| 1 | Schedule of Quantity |
| 2 | Carrying out Wet Servicingof 1.5TR/2TR window/Split AC/High Sensible unit i/c removing, cleaning all components and filters, dedusting by high pressure air blower/ Jet pumpforwashing condenser, evaporator if required), refixing, tightening electrical connections, testing of AC unit, recording all parameters in service reportetc as reqd.Item also includes visit charge for carrying out wet servicing. |
| 3 | Complete refillingof refrigerant gas recommended by the OEMin 1.5 TR S/T AC units includingflushing out the existing refrigerant gas, leak arresting, pressure testing, charging the refrigerantetc as required. This work shall be guaranteed for one yearfrom the date of charging of refrigerant. Any shortage in refrigerant shall be topped up free of cost. Refrigerant recommended by the OEM of AC unit shall only be charged.( R22 refrigerant ) |
| 4 | Replacement of Starting Capacitor 80-100 mfd by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 5 | Replacement of Running capacitor 36-50 mfd by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 6 | Replacement of Capacitor for Condenser Fan by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 7 | Replacement of Contactor relay for Split AC outdoor unit by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 8 | Replacement of Starting Relayby new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 9 | Replacement of Thermostat by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 10 | Replacement of Thermostat sensor by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 11 | Replacement of Fan blade by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 12 | Replacement of Blower Assembly for Split AC unitby new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 13 | Replacement of PCB suitablefor 1.5 /2 TR Split AC indoor/outdoor unit by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 14 | Replacement of PCB suitablefor 1.5/2 TRInvertor type Split AC unit by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 15 | Replacement of Fan motor for Condenser unit 1.5 / 2 TR AC by new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 16 | Replacement of Fan motor for Indoor unit of 1.5TR / 2 TR Split ACby new components of 1.5TR / 2TR Window / Split AC units suitable for operation on 1ph 230V AC supply i/c connections, testing etc. i/c credit (disposing of the dismantled as per the norms of the Central / Statepollution control board ) for old material as reqd. |
| 17 | Replacement of Rotary type new Compressor of 1.5/2.0 TR for Split /Window /High Sensible AC uniti/c fixing, brazing, leak testingetc. as required(The faulty compressorshall be handed over to the agency. The agency shall consider suitable credit for defective compressor while quoting the item) - Optional item to be executed with the approval of Engineer-in-charge. |
| 18 | Replacement of Condenser coil manufactured with copper/ brass tube for 1.5/2.0 TR Split AC unit i/c fixing, brazing, leak testingetc. as required (The faulty coil shall be handed over to the agency. The agency shall consider suitable credit for defective coil while quoting the item) - Optional item to be executed with the approval of Engineer-in-charge. |
| 19 | Supplying & Charging of R22 / R410 / R134 gas for existing AC unit for topping up etc. as reqd. |
| 20 | Supplying and fixing of readymade powder coated heavy duty iron stand for mounting outdoor unit of the above AC including providing necessary hardware support etc complete as required. |
| 21 | Supply & Fixing 1/2”copper refrigerant pipes if required at site I/c cutting, bending, brazing etc. complete as reqd during installation. |
| 22 | Supply & Fixing 1/4”copper refrigerant pipes if required at site I/c cutting, bending, brazing etc. complete as reqd during installation. |
| 23 | Supply & Fixing 5/8”copper refrigerant pipes if required at site I/c cutting, bending, brazing etc. complete as reqd during installation. |
| 24 | Providing and Wrapping of expanded polyethylene foam tube (heat lon) insulation on the existing 1/2” Copper refrigerant piping complete with clamping etc. as reqd. |
| 25 | Providing and Wrapping of expanded polyethylene foam tube (heat lon) insulation on the existing 1/4” Copper refrigerant piping complete with clamping etc. as reqd. |
| 26 | Providing and Wrapping of expanded polyethylene foam tube (heat lon) insulation on the existing 5/8” Copper refrigerant piping complete with clamping etc. as reqd. |
| 27 | S/F 63mm dia class 2 PVC pipe [Medium thick] along with all accessories such as bends, elbows, couplers etc on wall i/c clamping etc for protection of refrigerant pipe and cable as reqd. |
| 28 | S/L 3 core 2.5 sq.mm multi strand PVC insulated PVC sheathed copper conductor cable as reqd. ( M/s Finolex / Similar superior) |
| 29 | Supplying and Fixing 20 mm diaISI mark heavy duty CPVC pipewith accessories for drain water connection etc. as required. |
| 30 | Supplying and fixing 5 amps to 32 amps rating, 240/415 volts, single pole\"C\" curve, miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections, testing and commissioning etc. as required. |
| 31 | Replacing the faulty compressor ofAC Unit by swapping the compressor of 1.5 TR Split Type AC unitof the switched off / scrapped unit available at BSNL buildings, including giving all kind of mechanical and electrical connections, etc as required. |
| 32 | Dismantling the existing 1.5 TR S/T AC Unit from the installed location in the GF/IF/2F/3F/4th floor along with the supports, refrigerant pipelines, protection pipes, electrical cables cables, drain pipes etc fixed on the external wall of the building without any damage including pumping down the refrigerant gas, making good the damages on the walletc as required. (Note : This item shall be executed for the reinstallation works and not on the units proposed for scrapping.) |
| 33 | ITC ofexisting 1.5 TR S/T AC unit I/c outdoor on existing frame on any floor/terrace of the building and indoor unit on wall on the existing frame with nuts and bolts,giving electrical /refrigerant connections, testing and commissioning etc.(Cost of refrigerant and its charging is not included in this item) |