(B) GranularCourses
12Compacting orginal ground supporting embankment.
13Loosening, leveling and compacting original ground supporting embankmentto facilitate placement of first layer of embankment, scarified to a depth of 150mm, mixed with water at OMC and than compacted by rolling so as to achieve minimum dry density as given in tables 300.1 and 300.2 for embankment construction as per technical specification clause 301.4.1.
14Construction of Embankment with material obtained from road way cutting
15Construction of Embankment with approved materials deposited at site from Roadway cutting and excavation from drain and foundation of other structuresgraded and compacted to meet requirement of tables 300.1 and 300.2 as per technical specificationclause 301.5
16( A ) For spreading beyond100m.
17( B ) For spreading within 100m.
18Excavation in cutting in soil by manual means with lead upto 50.0m.
19Excavation in road way cutting in soil by using manual means for carrying of cut earth to Embankment site with a lifts and lead upto 50.0m as per technical specification clause 302.3.
20Excavation in soil with dozer with lead upto 100m.
21Excavation for roadway in soil by mechanical means with dozer including cutting and pushing the earth to site of embankment upto a distance of 100m, including trimming bottom and side slope in accordance with requirements of lines, grades and cross sections as per technical specification clause 302.3.
22Excavation in soil using hydraulic Excavator and Tippers with disposal upto 1000m.
23Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections and transporting to the embankment location with a lift and lead upto 1000m as per technical specification clause302.3.
24Construction of Subgrade and earthen shoulder
25Construction of subgrade and earthen shoulder with approved materials obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirementof table 300.2 with lead 1000 m as per Technical specification Clause303.1.
26Surface drains
27Construction of unlined surface drains of average cross sectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in Embankment with a lift upto 3m and lead of 50m ( average lead 25m ) as per technical specification clause 307.
28( I ) Surface Drains in Ordinary soil.
29( A ) Manual means.
30Road side Pucca Drain
31Construction of Road side pucca drain with M10( 1: 3 : 6with jhama Brick aggregate ) to specified lines, grades, levels and dimensions as per approved design and technical specification Clause 307, 1606. Excavated material to be used in embankment at site.
32( B ) Trapezoidal drain ( top clear width 600mm, bottom clear width 300mm and clear depth of 400mm.
33( i ) In ordinary soil.
34Toe wall
35(i)Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & and bottom and back filling in trenches with excavated suitable material.
36( I ) Ordinary soil
37( i ) Upto 3m depth
38Brick masonary in cement mortar in foundation completed excluding pointing & plastering as per drawing & technical specifications clauses 600, 1202 & 1203
39( ii ) Brick Masonary in 1 :4 cement morter
40(iii). Plasteringwith cement mortar (1:4)15mm thick on brick work (In substructure ) as per technical specification clauses 613.4 & 1204
41(iv) Providing weep holes in brick masonary / stone masonary, plain / reinforcedconcrete abutment, wing wall, return wall with 100 mm dia AC Pipe or PVC pipe (110 mm OD of 6.0 kg/cm2pressure ) extending through the full width of the structures with slope of 1( V ) : 20 ( H ) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7
42(V). Providing concrete for plain concrete M-15(using jhama brick aggregate) in open foundations complete as per drawings and technical specifications clauses 802,803,1202,and 1203.
43(i). In foundation below GL.
44(ii)in coping
45Granular Sub-Base.
46Construction of granular sub base by providing well gradated material spreading in uniform layers with motor grader onprepared surface mixing by mix in place methid with rotavator at OMC , watering and competing with smooth wheel/vibratory roller80-100 KN static weight to achieve the desired compaction, complete as per MORD technicalspecification clause 401BY Mechanical meansFor Grading - II Material ( Jhama brick aggregate )
47Charge for construction of Granular Sub-base
48Charge for Construction of granular sub-base by providing well graded material ( 53 mm to 0.075 mm Jhama Brick Aggregate , Grading-I ), spreading in uniform layers with tractor with attachments on prepared surface, mixing by mix in place method at OMC, applying and brooming sand to fill up the interstices of coarse aggregate, watering and compacting with smooth wheel roller to achieve the desired density, complete as per MoRD Technical Specification Clause 401.( excluding the cost of jhama aggregate which are available at site only).
49By Mix in Place Method
50WBM Grading.-2- 75mm Compacted thickness .
51Providing, laying spreading and compacting 53m.m to 12.5m.m jhama Brick aggregates to water Bound Macadam specification including spreading in uniform thickness, hand packing rolling with three wheel vibratory roller 80 - 100 K.N static weight in stages to proper grade and camber, applying and brooming, filler materials to fill up the interstices of course aggregate, watering and compacting fill up the interstices as per technical specification clause 405.
52( A ) By mechanical means
53WBM Grading.-3- 75mm Compacted thickness .
54Providing, laying spreading and compacting 53m.m to 12.5m.m jhama Brick aggregates to water Bound Macadam specification including spreading in uniform thickness, hand packing rolling with three wheel vibratory roller 80 - 100 K.N static weight in stages to proper grade and camber, applying and brooming, filler materials to fill up the interstices of course aggregate, watering and compacting fill up the interstices as per technical specification clause 405.
55( A ) By mechanical means
56Prime coat.
57Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 - 1.0 kg/sqm using mechanical means as per Technical Specifican Clause 502
58( I ) Low Porosity.
59Tack coat
60Probiding and applying tack coat with Bitumen Emulsion ( RS - 1 ) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with hydraulic broom as per technical specification Clause 503.
6120mm thick open - graded premix carpet using Bituminous ( penetration grade / modified bitumen )Binder.
62Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 KN Static rollar capacity, finished to required level and grades to be followed by seal coat of either TypeA or Type B or Type C or type D as per Technical Specification Clause 508.
63By Mechanicall Means with Bitumen(S-65)
64Seal CoatProviding and laying seal coat sealing the voids in a bituminious surface laid to the specified levels, grade and cross fall using Type A, Type B and Type C asper Techinical Specification Clause 510( A ) By Manual Means.
65Case - Iv : Type D
66( II ) Bitumen (S-65)
67Providing and fixing of retro-reflectiorised cautionary, mandatory and informatory signasper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle Iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly designed foundation with M15 Grade cement concrete 450mm x 450mm x 600mm, 600m.m below ground level as per approved drawing and technical specification clause 801.
68600mm equilateral triangle aluminium sheating
69600mm Dia circular aluminium sheating.
70800×600 mm rectangular aluminium sheeting
71Reinforced cement concrete M15 grade Kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Techinical Specification Clause 1703
72(i)5th Kilometre Stone(precast)
73(ii) Ordinary Kilometer Stone (precast)
74(iii)200 m stone (Precast)
75Construction of RCC guide posts of 250mm dia and total 600mm long, ( 300mm below G.L) M15 grade ( with jhama brick aggregate) cast in situ with 20mm nominal size aggregate, true to line and grade, tolerence of vertical RCC Posts not to exceed 1 in 500 as per drawing and technical specification clause 1401.6.( A ) In ordinary soil.
76Providing and fixing \"Logo\" of PMGSYProject
77Providing and fixing of typical PMGSY informatory sign bord with Logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25 mm x 5 m size on back on edges. The lower plate will be weldedwith MS Angle Iron frame of 25mm x25mm x 5mm.The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mmx75mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450 mmx450x600 mm .600mm below ground level. the top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All MS will be stove enameled on both sides. Lettering and printing arrows border etc. will be painted with ready mixed synthetic enamel paint of superior quality in require shade and color. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1(Drg at Annexure:-lll)
78Providing and fixing \"Citizens\" Information board of PMGSY / Bharat Nirman Project
79Providing and fixing of typical Citizens\" Information Board with Logo as per MORD specifications and drawing. Two MS Plates of 2.0 mm thick,dulywelded with MS flat iron 50 mm X 5 mm size on back on edges. The flat iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 76.1 mm OD (horizontal) and 2 nos. 76.1 mm OD (Vertical) steel tube posts ( as per IS : 1161- 1979, Medium class) duly embedded in cement concrete M-15 grade blocks of600 mm X 600 mm X 750 mm, 750 mm below ground level. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube and flats will be painted withprimer and two coats of epoxy paint as per drawing and specification Clause 1701 and Annexure 1700.1
80Providing and fixing \"Maintenance board of PMGSY
81Providing and fixing PMGSY Maintenance board as per MORD specifications and drawing, consisting of 75 mm square or 75 mm steel tube frame welde4d with 25 mm MS flat iron strips, 4 Nos horizontally and 2 nos vertically, two nos. CR/GI plates 1.6 mm thick welded with the MS flats, all MS will be stove, enameled on all sides, painting the boards and lettering as pare drawing with ready mixed synthetic enamel paint of superior quality in required shade and colour , fixed in ground Works und with M.15 grade concrete (with jhama aggregate) 60x60x75 cm (depth) including cost of excavation, concrete, all materials, labour and carriage.
82Earth work in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50m, dressing of sides & and bottom and back filling in trenches with excavated suitable material.
83( I ) Ordinary soil
84( i ) Upto 3m depth
85Providing M-15 conc. With jhama agg. In open foundation below wing wall, return wall, etc aas per drawing and technical specification clause 802,803,1202 & 1203
86ii. Brick masonry work in 1:4 cement mortar in wing wall,Return wall e.t.c complete excepting pointing and plastering as per drawing and technical specification clauses 602,603,604,1202 and 1204
87iii. Plastering with cement mortar(1:4) 15mm thick on brickwork in wing wall,Return wall e.t.c in substructure as per technical specification clauses 802,804,805,806,807,1202 and 1204
88Plain / reinforced cement concrete in substructure completeincluding formwork as per drawings & technical specification Clauses 802, 804, 805,806, 807,900, 1202 & 1204.
89i) P.C.C grade M-15 below base slab (using jhama)
90(iii) RCC grade M25
91Supplying , fitting & placing HYSD bar.
92Supplying fitting and placing HYSD bar reinforcement ( Fe 415 ) in substructure completed as per drawing and technical specification Clauses 1002,1005, 1010 and 1202.
93Providing and laying reinforced cement concrete ( using fine sand ) in superstructure as per drawing and technical specifications clauses 800, 900, 1205.4 & 1205.5.
94( II ) RCC grade M25
95( i ) For height upto 5.0m.
96Supplying fitting & placing of HYSD bar.
97Supplying fitting and placing HYSD bar reinforcement in superstructure complete as per drawing & technical specifications Clauses 1002, 1010 & 1202.
98Providing and laying of cement concrete block
99Providing and laying of apron with cement concrete blocks of size as per Table 1300.1 cast-in-situ and made with nominal mix of M-15 grade cementconcrete ( using jhama brick aggregate ) as per drawing and technical specification Clause 1301 ( rate includes preparation of bed, nominal surface re-inforcement and filling of granular material in recesses between blocks.)
100Painting two coats on new concrete surface
101Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new,plastered/concrete surfaces as per drawing and Technical Specification on Pillars for inscribing structure number
102Printing new letters fand figures of any shade
103Printing new letters fand figures of any shade with synthetic enamel paint black or any other approved colour to give and even shade as per drawings and Technical Specification Clause 1701 in English or Roman Hyphens, comas and the like not to be measured and paid for . Detail for 100 letters of 160 mm height, i.e, 106 m
104Maintenance
105Total for 1st year maintenance (including 18% GST)
106Total for 2nd year maintenance (including 18% GST)
107Total for 3rd year maintenance (including 18% GST)
108Total for 4th year maintenance (including 18% GST)
109Total for 5th year maintenance (including 18% GST)
110● The upgradtion cost is inclusive of GST @ 18% and ● Maintenance amount is pre-specified by the authority as mentioned above.

AI Tender Summary

OUR REF NO 48460780
AUTHORITY Government Departments
TENDER VALUE 7.45 Crore
LAST DATE 17-04-2025
Authority
Authority Name Pradhan Mantri Gram Sadak Yojana
Work Description Construction And Routine Maintenance Of Road From 1. Noagang To Indural (Length - 5.615 Km), Package No. Tr-03-186 , Link No. L-023 Under Panisagar Block. Pmgsy-I Work
Basic Detail
Tender No 14/EO/PMGSY-I (Balance Work)/TRRDA/2024-25
Bidding Type Tender
Location
City panisagar
State Tripura
Key Dates
Publish Date 27 Mar 2025
Submission Date 17 Apr 2025
Open Date 17 Apr 2025
Finance
Tender Value 7.45 Crore
Tender Fee 10000
EMD 14.91 Lakhs
Exemption Not Available
Document List
SBDDNIeT1stCallNoagangtoI_1.pdf
Tendernotice_1.pdf
17d3d6ac-abc0-485d-877b-0c00a069f816.html
BOQ_218632.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 27, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 17, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 17, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

SBDDNIeT1stCallNoagangtoI_1.pdf

pdf

Tendernotice_1.pdf

html

17d3d6ac-abc0-485d-877b-0c00a069f816.html

xls

BOQ_218632.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders