| 1 | OPEN WELL |
| 2 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil |
| 3 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil |
| 4 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete |
| 5 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) |
| 6 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining |
| 7 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) |
| 8 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more |
| 9 | 50.6.1.7:Solid block masonry using pre cast solid blocks ( Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 15 cm in : CM 1:6 ( 1 cement : 6 coarse sand ) etc complete |
| 10 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) |
| 11 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 12 | 13.16.1:6 mm cement plaster of mix:1:3 ( 1 cement : 3 fine sand) |
| 13 | 13.43.1:Applying one coat of water thinnable cement primer of approved brand and manufacture on wall surface:Water thinnable cement primer |
| 14 | 51.18.12.6:Providing and fixing G.I. pipes complete with G.I. fittings (Cost of fittings to be paid separately)External work - 50 mm nominal dia |
| 15 | OD363431/2024-2025:Supply of suitable brand ISI marked Kirloskar/Deccan make new submersible electric drivenmotor pumpset suitable for 150mm dia Borewell working at 360voltage(IS-1422) with bronzeimpeller and stainless steel shaft having 3Lps discharge against 100m head with suitable ISImarked accessories such as starter, capacitor, ELCB, adequate length of copper cable, refluxvalve, sluice valve,pressure guage, earthing materials ammeter, voltmeter, selector switch,flickering lamps, dry running prevetor cum no voltage release, M S panel board to mount KSEBMeter, control switches, starter etc. completely wired, then conveying and erecting the motorpumpset and panel board and giving all connections, earthing etc. as per KSEB/E I rules andregulations. Trial run should be given for 7days. Any documentation required for proper electricconnection shall be arranged by the contractor at their own costMaterial |