Sales : +91-777 804 8217
| Sl. No. | Item Description |
| 1 | Rate Contract For A Period Of 03 Years For Supply, Transportation To The Site, Preliminary Testing, Installation & Integration, Acceptance Testing, Commissioning,01Year Comprehensive On-Site Warranty And 05 Year Comprehensive Amc Support For Rtis Devices With M2m Mobile Data Services |
| 2 | RTIS device comprising of MSS transceiver module, dual 4G/3G modems, GAGAN modules, RF module, Antennae, compute resources, embedded Redhat Enterprise Linux (RHEL) OS along with appropriate level of OEM support subscription/license from Redhat etc. including warranty for a period of 01 year from the last date of Acceptance/commissioning ] |
| 3 | One time cost of M2M SIMs (MSP-1) ] |
| 4 | One time cost of M2M SIMs (MSP-2) ] |
| 5 | Cost of RTIS device installation/mounting in locomotives, EMUs, MEMUs, Vande Bharat Train Sets ]At (Location) CCODE-CN Delhi 12000.00 Numbers5 5 Service Non Stock --- Yes CONSIGNEE INR (Y)Page 1 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRIS |
| 6 | Cost of Mobile data services/ SIMs Rentals for a period upto 01 year from the date of commissioning (MSP-1) i.e. upto completion of warranty period ]At (Location) CCODE-CN Delhi 12000.00 Numbers6 6 Service Non Stock --- Yes CONSIGNEE INR (Y)Cost of Mobile data services/ SIMs Rentals for a period upto 01 year from the date of commissioning (MSP-2) i.e. upto completion of warranty period ]At (Location) CCODE-CN Delhi 12000.00 Numbers7 7 AMC (Y) Non Stock --- Yes CONSIGNEE INR Comprehensive AMC (CAMC) of RTIS Devices, Cabling, other Equipment/Accessories etc. supplied in a supply order for a period 05 Years after expiry of 01 years Warranty Period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers8 8 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-1) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers9 9 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-2) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 0 Days of issue of Contract, Detailed deliveryCompletion : Within 392 Days thereafter schedule is given inclause 17 of BidDocument Part-II.Payment TermsS.No DescriptionPayment Terms1 1. Payment on delivery milestones: 80% of cost of RTIS devices (Item no.1 of SoR) and 80% of costof one time charges of 4G SIMs (Item no.3, 4 of SoR) shall be done on completion of each deliverymilestone. 2. Payment on Installation milestone: 80% of cost of installation of RTIS devices (Itemno.2 of SoR) shall be done on completion of each installation & integration milestone. 3. Payment oncommissioning milestone: a) Remaining 20% of the cost of total nos of RTIS devices deliveredagainst supply order (Item no. 1) b) Remaining 20% of the cost of installation of total nos of RTISdevices installed against supply order (Item no 2 of SoR). c) Remaining 20% of the cost of one timecharges of M2M SIMs (Item no 3, 4 of SoR) 4. Payment during warranty Services: a) 50% of the rentalof 4G SIMs for ï¬rst year (Item no. 5, 6 of SoR) after completion of six months of warranty supportperiod after commissioning b) Remaining 50% of the rental of 4G SIMs for ï¬rst year (Item no. 5, 6 ofSoR) after completion of one year of warranty support period commissioning 5. Payment forComprehensive AMC: After the expiry of 01 year warranty period post commissioning, CAMC chargesand SIMs Rental Charges (Item no. 7, 8 & 9 of SoR) shall be payable on half yearly basis aftercompletion of 06 months of satisfactory maintenance during the period under consideration. CAMCCharges & SIMs Rental Charges shall be calculated on pro-rata basis for item no. 7, 8 & 9 of SoR.However no payment shall be made without submission of half yearly preventive maintenancereports. For more details clause no. 19 of Bid Document Part-II be referred4. ELIGIBILITY CONDITIONSPage 2 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30Important All documents uploaded and remarks / confirmation entered by the bidders against anyeligibility condition shall be opened as part of technical bid only:Special Eligibility CriteriaS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 9.1 All the criteria given in table Normal Applicable to Yes No Allowedbelow are mandatory for all bidders (Mandatory)qualification . 9.2 Consortium/JV bidding is alsoallowed. Bidder/s shall comply allthe conditions w.r.t Joint Venture/Consortium Bidding mentioned inSBD part-I. Bidder shall also furnishapplicable annexure (Annexure-11/Annexure-12) available in SBDpart-I. 9.3 In case of Consortium/JVbidding, credentials of members ofConsortium/JV as given in clauseno. 8.15 to 8.18 of SBD Part-I shallbe applicable. In case of non-consortium/non-JV bid, credentialsof affiliated companies like ParentCompany, Strategic Business Unit,Group Company, sister company,associate company, SubsidiaryCompany, etc. will not be taken intoconsideration. The criteria must bemet by the entity bidding in thetender. 9.4 The bidder must ensure thatthe requisite documents/detailstowards qualiï¬cation Criteria aresubmitted along with bid.Compliance of qualiï¬cation criteriaparameters and details ofassociated documents should befilled in the format as per Annexure-H. Bids not accompanied by all therequired documents mentioned areliable to be considered only basedon the documents/details furnishedwith the bid. However, CRISreserves the right to seekclariï¬cations from the bidderswherever considered necessary. 9.5 CRIS reserves the right to verifythe authenticity of the documentssubmitted by the bidders. For Qualiï¬cation CriteriaParameters please refer clause no.9.6 of bid document part-II.5. COMPLIANCE CONDITIONSImportant All documents uploaded and remarks / confirmation entered by the bidders against any: compliance condition shall be opened as part of technical bid only.Commercial-ComplianceS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed UploadingPage 3 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:301 Please enter the percentage of local Normal Applicable to No Yes Allowedcontent in the material being all bidders (Optional)offered. Please enter 0 for fullyimported items, and 100 for fullyindigenous items. The deï¬nitionand calculation of local contentshall be in accordance with theMake in India policy as incorporatedin the tender conditions.Other ConditionsS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 The tender is for entering into Rate Normal Applicable to No No Not Allowedcontract for a period of 03 years all biddersfrom the date of signing of RC forsupply, transportation to the Site,Preliminary testing, Installation &Integration, Trainings, AcceptanceTesting & Commissioning of RTISdevices (Indoor & Outdoor Unitsalong with cabling, ï¬xtures etc.)including M2M SIMs/services(5G/4G) from 02 different MobileService Providers (MSPs) with APN(Access Point Name) conï¬gurationfor CRIS/Railways.The vendor shallbe responsible for integration ofRTIS devices with existing systemcomponents (i.e. RTIS systemcomponents implemented in Phase-1 and Phase-2 of the project) andmaking them functional as perfunctional requirementspeciï¬cations given in section-II ofAnnexure-A (bid doc Part-II). CRISshall provide necessary support tofacilitate the same. The RTISdevices shall function in accordancewith the system architecture givenin section-2.0 above. The technicalspeciï¬cations of RTIS devices aregiven in Annexure-A (bid doc Part-II). The considerations for physicaldesign of RTIS device includingdimensions (maximum) have beenspeciï¬ed in item no. 1.6 (section-I)of Annexure-A (bid doc Part-II). Thephysical design of RTIS device shallbe prepared by the vendor basedon these design considerations.Warranty of RTIS device shall be forone year after date ofacceptance/commissioning of lastlot of device in the Supply Orderfollowed by 05year comprehensiveAMC (CAMC). Detailed scope ofwork is given in clause 4 & clause 7of Bid Document Part-II2 Liquidated damages (LD) for Normal Applicable to No No Not Alloweddelay in delivery : 18.1. LD on all biddersdelay in delivery of RTIS devicesalong with SIMs (Milestones M1, M2,M3?.) : LD shall be applicable ondelayed portion of the supply only;@0.5% of the total all inclusive costof RTIS devices & M2M SIMs (itemno. 1, 3 & 4 of SoR) which arePage 4 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30delivered late as per deliverytimelines deï¬ned for the milestonefor each week or part thereof. AnRTIS device shall be considered asdelivered only when all associatedcomponents of the device viz. SIMs,Cables, Connectors, MCBs aredelivered along with the RTISdevice. The total LD levied / to belevied on delivery milestone shallnot exceed 10% of the total valueof supply of RTIS devices & M2MSIMs (item no. 1, 3 & 4 of SoR) tobe delivered in that milestone.18.2. LD on delay in completion ofS2 milestone (in case BPC is to begiven based on performance ofmilestone S2 otherwise LD as per18.3 shall be applicable): LD shallbe applicable on complete quantityof RTIS devices to be installed &integrated under milestone S2;@0.5% of the total all inclusive costof RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) to be installed & integrated inthe milestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.3. LD on delay in theinstallation& integration of Locodevices (Post BPC installationmilestones S3, S4?): LD shall beapplicable only on the deviceswhich are installed & integratedlate; @0.5% of the total all inclusivecost of RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) which are not installed withinthe timelines stipulated for themilestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.4. LD on commissioningmilestone: LD shall be applicableon complete quantity of RTISdevices & M2M SIMs to becommissioned under that supplyorder; @0.5% of the total allinclusive cost of the entire quantityof RTIS devices, installationservices, M2M SIMs & Rentals (itemno. 1 to 6 of SoR) for each week orpart thereof. The total LD levied / tobe levied on the supply orderincluding LD alreadylevied/applicable for above delivery(M1, M2, M3?) & installationmilestones (S2, S3, S4?) shall notexceed 10% of the total cost of RTISPage 5 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30devices, installation services, M2MSIMs & Rentals (Item no. 1 to 6 ofSoR).Pls refer clause 18 of RFP Part-II docfor detailed LD & LD waiverconditionsTechnical-CompliancesS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 Technical Requirements: Normal Applicable to No No Allowed12.1 Bidder should furnish the list all bidders (Mandatory)of make & model of all the offeredproducts including the Sub-components detail of RTIS deviceson his letter head. 12.2 Detailed technicalspeciï¬cations, FunctionalRequirement Speciï¬cations (FRS) ofRTIS devices and Hardware &Software Test Cases are given inAnnexure-A. The bidder mustsubmit an item wise compliance tothe technical speciï¬cations, FRS &Test Cases specific to this tender onits letter head. The Model and Makeof the offered RTIS device should beclearly speciï¬ed in this compliancedocument. The list of competentvendors/OEMs with experience indevelopment of MSS terminalprovided by Space ApplicationsCentre (SAC), ISRO, Ahmedabad isgiven in Annexure-K. The biddershall source MSS sub-system (MSSTransmit & Receive chain includingRF frontend) of RTIS device fromone of the OEMs recommended bySAC, ISRO (listed at Annexure-K).The bidder must also submit item-wise compliance to technicalspeciï¬cations of Rail MSS terminal-Locomotive (RMT-L; Outdoor Unit)given at section 1.1 under Section-Iof Annexure-A duly vetted by theOEM of MSS sub-system (OEMslisted at Annexure-K).The technicalsuitability of the OEM/productchosen by the bidder shall beveriï¬ed through a Proof of Concept(PoC) during technical bidevaluation as speciï¬ed in clause13.4. 12.3 The bidder must furnish thecomplete Bill of Material (BoM) ofoffered RTIS devices & its OS on theletter head of respective OEMs dulyvetted by the respective OEMs. 12.4 The bidder shall furnishdocumentary proof of backendsupport includingsoftware/ï¬rmware upgrades andavailability of spares for a period of08 years for RTIS device as well asthe documentary proof of backendsupport from respective OEMs ofPage 6 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30support from respective OEMs ofthe MSS sub-system (listed inAnnexure-K)as per Annexure-E,RTIS device and its OS as perAnnexure-E1and also from theMobile data service providers asper Annexure-F. 12.5 The bidder shall furnish a planfor carrying out implementation &maintenance works. The biddershall provide list of its customersupport offices in the country fromwhere the support shall beprovided. Detailed site-wise supportplan shall be furnished by thebidder as per Performa given inAnnexure ? G of Tender Document. 12.6 The bidder must furnish theSchedule of Requirement (SoR) asper Annexure-D as part of thetechnical bid clearly specifyingmodel and make of the offeredproducts. 12.7 The bidder must furnishtechnical literature/datasheets &complete technical speciï¬cations ofRTIS device& its sub-componentsviz. GAGAN/NavIC receiver, 5G/4Gmodule/controller, OS,Display/Panel PC, Antennae, MSSsub-system in RMT-L, RF frontend inRMT-L, power supply module, 2.4GHz RF etc and implementationplan including timelines. 12.8 Details of additional systemcomponents which bidder proposes(if any) to include for meeting thesystem requirements. 12.9 Item wise compliance to all theclauses of the Bid document Part-IIof the tender document. 12.10 In case any clause orcondition is not acceptable to thebidder, it should clearly specify inStatement of Deviations as performat available onwww.ireps.gov.in. 12.11 The vendor shall providedetails of its manufacturingarrangement and capacity. 12.12 The bidder shall provideCertiï¬ed audited copies of BalanceSheets/Proï¬t & Loss Accounts/Annual Reports of last threeï¬nancial years i.e. 2020-21, 2021-22 and 2022-23 shall be submitted.12.13 All documents which arespeciï¬ed in SBD Part-I of biddocument 12.14 The complete checklist isPage 7 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:3012.14 The complete checklist isplaced at Annexure-H6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 5344424.pdf SBD Part-I2 5344514.pdf Bid document -IIThe tenderers in their bid shall indicate the details of their GST Jurisdictional Assessing Officers(Designation, Address & email id). In case of a contract award, a copy of Purchase Order shall beimmediately forwarded by Purchaser to the GST Jurisdictional assessing officer mentioned in Tenderers bidThis tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issuedby Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Boardletter no. 2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violateprovisions of GFR regarding procurement through GeM.Digitally Signed By AMPII ( RISHABH JUYAL ) |
| 7 | Cost of Mobile data services/ SIMs Rentals for a period upto 01 year from the date of commissioning (MSP-2) i.e. upto completion of warranty period ]At (Location) CCODE-CN Delhi 12000.00 Numbers7 7 AMC (Y) Non Stock --- Yes CONSIGNEE INR Comprehensive AMC (CAMC) of RTIS Devices, Cabling, other Equipment/Accessories etc. supplied in a supply order for a period 05 Years after expiry of 01 years Warranty Period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers8 8 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-1) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers9 9 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-2) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 0 Days of issue of Contract, Detailed deliveryCompletion : Within 392 Days thereafter schedule is given inclause 17 of BidDocument Part-II.Payment TermsS.No DescriptionPayment Terms1 1. Payment on delivery milestones: 80% of cost of RTIS devices (Item no.1 of SoR) and 80% of costof one time charges of 4G SIMs (Item no.3, 4 of SoR) shall be done on completion of each deliverymilestone. 2. Payment on Installation milestone: 80% of cost of installation of RTIS devices (Itemno.2 of SoR) shall be done on completion of each installation & integration milestone. 3. Payment oncommissioning milestone: a) Remaining 20% of the cost of total nos of RTIS devices deliveredagainst supply order (Item no. 1) b) Remaining 20% of the cost of installation of total nos of RTISdevices installed against supply order (Item no 2 of SoR). c) Remaining 20% of the cost of one timecharges of M2M SIMs (Item no 3, 4 of SoR) 4. Payment during warranty Services: a) 50% of the rentalof 4G SIMs for ï¬rst year (Item no. 5, 6 of SoR) after completion of six months of warranty supportperiod after commissioning b) Remaining 50% of the rental of 4G SIMs for ï¬rst year (Item no. 5, 6 ofSoR) after completion of one year of warranty support period commissioning 5. Payment forComprehensive AMC: After the expiry of 01 year warranty period post commissioning, CAMC chargesand SIMs Rental Charges (Item no. 7, 8 & 9 of SoR) shall be payable on half yearly basis aftercompletion of 06 months of satisfactory maintenance during the period under consideration. CAMCCharges & SIMs Rental Charges shall be calculated on pro-rata basis for item no. 7, 8 & 9 of SoR.However no payment shall be made without submission of half yearly preventive maintenancereports. For more details clause no. 19 of Bid Document Part-II be referred4. ELIGIBILITY CONDITIONSPage 2 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30Important All documents uploaded and remarks / confirmation entered by the bidders against anyeligibility condition shall be opened as part of technical bid only:Special Eligibility CriteriaS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 9.1 All the criteria given in table Normal Applicable to Yes No Allowedbelow are mandatory for all bidders (Mandatory)qualification . 9.2 Consortium/JV bidding is alsoallowed. Bidder/s shall comply allthe conditions w.r.t Joint Venture/Consortium Bidding mentioned inSBD part-I. Bidder shall also furnishapplicable annexure (Annexure-11/Annexure-12) available in SBDpart-I. 9.3 In case of Consortium/JVbidding, credentials of members ofConsortium/JV as given in clauseno. 8.15 to 8.18 of SBD Part-I shallbe applicable. In case of non-consortium/non-JV bid, credentialsof affiliated companies like ParentCompany, Strategic Business Unit,Group Company, sister company,associate company, SubsidiaryCompany, etc. will not be taken intoconsideration. The criteria must bemet by the entity bidding in thetender. 9.4 The bidder must ensure thatthe requisite documents/detailstowards qualiï¬cation Criteria aresubmitted along with bid.Compliance of qualiï¬cation criteriaparameters and details ofassociated documents should befilled in the format as per Annexure-H. Bids not accompanied by all therequired documents mentioned areliable to be considered only basedon the documents/details furnishedwith the bid. However, CRISreserves the right to seekclariï¬cations from the bidderswherever considered necessary. 9.5 CRIS reserves the right to verifythe authenticity of the documentssubmitted by the bidders. For Qualiï¬cation CriteriaParameters please refer clause no.9.6 of bid document part-II.5. COMPLIANCE CONDITIONSImportant All documents uploaded and remarks / confirmation entered by the bidders against any: compliance condition shall be opened as part of technical bid only.Commercial-ComplianceS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed UploadingPage 3 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:301 Please enter the percentage of local Normal Applicable to No Yes Allowedcontent in the material being all bidders (Optional)offered. Please enter 0 for fullyimported items, and 100 for fullyindigenous items. The deï¬nitionand calculation of local contentshall be in accordance with theMake in India policy as incorporatedin the tender conditions.Other ConditionsS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 The tender is for entering into Rate Normal Applicable to No No Not Allowedcontract for a period of 03 years all biddersfrom the date of signing of RC forsupply, transportation to the Site,Preliminary testing, Installation &Integration, Trainings, AcceptanceTesting & Commissioning of RTISdevices (Indoor & Outdoor Unitsalong with cabling, ï¬xtures etc.)including M2M SIMs/services(5G/4G) from 02 different MobileService Providers (MSPs) with APN(Access Point Name) conï¬gurationfor CRIS/Railways.The vendor shallbe responsible for integration ofRTIS devices with existing systemcomponents (i.e. RTIS systemcomponents implemented in Phase-1 and Phase-2 of the project) andmaking them functional as perfunctional requirementspeciï¬cations given in section-II ofAnnexure-A (bid doc Part-II). CRISshall provide necessary support tofacilitate the same. The RTISdevices shall function in accordancewith the system architecture givenin section-2.0 above. The technicalspeciï¬cations of RTIS devices aregiven in Annexure-A (bid doc Part-II). The considerations for physicaldesign of RTIS device includingdimensions (maximum) have beenspeciï¬ed in item no. 1.6 (section-I)of Annexure-A (bid doc Part-II). Thephysical design of RTIS device shallbe prepared by the vendor basedon these design considerations.Warranty of RTIS device shall be forone year after date ofacceptance/commissioning of lastlot of device in the Supply Orderfollowed by 05year comprehensiveAMC (CAMC). Detailed scope ofwork is given in clause 4 & clause 7of Bid Document Part-II2 Liquidated damages (LD) for Normal Applicable to No No Not Alloweddelay in delivery : 18.1. LD on all biddersdelay in delivery of RTIS devicesalong with SIMs (Milestones M1, M2,M3?.) : LD shall be applicable ondelayed portion of the supply only;@0.5% of the total all inclusive costof RTIS devices & M2M SIMs (itemno. 1, 3 & 4 of SoR) which arePage 4 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30delivered late as per deliverytimelines deï¬ned for the milestonefor each week or part thereof. AnRTIS device shall be considered asdelivered only when all associatedcomponents of the device viz. SIMs,Cables, Connectors, MCBs aredelivered along with the RTISdevice. The total LD levied / to belevied on delivery milestone shallnot exceed 10% of the total valueof supply of RTIS devices & M2MSIMs (item no. 1, 3 & 4 of SoR) tobe delivered in that milestone.18.2. LD on delay in completion ofS2 milestone (in case BPC is to begiven based on performance ofmilestone S2 otherwise LD as per18.3 shall be applicable): LD shallbe applicable on complete quantityof RTIS devices to be installed &integrated under milestone S2;@0.5% of the total all inclusive costof RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) to be installed & integrated inthe milestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.3. LD on delay in theinstallation& integration of Locodevices (Post BPC installationmilestones S3, S4?): LD shall beapplicable only on the deviceswhich are installed & integratedlate; @0.5% of the total all inclusivecost of RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) which are not installed withinthe timelines stipulated for themilestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.4. LD on commissioningmilestone: LD shall be applicableon complete quantity of RTISdevices & M2M SIMs to becommissioned under that supplyorder; @0.5% of the total allinclusive cost of the entire quantityof RTIS devices, installationservices, M2M SIMs & Rentals (itemno. 1 to 6 of SoR) for each week orpart thereof. The total LD levied / tobe levied on the supply orderincluding LD alreadylevied/applicable for above delivery(M1, M2, M3?) & installationmilestones (S2, S3, S4?) shall notexceed 10% of the total cost of RTISPage 5 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30devices, installation services, M2MSIMs & Rentals (Item no. 1 to 6 ofSoR).Pls refer clause 18 of RFP Part-II docfor detailed LD & LD waiverconditionsTechnical-CompliancesS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 Technical Requirements: Normal Applicable to No No Allowed12.1 Bidder should furnish the list all bidders (Mandatory)of make & model of all the offeredproducts including the Sub-components detail of RTIS deviceson his letter head. 12.2 Detailed technicalspeciï¬cations, FunctionalRequirement Speciï¬cations (FRS) ofRTIS devices and Hardware &Software Test Cases are given inAnnexure-A. The bidder mustsubmit an item wise compliance tothe technical speciï¬cations, FRS &Test Cases specific to this tender onits letter head. The Model and Makeof the offered RTIS device should beclearly speciï¬ed in this compliancedocument. The list of competentvendors/OEMs with experience indevelopment of MSS terminalprovided by Space ApplicationsCentre (SAC), ISRO, Ahmedabad isgiven in Annexure-K. The biddershall source MSS sub-system (MSSTransmit & Receive chain includingRF frontend) of RTIS device fromone of the OEMs recommended bySAC, ISRO (listed at Annexure-K).The bidder must also submit item-wise compliance to technicalspeciï¬cations of Rail MSS terminal-Locomotive (RMT-L; Outdoor Unit)given at section 1.1 under Section-Iof Annexure-A duly vetted by theOEM of MSS sub-system (OEMslisted at Annexure-K).The technicalsuitability of the OEM/productchosen by the bidder shall beveriï¬ed through a Proof of Concept(PoC) during technical bidevaluation as speciï¬ed in clause13.4. 12.3 The bidder must furnish thecomplete Bill of Material (BoM) ofoffered RTIS devices & its OS on theletter head of respective OEMs dulyvetted by the respective OEMs. 12.4 The bidder shall furnishdocumentary proof of backendsupport includingsoftware/ï¬rmware upgrades andavailability of spares for a period of08 years for RTIS device as well asthe documentary proof of backendsupport from respective OEMs ofPage 6 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30support from respective OEMs ofthe MSS sub-system (listed inAnnexure-K)as per Annexure-E,RTIS device and its OS as perAnnexure-E1and also from theMobile data service providers asper Annexure-F. 12.5 The bidder shall furnish a planfor carrying out implementation &maintenance works. The biddershall provide list of its customersupport offices in the country fromwhere the support shall beprovided. Detailed site-wise supportplan shall be furnished by thebidder as per Performa given inAnnexure ? G of Tender Document. 12.6 The bidder must furnish theSchedule of Requirement (SoR) asper Annexure-D as part of thetechnical bid clearly specifyingmodel and make of the offeredproducts. 12.7 The bidder must furnishtechnical literature/datasheets &complete technical speciï¬cations ofRTIS device& its sub-componentsviz. GAGAN/NavIC receiver, 5G/4Gmodule/controller, OS,Display/Panel PC, Antennae, MSSsub-system in RMT-L, RF frontend inRMT-L, power supply module, 2.4GHz RF etc and implementationplan including timelines. 12.8 Details of additional systemcomponents which bidder proposes(if any) to include for meeting thesystem requirements. 12.9 Item wise compliance to all theclauses of the Bid document Part-IIof the tender document. 12.10 In case any clause orcondition is not acceptable to thebidder, it should clearly specify inStatement of Deviations as performat available onwww.ireps.gov.in. 12.11 The vendor shall providedetails of its manufacturingarrangement and capacity. 12.12 The bidder shall provideCertiï¬ed audited copies of BalanceSheets/Proï¬t & Loss Accounts/Annual Reports of last threeï¬nancial years i.e. 2020-21, 2021-22 and 2022-23 shall be submitted.12.13 All documents which arespeciï¬ed in SBD Part-I of biddocument 12.14 The complete checklist isPage 7 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:3012.14 The complete checklist isplaced at Annexure-H6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 5344424.pdf SBD Part-I2 5344514.pdf Bid document -IIThe tenderers in their bid shall indicate the details of their GST Jurisdictional Assessing Officers(Designation, Address & email id). In case of a contract award, a copy of Purchase Order shall beimmediately forwarded by Purchaser to the GST Jurisdictional assessing officer mentioned in Tenderers bidThis tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issuedby Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Boardletter no. 2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violateprovisions of GFR regarding procurement through GeM.Digitally Signed By AMPII ( RISHABH JUYAL ) |
| 8 | Comprehensive AMC (CAMC) of RTIS Devices, Cabling, other Equipment/Accessories etc. supplied in a supply order for a period 05 Years after expiry of 01 years Warranty Period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers8 8 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-1) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers9 9 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-2) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 0 Days of issue of Contract, Detailed deliveryCompletion : Within 392 Days thereafter schedule is given inclause 17 of BidDocument Part-II.Payment TermsS.No DescriptionPayment Terms1 1. Payment on delivery milestones: 80% of cost of RTIS devices (Item no.1 of SoR) and 80% of costof one time charges of 4G SIMs (Item no.3, 4 of SoR) shall be done on completion of each deliverymilestone. 2. Payment on Installation milestone: 80% of cost of installation of RTIS devices (Itemno.2 of SoR) shall be done on completion of each installation & integration milestone. 3. Payment oncommissioning milestone: a) Remaining 20% of the cost of total nos of RTIS devices deliveredagainst supply order (Item no. 1) b) Remaining 20% of the cost of installation of total nos of RTISdevices installed against supply order (Item no 2 of SoR). c) Remaining 20% of the cost of one timecharges of M2M SIMs (Item no 3, 4 of SoR) 4. Payment during warranty Services: a) 50% of the rentalof 4G SIMs for ï¬rst year (Item no. 5, 6 of SoR) after completion of six months of warranty supportperiod after commissioning b) Remaining 50% of the rental of 4G SIMs for ï¬rst year (Item no. 5, 6 ofSoR) after completion of one year of warranty support period commissioning 5. Payment forComprehensive AMC: After the expiry of 01 year warranty period post commissioning, CAMC chargesand SIMs Rental Charges (Item no. 7, 8 & 9 of SoR) shall be payable on half yearly basis aftercompletion of 06 months of satisfactory maintenance during the period under consideration. CAMCCharges & SIMs Rental Charges shall be calculated on pro-rata basis for item no. 7, 8 & 9 of SoR.However no payment shall be made without submission of half yearly preventive maintenancereports. For more details clause no. 19 of Bid Document Part-II be referred4. ELIGIBILITY CONDITIONSPage 2 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30Important All documents uploaded and remarks / confirmation entered by the bidders against anyeligibility condition shall be opened as part of technical bid only:Special Eligibility CriteriaS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 9.1 All the criteria given in table Normal Applicable to Yes No Allowedbelow are mandatory for all bidders (Mandatory)qualification . 9.2 Consortium/JV bidding is alsoallowed. Bidder/s shall comply allthe conditions w.r.t Joint Venture/Consortium Bidding mentioned inSBD part-I. Bidder shall also furnishapplicable annexure (Annexure-11/Annexure-12) available in SBDpart-I. 9.3 In case of Consortium/JVbidding, credentials of members ofConsortium/JV as given in clauseno. 8.15 to 8.18 of SBD Part-I shallbe applicable. In case of non-consortium/non-JV bid, credentialsof affiliated companies like ParentCompany, Strategic Business Unit,Group Company, sister company,associate company, SubsidiaryCompany, etc. will not be taken intoconsideration. The criteria must bemet by the entity bidding in thetender. 9.4 The bidder must ensure thatthe requisite documents/detailstowards qualiï¬cation Criteria aresubmitted along with bid.Compliance of qualiï¬cation criteriaparameters and details ofassociated documents should befilled in the format as per Annexure-H. Bids not accompanied by all therequired documents mentioned areliable to be considered only basedon the documents/details furnishedwith the bid. However, CRISreserves the right to seekclariï¬cations from the bidderswherever considered necessary. 9.5 CRIS reserves the right to verifythe authenticity of the documentssubmitted by the bidders. For Qualiï¬cation CriteriaParameters please refer clause no.9.6 of bid document part-II.5. COMPLIANCE CONDITIONSImportant All documents uploaded and remarks / confirmation entered by the bidders against any: compliance condition shall be opened as part of technical bid only.Commercial-ComplianceS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed UploadingPage 3 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:301 Please enter the percentage of local Normal Applicable to No Yes Allowedcontent in the material being all bidders (Optional)offered. Please enter 0 for fullyimported items, and 100 for fullyindigenous items. The deï¬nitionand calculation of local contentshall be in accordance with theMake in India policy as incorporatedin the tender conditions.Other ConditionsS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 The tender is for entering into Rate Normal Applicable to No No Not Allowedcontract for a period of 03 years all biddersfrom the date of signing of RC forsupply, transportation to the Site,Preliminary testing, Installation &Integration, Trainings, AcceptanceTesting & Commissioning of RTISdevices (Indoor & Outdoor Unitsalong with cabling, ï¬xtures etc.)including M2M SIMs/services(5G/4G) from 02 different MobileService Providers (MSPs) with APN(Access Point Name) conï¬gurationfor CRIS/Railways.The vendor shallbe responsible for integration ofRTIS devices with existing systemcomponents (i.e. RTIS systemcomponents implemented in Phase-1 and Phase-2 of the project) andmaking them functional as perfunctional requirementspeciï¬cations given in section-II ofAnnexure-A (bid doc Part-II). CRISshall provide necessary support tofacilitate the same. The RTISdevices shall function in accordancewith the system architecture givenin section-2.0 above. The technicalspeciï¬cations of RTIS devices aregiven in Annexure-A (bid doc Part-II). The considerations for physicaldesign of RTIS device includingdimensions (maximum) have beenspeciï¬ed in item no. 1.6 (section-I)of Annexure-A (bid doc Part-II). Thephysical design of RTIS device shallbe prepared by the vendor basedon these design considerations.Warranty of RTIS device shall be forone year after date ofacceptance/commissioning of lastlot of device in the Supply Orderfollowed by 05year comprehensiveAMC (CAMC). Detailed scope ofwork is given in clause 4 & clause 7of Bid Document Part-II2 Liquidated damages (LD) for Normal Applicable to No No Not Alloweddelay in delivery : 18.1. LD on all biddersdelay in delivery of RTIS devicesalong with SIMs (Milestones M1, M2,M3?.) : LD shall be applicable ondelayed portion of the supply only;@0.5% of the total all inclusive costof RTIS devices & M2M SIMs (itemno. 1, 3 & 4 of SoR) which arePage 4 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30delivered late as per deliverytimelines deï¬ned for the milestonefor each week or part thereof. AnRTIS device shall be considered asdelivered only when all associatedcomponents of the device viz. SIMs,Cables, Connectors, MCBs aredelivered along with the RTISdevice. The total LD levied / to belevied on delivery milestone shallnot exceed 10% of the total valueof supply of RTIS devices & M2MSIMs (item no. 1, 3 & 4 of SoR) tobe delivered in that milestone.18.2. LD on delay in completion ofS2 milestone (in case BPC is to begiven based on performance ofmilestone S2 otherwise LD as per18.3 shall be applicable): LD shallbe applicable on complete quantityof RTIS devices to be installed &integrated under milestone S2;@0.5% of the total all inclusive costof RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) to be installed & integrated inthe milestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.3. LD on delay in theinstallation& integration of Locodevices (Post BPC installationmilestones S3, S4?): LD shall beapplicable only on the deviceswhich are installed & integratedlate; @0.5% of the total all inclusivecost of RTIS devices includinginstallation services, M2M SIMs &Rentals (item no. 1, 2, 3, 4, 5, 6 ofSoR) which are not installed withinthe timelines stipulated for themilestone for each week or partthereof. The LD shall not beapplicable on those devices whichare installed late on account ofdelay on the part of CRIS/Railways.18.4. LD on commissioningmilestone: LD shall be applicableon complete quantity of RTISdevices & M2M SIMs to becommissioned under that supplyorder; @0.5% of the total allinclusive cost of the entire quantityof RTIS devices, installationservices, M2M SIMs & Rentals (itemno. 1 to 6 of SoR) for each week orpart thereof. The total LD levied / tobe levied on the supply orderincluding LD alreadylevied/applicable for above delivery(M1, M2, M3?) & installationmilestones (S2, S3, S4?) shall notexceed 10% of the total cost of RTISPage 5 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30devices, installation services, M2MSIMs & Rentals (Item no. 1 to 6 ofSoR).Pls refer clause 18 of RFP Part-II docfor detailed LD & LD waiverconditionsTechnical-CompliancesS.No. Description Template Condition Confirmation Remarks DocumentsApplicability Required Allowed Uploading1 Technical Requirements: Normal Applicable to No No Allowed12.1 Bidder should furnish the list all bidders (Mandatory)of make & model of all the offeredproducts including the Sub-components detail of RTIS deviceson his letter head. 12.2 Detailed technicalspeciï¬cations, FunctionalRequirement Speciï¬cations (FRS) ofRTIS devices and Hardware &Software Test Cases are given inAnnexure-A. The bidder mustsubmit an item wise compliance tothe technical speciï¬cations, FRS &Test Cases specific to this tender onits letter head. The Model and Makeof the offered RTIS device should beclearly speciï¬ed in this compliancedocument. The list of competentvendors/OEMs with experience indevelopment of MSS terminalprovided by Space ApplicationsCentre (SAC), ISRO, Ahmedabad isgiven in Annexure-K. The biddershall source MSS sub-system (MSSTransmit & Receive chain includingRF frontend) of RTIS device fromone of the OEMs recommended bySAC, ISRO (listed at Annexure-K).The bidder must also submit item-wise compliance to technicalspeciï¬cations of Rail MSS terminal-Locomotive (RMT-L; Outdoor Unit)given at section 1.1 under Section-Iof Annexure-A duly vetted by theOEM of MSS sub-system (OEMslisted at Annexure-K).The technicalsuitability of the OEM/productchosen by the bidder shall beveriï¬ed through a Proof of Concept(PoC) during technical bidevaluation as speciï¬ed in clause13.4. 12.3 The bidder must furnish thecomplete Bill of Material (BoM) ofoffered RTIS devices & its OS on theletter head of respective OEMs dulyvetted by the respective OEMs. 12.4 The bidder shall furnishdocumentary proof of backendsupport includingsoftware/ï¬rmware upgrades andavailability of spares for a period of08 years for RTIS device as well asthe documentary proof of backendsupport from respective OEMs ofPage 6 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:30support from respective OEMs ofthe MSS sub-system (listed inAnnexure-K)as per Annexure-E,RTIS device and its OS as perAnnexure-E1and also from theMobile data service providers asper Annexure-F. 12.5 The bidder shall furnish a planfor carrying out implementation &maintenance works. The biddershall provide list of its customersupport offices in the country fromwhere the support shall beprovided. Detailed site-wise supportplan shall be furnished by thebidder as per Performa given inAnnexure ? G of Tender Document. 12.6 The bidder must furnish theSchedule of Requirement (SoR) asper Annexure-D as part of thetechnical bid clearly specifyingmodel and make of the offeredproducts. 12.7 The bidder must furnishtechnical literature/datasheets &complete technical speciï¬cations ofRTIS device& its sub-componentsviz. GAGAN/NavIC receiver, 5G/4Gmodule/controller, OS,Display/Panel PC, Antennae, MSSsub-system in RMT-L, RF frontend inRMT-L, power supply module, 2.4GHz RF etc and implementationplan including timelines. 12.8 Details of additional systemcomponents which bidder proposes(if any) to include for meeting thesystem requirements. 12.9 Item wise compliance to all theclauses of the Bid document Part-IIof the tender document. 12.10 In case any clause orcondition is not acceptable to thebidder, it should clearly specify inStatement of Deviations as performat available onwww.ireps.gov.in. 12.11 The vendor shall providedetails of its manufacturingarrangement and capacity. 12.12 The bidder shall provideCertiï¬ed audited copies of BalanceSheets/Proï¬t & Loss Accounts/Annual Reports of last threeï¬nancial years i.e. 2020-21, 2021-22 and 2022-23 shall be submitted.12.13 All documents which arespeciï¬ed in SBD Part-I of biddocument 12.14 The complete checklist isPage 7 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRISTENDER DOCUMENTTender No 01255079A Closing Date/Time 22/04/2025 15:3012.14 The complete checklist isplaced at Annexure-H6. DOCUMENTS ATTACHED WITH TENDERS.No. Document Name Document Description1 5344424.pdf SBD Part-I2 5344514.pdf Bid document -IIThe tenderers in their bid shall indicate the details of their GST Jurisdictional Assessing Officers(Designation, Address & email id). In case of a contract award, a copy of Purchase Order shall beimmediately forwarded by Purchaser to the GST Jurisdictional assessing officer mentioned in Tenderers bidThis tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issuedby Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Boardletter no. 2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017 and amendments/ revisions thereof.As a Tender Inviting Authority, the undersigned has ensured that the issue of this tender does not violateprovisions of GFR regarding procurement through GeM.Digitally Signed By AMPII ( RISHABH JUYAL ) |
| 9 | SIMs Rental (MSP-1) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers9 9 AMC (Y) Non Stock --- Yes CONSIGNEE INR SIMs Rental (MSP-2) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers3. T AND CF.O.RDescriptionDestinationDelivery PeriodDescription Delivery /Completion Rate of SupplyFor all items Commencement : Within 0 Days of issue of Contract, Detailed deliveryCompletion : Within 392 Days thereafter schedule is given inclause 17 of BidDocument Part-II.Payment TermsS.No DescriptionPayment Terms1 1. Payment on delivery milestones: 80% of cost of RTIS devices (Item no.1 of SoR) and 80% of costof one time charges of 4G SIMs (Item no.3, 4 of SoR) shall be done on completion of each deliverymilestone. 2. Payment on Installation milestone: 80% of cost of installation of RTIS devices (Itemno.2 of SoR) shall be done on completion of each installation & integration milestone. 3. Payment oncommissioning milestone: a) Remaining 20% of the cost of total nos of RTIS devices deliveredagainst supply order (Item no. 1) b) Remaining 20% of the cost of installation of total nos of RTISdevices installed against supply order (Item no 2 of SoR). c) Remaining 20% of the cost of one timecharges of M2M SIMs (Item no 3, 4 of SoR) 4. Payment during warranty Services: a) 50% of the rentalof 4G SIMs for ï¬rst year (Item no. 5, 6 of SoR) after completion of six months of warranty supportperiod after commissioning b) Remaining 50% of the rental of 4G SIMs for ï¬rst year (Item no. 5, 6 ofSoR) after completion of one year of warranty support period commissioning 5. Payment forComprehensive AMC: After the expiry of 01 year warranty period post commissioning, CAMC chargesand SIMs Rental Charges (Item no. 7, 8 & 9 of SoR) shall be payable on half yearly basis aftercompletion of 06 months of satisfactory maintenance during the period under consideration. CAMCCharges & SIMs Rental Charges shall be calculated on pro-rata basis for item no. 7, 8 & 9 of SoR.However no payment shall be made without submission of half yearly preventive maintenancereports. For more details clause no. 19 of Bid Document Part-II be referred4. ELIGIBILITY CONDITIONSPage 2 of 8 Run Date/Time: 25/03/2025 17:09:25PROCUREMENT/CRIS |
| 10 | SIMs Rental (MSP-2) during CAMC period of 05 years after expiry of warranty period [ Warranty Period: 1 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ]At (Location) CCODE-CN Delhi 12000.00 Numbers |
Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail