Housing Urban and Rular Development Government Departments Closing in 0 days TDR #48417420

Tender For Improvement Of District Headquarter Township Road At Boleng

Issued by Government Departments · Siang, Arunachal Pradesh
Tender Value
17.82 Crore
Estimated cost
Bid Submission
31 Mar 2025
0 days left
EMD
17.83 Lakhs
Bank guarantee accepted
Document Fee
7500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Siang → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Improvement Of District Headquarter Township Road At Boleng

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 25-Mar-2025 Corrigendum of Class Other 31-Mar-2025

BOQ

Name of Work:Improvement of District Headquarters Township road at Boleng
Sl. No. Item Description
1SH:- Road from BRTF to Punying area via Food and Civil Supply OfficeSH : FORMATION CUTTING.
2ExcavationinHillAreainSoilbyMechanical Means(Dipositingofexcavatedearthwithall lifts and lead upto 1000 mExcavation in soil in hilly area by mechanical means includingcuttingandtrimmingofsideslopesand disposing of excavated earth with all lifts and lead upto 1000 metres.
3ExcavationinHillyAreainOrdinaryRockby MechanicalMeansnotRequiringBlasting (Disposalofcutmaterialwithallliftandlead upto 1000 m)Excavation in hilly area in ordinary rock not requiringblastingbymechanicalmeansincluding cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.
4ExcavationinHillyAreasinHardRock RequiringBlasting(Disposalofcutmaterial with all lift and lead upto 1000 m).Excavationinhillyareasinhardrockrequiring blasting,bymechanicalmeansincludingtrimming ofslopesanddisposalofcutmaterialwithalllifts and lead upto 1000 metres.
5SH : C.C. PAVEMENT.
6Preparation of sub grade by excavating earth to an average depth of 22.5 cm, dressing to camber and consolidating with road roller, making good the undulation etc. and disposal of surplus earth , lead upto 50 m
7Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401).(i) for grading- I Material.
8Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
9(Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )
10Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
11Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
12Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road (from Pasighat to Boleng work site lead-97.00 km)
13b) Sand , Aggregate and other materials.iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to work site: Lead 1.500 km)
14SH : RCC SLAB CULVERT 1.50 MTR. SPAN
15Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)I. Ordinary SoilA. Manual Means(i) upto 3 m depth
16PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
17Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical SpecificationsCoursed rubble masonary (first sort)
18Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsB. PCC Grade M15(p) Height upto 5m
19Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A. Granular material
20Providing weep holes in Brick masonry /Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipe extending through the full width of the structure with slope of IV : 20 H towards drawing foce. Complete as per drawing and Technical specification.
21Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical SpecificationA. RCC Grade M20Case-I : Using Concrete Mixer(i) For solid slab super-structure,20-30% of (a+b+c)(p) Height upto 5m
22a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
23Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
24Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
25Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road (from Pasighat to Boleng work site lead-97.00 km)
26b) Sand , Aggregate and other materials.iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to work site: Lead 1.500 km)
27SH : RCC SLAB CULVERT 2.00 MTR. SPAN
28Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)I. Ordinary soilA. Manual Means(i) upto 3 m depth
29PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
30Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical SpecificationsCoursed rubble masonry (first sort )
31Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsB. PCC Grade M15(p) Height upto 5m
32Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A. Granular material
33Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipem extending through the full width of the structure with slope of IV : 20 H towards drawing foce. Complete as per drawing and Technical specification.
34Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical SpecificationA. RCC Grade M20Case-I. Using Concrete Mixer(i) For solid slab super-structure,20-30% of (a+b+c) (p) Height upto 5m
35a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
36Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
37Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
38Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road (from Pasighat to Boleng work site lead-97.00 km)
39b) Sand , Aggregate and other materials.iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to work site: Lead 1.500 km)
40SH : RETAINING WALL 3.00 MTR. HEIGHT.
41Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)Ordinary soilManual Means (Depth upto 3 m)
42Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
43Stone masonry work in cement mortar 1:3 in Foundation complete as per drawing and Technical Specifications.Random Rubble Masonry
44Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
45Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
46Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
47Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
48Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road (from Pasighat to Boleng work site lead-97.00 km)
49b) Sand , Aggregate and other materials.iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to work site: Lead 1.500 km)
50SH : C.C. DRAIN
51Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)Ordinary soilManual Meansupto 3 m depth
52Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :
5312 mm Cement plaster in 1: 4 (1 Cement : 4 Fine sand )
54Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
55Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
56Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road (from Pasighat to Boleng work site lead-97.00 km)
57b) Sand , Aggregate and other materials.iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to work site: Lead 1.500 km)
58SH:- BRTF Road to Gandhi village via PWD HelipadSH : WIDENING.
59ExcavationinHillAreainSoilbyMechanical Means(Dipositingofexcavatedearthwithall lifts and lead upto 1000 mExcavation in soil in hilly area by mechanical means includingcuttingandtrimmingofsideslopesand disposing of excavated earth with all lifts and lead upto 1000 metres.
60ExcavationinHillyAreainOrdinaryRockby MechanicalMeansnotRequiringBlasting (Disposalofcutmaterialwithallliftandlead upto 1000 m)Excavation in hilly area in ordinary rock not requiringblastingbymechanicalmeansincluding cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres.
61Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.(i) Surfaced Road (lead-4.500 km)
62SH : C.C. PAVEMENT.
63Preparation of sub grade by excavating earth to an average depth of 22.5 cm, dressing to camber and consolidating with road roller, making good the undulation etc. and disposal of surplus earth , lead upto 50 m
64Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401).(i) for grading- I Material.
65Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
66(Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )
67Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
68Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
69Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
70b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-3.700 km
71iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)
72SH : SLAB CULVERT 1.50 MTR. SPAN
73Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)I. Ordinary SoilA. Manual Means(i) upto 3 m depth
74PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed,placed in foundation and compacted by vibration including curing for 14 days.)
75Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical SpecificationsCoursed rubble masonry (first sort )
76Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specificationsB. PCC Grade M15(p) Height upto 5m
77Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A. Granular material
78Providing weep holes in Brick masonry /Plain/Reinforced concrete abutment, wing wall/return wall with 100mm dia AC pipe extending through the full width of the structure with slope of IV : 20 H towards drawing foce. Complete as per drawing and Technical specification.
79Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical SpecificationA. RCC Grade M20Case I. Using Concrete Mixer(i) For solid slab super-structure,20-30% of (a+b+c)(p) Height upto 5m
80a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
81Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
82Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
83Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
84b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-3.700 km
85iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)
86SH : RETAINING WALL 3.00 MTR. HEIGHT.
87Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)Ordinary soilManual Means (Depth upto 3 m)
88Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
89Stone masonry work in cement mortar 1:3 in Foundation complete as per drawing and Technical Specifications.Random Rubble Masonry
90Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
91Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material
92Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
93Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
94Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
95b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-3.700 km
96iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)
97SH : C.C. DRAIN
98Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out,construction of shoring and bracing,removal of stumps and other deleterious matter,dressing of sides and bottom and backfilling with approved material.)Ordinary soilManual Meansupto 3 m depth
99Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :
10012 mm Cement plaster in 1: 4 ( 1 Cement : 4 Fine sand )
101Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
102Loading and Unloading of Stone Boulder / Stone aggregates / Sand / Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stones by Manual Means for hill roads.
103Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
104b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-3.700 km
105iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)
106SH:- Road from Govt Sec. School trijunction to BRTF RoadSH : C.C. PAVEMENT.
107Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
108(Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )
109Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
110Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
111Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
112b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-4.000 km
113iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)
114SH:- Raja Colony roadSH : C.C. PAVEMENT.
115Preparation of sub grade by excavating earth to an average depth of 22.5 cm, dressing to camber and consolidating with road roller, making good the undulation etc. and disposal of surplus earth , lead upto 50 m
116Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401).(i) for grading- I Material.
117Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
118(Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )
119Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.
120Loading and Unloading of Stone Boulder / Stone aggregates / Sand /Kanker/Moorum / Lime / Shingle / Earth / Excavated Rock and Kerb Stone for hill roads. Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip.
121Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking.a) Cement and Steel(i) Surfaced Road From Pasighat to Boleng work site lead-97.00 km
122b) Sand , Aggregate and other materials.(i) Surfaced Road (from Simang Bridge point t to Boleng work site lead-5.000 km
123iii) Katcha Track and Track in River Bed/Nallah Bed and Choe Bed.( from Boleng quarry to Simang Bridge point : Lead 1.500 km)

AI Tender Summary

OUR REF NO 48417420
AUTHORITY Government Departments
TENDER VALUE 17.82 Crore
LAST DATE 31-03-2025
Authority
Authority Name Public Works Department
Work Description Improvement Of District Headquarter Township Road At Boleng
Basic Detail
Tender No BD/e-NIT/CMCSRDP-II/2024-25/08
Bidding Type Tender
Location
City Siang
State Arunachal Pradesh
Key Dates
Publish Date 25 Mar 2025
Submission Date 31 Mar 2025
Open Date 01 Jan 0001
Finance
Tender Value 17.82 Crore
Tender Fee 7500
EMD 17.83 Lakhs
Exemption Not Available
Document List
TenderDoc.pdf
Tendernotice_1.pdf
bb034822-51e6-4fb9-a83a-06ba36483d03.html
BOQ_2597.xls

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 25, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 31, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Mar 31, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
pdf

TenderDoc.pdf

pdf

Tendernotice_1.pdf

html

bb034822-51e6-4fb9-a83a-06ba36483d03.html

xls

BOQ_2597.xls

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders