| 1 | vf/k’kklh vfHk;Urk] fo|qr forj.k [k.M&f}rh;] vktex<+ ds dk;Z{ks= esa lseh&VuZdh ij ¼eq[;ea=h uxj l`tu ;kstuk o\"kZ 2024&25½ ds vUrxZr uxj iapk;r egjktxat ds vUrxZr csdk: pkSd esa 250 ds0oh0,0 ifjorZd ds lkFk 1-4 fdeh0 ,y0Vh0 ,0ch0lh0] mlqjdqMok ess 250 ds0oh0,0 ifjorZd sds lkFk 4 fdeh0 ,y0Vh0 ykbu ,oa v{k;oV iapk;r Hkou esa vfrfjDr 250 ds0oh0,0 ,oa 1-8 fdeh0 ,y0Vh0 ,0ch0lh0 ykbZu fuekZ.k ,oa vU; lEcfU/kr dk;Z izkDdyu vuqlkjZ ¼leLr lkexzh dh ynkbZ] |
| 2 | uxj iapk;r egjktxat ds vUrxZr csdk: pkSd esa ACSR Weasel Conductor, 50 Mtr, PCC Pole 8.5 Mtr, 25 Nos, Cable L.T. XLPE 1x25 Sq. mm, 30 Mtr, STP 11 Mtr, 2 Nos, 11 KV Draw out fuse set, 3 Nos, Earth Rod 2540x20 Sq mm. 6 Nos,Cable Alluminium 3.5x240 sq mm PVC, 15 Mtr, Circuit L.T. 500A/500V, 3 Nos, Distribution Box 3 Phase, 12 Nos, ABC L.T. (3x120+1x95+1x16) SQ M.M., 3300 Mtr yxkdj leLr fQfVax ds lkFk ,y0Vh0 ,0ch0lh0 ykbu fuekZ.k ,oa vU; izkDdyu vuqlkj lEcfU/kr dk;ZADismentaling and carrage to store old, 1 Nos.Re-Erection of Tilled Pole with Fitting, 3 Nos. |
| 3 | Instalationof 250 KVA TF Including Related work |
| 4 | Loading Unload and crrage From store to site or veice Versa |
| 5 | Erection of HT pole 11 mtr long |
| 6 | Painting of HT pole |
| 7 | Erection of DO fuse set |
| 8 | Providing of LT Cercuite |
| 9 | Erection of TPMO Switch |
| 10 | Making Jumpers from HT line |
| 11 | Providing 40 MM dia G.I. Pipe and 60 feet deep boar Boaring Earthing including cost of matarial |
| 12 | TF faincing |
| 13 | making plinth for Distribution TF |
| 14 | Erection of PCC pole 8.5 long |
| 15 | Laying of L.T. ABC size 3X120 + 1X195+1x16 Sqmm |
| 16 | Erection of TPMO Switch |
| 17 | Fiting of 3 phase LT distribution Box Including related work |
| 18 | Fixing and grouting of Stay rod including related work |
| 19 | Fixing of earth rod 2540X20 MM |
| 20 | Concreating of Pole as per standered specefication |
| 21 | Proviting and fixing of Hoarding Board including typing |
| 22 | ACSR WEASEL CONDUCTOR |
| 23 | Feeting of 11 kv DROPPER ANGLE, top channel etc |
| 24 | 11 KV COMP. POLY. DISC INSULATOR 45 KN T&C |
| 25 | LT BARE NETURAL CONNECTOR 95 SQ MM |
| 26 | DEAD AND SEALING CAP |
| 27 | ALLIMUNIUM LUG 25 MM |
| 28 | DECENTRALIZED MATERIAL |
| 29 | Stay Insulator |
| 30 | SS BASE ANGLE |
| 31 | 11 KV TOP CHANNEL |
| 32 | Dead End Sealing Cap |
| 33 | Aluminium Lug 25 mm |
| 34 | Ltype Copper Clamp |
| 35 | Stone Pad |
| 36 | Distribution Box Clamp |
| 37 | Aluminium lug 120 mm |
| 38 | Dead end clamp |
| 39 | Piercing connector 95-25 SQ. MM |
| 40 | Eye-Hook |
| 41 | Suspension Clamp |
| 42 | T-off Clamp for 8.5 M PCC Pole |
| 43 | T-off Channen 11 kv |
| 44 | Alluminium Crimping Lug 400 SQ MM |
| 45 | MS Bolt & Nut (With 1-Washer) 1.25\"x3/8\" |
| 46 | Dropper Channal Clamp |
| 47 | uxj iapk;r egjktxat ds vUrxZr mlqjdqMok esa Earth Road 2540x20 mm, 54 Nos, Cable L.T. XLPE 1x25 SQ. M.M, 64 Mtr, Steel Tubler Pole 11 mtr, 4 Nos, PCC Pole 8.5 Mtr, 50 Nos, A.B. Cable L.T. (3x120+1x95+1x16) SQ M.M, 7000 Mtr, ACSR Weasel Conductor, 50 Mtr,Distribution Box 3 Phase, 36 Nos, LT Al. XLPE Cable (Unarmoured) 1x240 SQ mm. 60 Mtr,ds lkFk 250 ds0oh0,0 ifjorZd yxkdj leLr fQfVax ds lkFk ,0ch0lh0 ykbu dk fuekZ.k dk dk;Z ,oa vU; lEcfU/kr dk;Z izkDdyu ds vuqlkjADismentaling and carrage to store old, 1 Nos.Dismentaling of old Conductor, 2 Nos.Re-Erection of Tilled Pole with Fitting, 2 Nos. |
| 48 | Instalationof 250 KVA TF Including Related work |
| 49 | Loading Unload and crrage From store to site or veice Versa |
| 50 | Erection of HT pole 11 mtr long |
| 51 | Painting of HT pole |
| 52 | Erection of DO fuse set |
| 53 | Providing of LT Cercuite |
| 54 | Erection of TPMO Switch |
| 55 | Making Jumpers from HT line |
| 56 | Providing 40 MM dia G.I. Pipe and 60 feet deep boar Boaring Earthing including cost of matarial |
| 57 | TF faincing |
| 58 | making plinth for Distribution TF |
| 59 | Erection of PCC pole 8.5 long |
| 60 | Laying of L.T. ABC size 3X120 + 1X195+1x16 Sqmm |
| 61 | Erection of TPMO Switch |
| 62 | Fiting of 3 phase LT distribution Box Including related work |
| 63 | Fixing and grouting of Stay rod including related work |
| 64 | Fixing of earth rod 2540X20 MM |
| 65 | Concreating of Pole as per standered specefication |
| 66 | Proviting and fixing of Hoarding Board including typing |
| 67 | ACSR WEASEL CONDUCTOR |
| 68 | Feeting of 11 kv DROPPER ANGLE, top channel etc |
| 69 | 11 KV COMP. POLY. DISC INSULATOR 45 KN T&C |
| 70 | LT BARE NETURAL CONNECTOR 95 SQ MM |
| 71 | DEAD AND SEALING CAP |
| 72 | DECENTRALIZED MATERIAL |
| 73 | Stay Insulator |
| 74 | Dead End Sealing Cap |
| 75 | L Type Copper Clamp |
| 76 | Suspension Clamp |
| 77 | T-off Clamp for 8.5 M PCC Pole |
| 78 | Circuit L.T. 500A/500V |
| 79 | Eye-Hook |
| 80 | Stone pad |
| 81 | Dead end clamp |
| 82 | Alluminium Crimping Lug 400 SQ MM |
| 83 | Distribution Box Clamp |
| 84 | Alluminium Lugs 25 mm |
| 85 | MS Bolt & Nut (With 1-Washer) 1.25\"x3/8\" |
| 86 | Dropper Channal Clamp |
| 87 | Piercing connector 95-25 SQ. MM |
| 88 | Connector LT Aluminium |
| 89 | uxj iapk;r egjktxat ds vUrxZr v{k;oV iapk;r Hkou esa AB Cable L.T. (3x120+1x95+1x16) SQ. MM, 3500 M, LT Al. XLPE Cable (Unarmoured) 1x240 Sq mm, 24 Mtr, Stay wire 7/10 SWG, 50 Kg, Steel Tubler Pole 11 Mtr, 2 Nos, Cable L.T. XLPE 1x25 Sq, mm. 30 Mtr, ACSR Weasel conductor, 50 Mtr, PCC pole, 25 Nos,yxkdj leLr fQfVax ds lkFk ,0ch0lh0 ykbZu fuekZ.k dk dk;Z ,oa vU; lEcfU/kr izkDdyu ds vuqlkj dk;ZADismentaling and carrage to store old, 1 Nos.Re-Erection of Tilled Pole with Fitting, 3 Nos. |
| 90 | Erection of HT pole 11 mtr long |
| 91 | Painting of HT pole |
| 92 | Erection of DO fuse set |
| 93 | Providing of LT Cercuite |
| 94 | Erection of TPMO Switch |
| 95 | Making Jumpers from HT line |
| 96 | Providing 40 MM dia G.I. Pipe and 60 feet deep boar Boaring Earthing including cost of matarial |
| 97 | TF faincing |
| 98 | making plinth for Distribution TF |
| 99 | Erection of PCC pole 8.5 long |
| 100 | Laying of L.T. ABC size 3X120 + 1X195+1x16 Sqmm |
| 101 | Erection of TPMO Switch |
| 102 | Fiting of 3 phase LT distribution Box Including related work |
| 103 | Fixing and grouting of Stay rod including related work |
| 104 | Fixing of earth rod 2540X20 MM |
| 105 | Concreating of Pole as per standered specefication |
| 106 | Proviting and fixing of Hoarding Board including typing |
| 107 | ACSR WEASEL CONDUCTOR |
| 108 | Feeting of 11 kv DROPPER ANGLE, top channel etc |
| 109 | 11 KV COMP. POLY. DISC INSULATOR 45 KN T&C |
| 110 | LT BARE NETURAL CONNECTOR 95 SQ MM |
| 111 | DEAD AND SEALING CAP |
| 112 | DECENTRALIZED MATERIAL |
| 113 | Stay Insulator |
| 114 | Distribution Box Clamp |
| 115 | Suspension Clamp |
| 116 | Piercing connector 95-25 SQ. MM |
| 117 | Eye-Hook |
| 118 | Dead end clamp |
| 119 | MS Bolt & Nut (With 1-Washer) 1.25\"x3/8\" |
| 120 | T-off Clamp for 8.5 M PCC Pole |
| 121 | Dropper Channal Clamp |
| 122 | L Type Copper Clamp |
| 123 | Circuit L.T. 500A/500V |
| 124 | Aluminium Crimping Lug 400 SQ MM |
| 125 | Aluminium Lug 25 MM |
| 126 | Stone Pad |
| 127 | G.I wire 6 SWG |