Water Resources and Irrigation Government Departments Closing in 0 days TDR #48423849

Urgent Repairing And Maintenance Of Existing Damaged Wooden Bridge At Kanpur (Dakhin Barendali) Over Hara Khal At Mouza-Jamberia, G.P- 2 No. Rajarampur ,Block-Kulpi, Dist-South 24Pgs

Issued by Government Departments · kulpi, West Bengal
Tender Value
10.92 Lakhs
Estimated cost
Bid Submission
08 Apr 2025
0 days left
EMD
21855
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
kulpi → West Bengal
EMD Exemption
Available
Quantity
Not Available

Project Description

Urgent Repairing And Maintenance Of Existing Damaged Wooden Bridge At Kanpur (Dakhin Barendali) Over Hara Khal At Mouza-Jamberia, G.P- 2 No. Rajarampur ,Block-Kulpi, Dist-South 24Pgs

BOQ

Name of Work: \"Urgent repairing and maintenance of existing damaged Wooden Bridge at Kanpur (Dakhin Barendali) over Hara Khal at Mouza-Jamberia, G.P- 2 No. Rajarampur ,Block-Kulpi, Dist-South 24Pgs.\"
Sl. No. Item Description
1Labour charges for taking out old wood work including cutting bolts and nuts and stacking within a lead of 100 metre etc. complete as per the direction of the Engineer-in- harge. (The quantum should be corrected upto 3 decimels)
2Taking out Jhaw / Eucalyptus piles from river bed or from elsewhere including carrying, stacking materials in the nearest stack yard.(b) Above 17.5 cm. and up to 25 cm. diameter
3Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.Note:Diameter of pile to be measured at a distance of 1.5m from the thicker end.
4(v) 20 cm av. Diameter
5(iii) 15 cm av. Diameter
6Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.Note: 1)Payment to be made on the length driven in to the ground. Diameter to be measured at 1.5m. from the thicker end.
7(v) 20 cm av. diameter
8(iii) 15 cm av. Diameter
9Supplying, dressingand stacking at site bamboo pins above 5 cm. diameter and upto7.5 cm. diameter. (Dia. to be measured at mid length).
10Best Seasoned wood work in shutters, posts, plates, rafters, battens, trusses, beams, purlins, bargas, wheel-guards, running boards, frames etc. including supplying at site, handling, hoisting, fitting & fixing in position excluding the cost of bolt and nuts only but including the cost of nails and screws with cost and carriage of all materials complete as per the direction of the Engineer-in-charge. (The quantum should be corrected upto 3 decimels)(b) Hard Wood (Mahua / Arjun / Tentul etc or similar quality hard wood as approved by the Engineer-in-charge)
11Labour charges for old or new wood work including hoisting, fitting & fixing including supplying new nails and screws wherever necessary etc. complete as per the direction of the Engineer-in-charge. (Thequantum should be corrected upto 3 decimels)
12M.S. structural works in columns, beams etc. with simple rolled structural members (e.g. joists, angle, channel sections conforming to IS: 226, IS: 808 & SP (6)- 1964 connected to one another with bracket, gussets, cleats as per design, direction of Engineer-incharge complete including cutting to requisite shape and length, fabrication with necessary bolting, metal arc welding conforming to IS: 816- 1969 & IS: 1995 using electrodes of approved make and brand conforming to IS:814- 2004, haulage, hoisting and erection all complete. The rate includes the cost of rolled steel section, consumables such as electrodes, gas and hire charge of all tools and plants and labour required for the work including all incidental chages such as electricity charges, labour insurance charges etc.
13Payment to be made on the basis of calculated weight of structural members only in finished work as per IS specified weight. Payment for gusset, bracket, cleat, rivets, bolts and nuts may be make by adding the actual weight of such items with the weight of finished structural members or 7% of weight for finished structural members weighing not less than 22.5 Kg. / m. or 15 % of weight for finished structal members weighing less than 22.5 Kg. / m. may be increased allow for bracket, cleat, rivet, bolts and nuts etc. and no seperate payment being made for these items, as per direction of Engineer In Charge. The rates are considered for a height of erection 8m. / 2nd floor level from the ground. Add 1.5% extra over the rate for each additional floor or 4m. beyond initiial 8m. or part thereof.
14III) For built up sections / srtuctural members of specified sections weighing not less than 22.5 kg./m
15Painting on steel or other metal surface with any approved bituminous anticorrosive paint after preparing the surface including removing paints, cleaning, smoothening etc. including scaffolding where necessary including cost of all materials complete.b) Two Coat(Long beam)
16Supplying at site and fitting & fixing Mild Steel long nuts & bolts etc.complete as per the direction of the Engineer-in-charge.
17Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus.
18Driving bamboo pins in standing or flowing water including scaffolding and driving appliances. (b) Where boats are necessary.
19Supplying, fitting and fixing with iron nails half split bamboo wailing pieces (av.dia.of bamboo not less than 5.0 cm.)
20Coal tarring with 5% pitch including cost of material and labour complete as per direction of the Engineer-in-chargeb) Two Coat
21Priming one coat on timber or plastered surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. (This item is applicable to new work or old work when the original surface has been exposed by removal of old paint.)
22Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary :(a) On timber or plastered surface :With other than hi-gloss of approved quality.(iv) Two coat (with any shade except white)
23Supplying to site empty cement polythene bags (capacity 50kg) in good condition including stacking, incedental charges etc. all complete(capacity 50 kg).
24Labour charges for filling empty cement gunny bag / polythene bag (capacity 50 kg) with all kinds of earth (wet or dry), sand or agreegates(stone / brick) and sewing as done in case of cement bags ,( tying with a knot after filling will not be accepted ) , and stacking within a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials).NB:- Volume of earth/ sand filled bags should not be less than 0.028 cum/ bag.
25Dumping in position earth / sand filled gunny / poly bags (capacity 50 kg) within a lead of 30 metre inclusive of all lifts
26Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead ofE) Beyond 4.00 km and upto 5.00 km,NB :- Measurement to be taken on the basis of stack measurement / prepost work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note: For compensation of earth for land owned and arranged by contractor add 25.00 per Cum extra over rate of E/W for land woned /arranaged by the Department. Royalty charge on earth @ 29.00 Per Cum and cesses charges @ 5.30/ cum (ie Rs 15 per 100 cft )as per Govt. notification, which will be paid on production of necessary document in support of payment made towards royalties& cesses.

AI Tender Summary

OUR REF NO 48423849
AUTHORITY Government Departments
TENDER VALUE 10.92 Lakhs
LAST DATE 08-04-2025
Authority
Authority Name Irrigation and Waterways Department
Work Description Urgent Repairing And Maintenance Of Existing Damaged Wooden Bridge At Kanpur (Dakhin Barendali) Over Hara Khal At Mouza-Jamberia, G.P- 2 No. Rajarampur ,Block-Kulpi, Dist-South 24Pgs
Basic Detail
Tender No WBIW/EE-II/CD/e-NIT41e/2024-25
Bidding Type Tender
Location
City kulpi
State West Bengal
Key Dates
Publish Date 25 Mar 2025
Submission Date 08 Apr 2025
Open Date 08 Apr 2025
Finance
Tender Value 10.92 Lakhs
Tender Fee Ref. Documents
EMD 21855
Exemption Available
Document List
BOQ_1849078.xls
FORMS.pdf
serial3.pdf
Tendernotice_1.pdf
1c5a14f0-6169-4cea-95c5-d8bc3a18bf3e.html
2911.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 25, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 08, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 08, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1849078.xls

pdf

FORMS.pdf

pdf

serial3.pdf

pdf

Tendernotice_1.pdf

html

1c5a14f0-6169-4cea-95c5-d8bc3a18bf3e.html

pdf

2911.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail