Housing Urban and Rular Development Government Departments Closing in 0 days TDR #48403425

Tender For Improvement Of District Head Quarters Township Roads Under Bomdila (Cmcsrdp-Ii)

Issued by Government Departments · bomdila, Arunachal Pradesh
Tender Value
27.72 Crore
Estimated cost
Bid Submission
07 Apr 2025
0 days left
EMD
27.72 Lakhs
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bomdila → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Improvement Of District Head Quarters Township Roads Under Bomdila (Cmcsrdp-Ii)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 24-Mar-2025 Corrigendum Other 07-Apr-2025

BOQ

Name of Work: Improvement of District Head Quarters Township Roads under Bomdila (CMCSRDP-II)
Sl. No. Item Description
1Dismantling of Structures
2Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Lime /Cement Concrete By Manual Means Cement Concrete Grade M-15 & M-20
3Dismantling of Flexible Pavements
4Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separatelyBy Manual MeansBituminous courses
5Dismantling of Cement Concrete Pavement
6Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
7(SSH:- Formation Cutting )
8Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
9Excavation in Hard Rock (blasting prohibited)
10Excavation for roadway in hard rock (blasting prohibited)with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. A. Mechanised
11Haulage of materials by tipper exluding the cost of loading and unloading on hill roads[ lead = 7.50 Km]
12(SSH:- Widening )
13Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
14Excavation in Hard Rock (blasting prohibited)Excavation for roadway in hard rock (blasting prohibited)with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. A. Mechanised
15Haulage of materials by tipper exluding the cost of loading and unloading on hill roads[ lead = 7.50 Km]
16(SSH: Non Bituminous Course)
17Preparation of sub gradePreparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
18GranularSub-BasewithCoarseGraded Material (Table:- 400- 2)Constructionofgranularsub-basebyproviding coarsegraded material,spreading inuniform layerswithmotorgraderonpreparedsurface, mixing bymixin placemethod withrotavatorat OMC,andcompactingwithvibratoryrollerto achievethedesireddensity,completeasper clause 401.For grading-I
19GranularSub-BasewithCoarseGraded Material (Table:- 400- 2)Constructionofgranularsub-basebyproviding coarsegraded material,spreading inuniform layerswithmotorgraderonpreparedsurface, mixing bymixin placemethod withrotavatorat OMC,andcompactingwithvibratoryrollerto achievethedesireddensity,completeasper clause 401.For grading-II
20Wet Mix MacadamProviding, laying, spreading and compacting gradedstoneaggregatetowetmixmacadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
21(SSH: Bituminous Course)
22Prime Coat - Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
23Tack Coat - Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
24Dense Graded Bituminous Macadam : Bituminous Concrete (Providing and laying bituminous concrete with 100- 120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects).
25Bituminous Concrete : (Providing and laying bituminous concrete with 100- 120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects).
26(SSH: Earthen Shoulder)
27Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
28(SH :-Cross drain with cattle trap-13 No. )
29Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)A) Manual Means(i) Depth upto 3 m
30PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
31Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC grade M20
32Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. b)In Tees,Angles and Channels.
3315 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
34Neat cement punning.
35(SH:-V-Shaped RCC drain - 8.63km Length)
36Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
37II) Ordinary Rock (not requiring blasting)i) Depth upto 3 m (without de-watering)
38Plain/Reinforced Cement Concrete in OpenFoundationcompleteasper Drawing and Technical SpecificationsRCC Grade M25.Using Concrete Mixer. Height upto 5m
39Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
4015 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
41Neat cement punning.
42(SH:- RCC slab culvert 1.50 mtr. span - 4Nos.)
43Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material I) Ordinary soilA) Manual Meansi) Depth upto 3 m (without de-watering)
44II) Ordinary Rock (not requiring blasting)A) Manual Meansi) Depth upto 3 m (without de-watering)
45Dry rubble Flooring
46PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
47Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical SpecificationsRandom Rubble Masonry( coursed/uncoursed )
48Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20
49Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
50Plain/Reinforced Cement Concrete in OpenFoundationcompleteasper Drawing and Technical Specifications.RCC Grade M25Using Concrete Mixer. Height upto 5m
51Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
52Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification a)Granular material
53(SSH:- RCC Slab culvert3.00 mtr. span- 1 No.)
54Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material I) Ordinary soilA) Manual Meansi) Depth upto 3 m (without de-watering)
55Ordinary Rock (not requiring blasting A) ) Manual Means(i) Depth upto 3 m (without de-watering)
56Dry rubble Flooring
57PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
58Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical SpecificationsRandom Rubble Masonry( coursed/uncoursed )
59Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20
60Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
61Plain/Reinforced Cement Concrete in OpenFoundationcompleteasper Drawing and Technical Specifications.RCC Grade M25Using Concrete Mixer. Height upto 5m
62Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
63Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification a)Granular material
64(SH :- Protection Wall- 3.00m high )( Length = 170.00m)
65Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
66PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
67Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry
68Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A) Granular material
69Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
70(SH :- Protection Wall- 6.00m high )( Length = 320.00m)
71Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
72PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
73Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry
74Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification A) Granular material
75Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
76(SH:-RCC Retaining Wall of Height 6.00mt & legth=130.00m) )
77Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Ordinary soilA) Manual Meansi) Depth upto 3 m (without de-watering)
78Ordinary Rock (not requiring blasting)A) Manual Meansi) Depth upto 3 m (without de-watering)
79Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
80Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.PCC Grade M20
81Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical SpecificationsRCC Grade M25Using Concrete Mixer. Height upto 5m
82Plain/Reinforced Cement Concrete in OpenFoundationcompleteasper Drawing and Technical Specifications.RCC Grade M25Using Concrete Mixer. Height5.00m to 10.00m
83Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/ TMT Steel
84Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification Granular material
85Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical

AI Tender Summary

OUR REF NO 48403425
AUTHORITY Government Departments
TENDER VALUE 27.72 Crore
LAST DATE 07-04-2025
Authority
Authority Name Public Works Department
Work Description Improvement Of District Head Quarters Township Roads Under Bomdila (Cmcsrdp-Ii)
Basic Detail
Tender No BDL/TA-32/BSD-09/2024-25/261 Dated 21/03/2025
Bidding Type Tender
Location
City bomdila
State Arunachal Pradesh
Key Dates
Publish Date 24 Mar 2025
Submission Date 07 Apr 2025
Open Date 01 Jan 0001
Finance
Tender Value 27.72 Crore
Tender Fee 5000
EMD 27.72 Lakhs
Exemption Not Available
Document List
fd96c771-d053-41db-b1a4-df0652ff85b0.html
BOQ_2589.xls
TenderDoc.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 24, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 07, 2025
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Completed
Apr 07, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed

Tender Documents

Download All (ZIP) ↓
html

fd96c771-d053-41db-b1a4-df0652ff85b0.html

xls

BOQ_2589.xls

pdf

TenderDoc.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders