Tender For Construction Of Nandganj Shadiyabad Road To Barauli Anusuchhit Basti And Ambedkar Sthan Hote Huye Akraw Chauhan Basti Link Road - Construction of Embankment with Material Obtained from R.O.W. Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST 2 Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on preared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achive the desired denisty, complete as per Technical Specification clause 401.Including All material T&P, Labour cess etc But Excluding cost of GST 3 Providing, laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base (CTSB) Including All material T&P, Labour cess etc But Excluding cost of GST 4 Providing, laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually, mixing in place with rotavator and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of base (CTB) Including All material T&P, Labour cess etc But Excluding cost of GST 5 Providing and applying tack coat with Bitumen VG-10 using bitumen distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. Including All material T&P, Labour cess etc But Excluding cost of GST and Bitumen 6 Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508. Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion 7 Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 Including All material T&P, Labour cess etc But Excluding cost of GST and Emulsion 8 Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucketcapacityincludingcuttingandloadingintippers,trimming bottomandsideslopes,inaccordancewithrequirementsoflines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3 Including All material T&P, Labour cess etc But Excluding cost of GST 9 Concretewith4cm.gaugeapprovedstoneballast,approvedcoarse sandandcementintheproportionof4:2:1includingsupplyofall materials labour and tools and plants etc. required for proper completion for the work. Including All material T&P, Labour cess etc But Excluding cost of GST 10 Providing and laying reinforced cement concrete pipe NP3 for culvertsonfirstclassbeddingofgranular materialinsinglerow includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry worksinheadwallsandparapetsClause 1100. (350mm DiaHume Pipe) Including All material T&P, Labour cess etc But Excluding cost of GST 11 Concretewith4cm.gaugeapprovedstoneballast,approvedcoarse sandandcementintheproportionof6:3:1includingsupplyofall materials labour and tools and plants etc. required for proper completion for the work. Including All material T&P, Labour cess etc But Excluding cost of GST 12 M-150 brick work in 1:6 cement and sand of 1.25 fineness modulous mortarinfoundationandplinthincludingsupplyofallmaterial, labourandtoolsandplants.ect.requiredforpropercompletionof work. Including All material T&P, Labour cess etc But Excluding cost of GST 13 Providing and laying reinforced cement concrete pipe NP3 for culvertsonfirstclassbeddingofgranular materialinsinglerow includingfixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry worksinheadwallsandparapetsClause 1100. (600mm DiaHume Pipe) Including All material T&P, Labour cess etc But Excluding cost of GST 14 Struckpointingwithcementmortarconsisting 1part cementand2 partsofsandof1.25finenessmodulusincludingsupplyofall materials labour and T&P etc. required for proper completion of thework. Including All material T&P, Labour cess etc But Excluding cost of GST 15 15mm thick plaster withcementmortar consisting of 1 part cement and 4 part of approved coarsesand. Minimum thickness not be lessthan10mmincludingsupplyofallmaterials,labourandT&Petc. Including All material T&P, Labour cess etc But Excluding cost of GST 16 Construction of subgrade & earthen shoulder with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 Including All material T&P, Labour cess etc But Excluding cost of GST 17 PART AMaintainance cost :- Maintainance cost will be paid year wise as perGovernment order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknoworder No. 3689COPRMC/Mul-23-24 Date 17.02.2024 18 1st year- maintainance cost 0%on Bituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 19 2nd year- maintainance cost 0.75% onBituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 20 3rd year- maintainance cost 1.50 %onBituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 21 4th year- maintainance cost 2.25% onBituminous Work (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST) 22 5th year- maintainance cost 3.00 % onBituminous Work(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)