| 1 | 33 KV Line items |
| 2 | Cross bracing angle clamp |
| 3 | X-arm holding clamp with bolts & nuts |
| 4 | channel bracket for STP pole |
| 5 | F-bracket |
| 6 | Barbed Wire |
| 7 | Danger board with clamps for 33 KV |
| 8 | Bolts, nuts & washers |
| 9 | Alluminium paint |
| 10 | Red oxide paint |
| 11 | Stay clamp |
| 12 | SS Items |
| 13 | 6\" Dia GI pipe3 mtr. for 33 Kv cable protection |
| 14 | 24 Volt(12+12 volts) battery & Invertorwith cabinet for control systems. |
| 15 | Copper Control Cable 4x2.5 mm² |
| 16 | Copper Control Cable 2x2.5 mm² |
| 17 | Transformer oil drum |
| 18 | Substation Works |
| 19 | Cartage charges complete materials of line,metering and substation. |
| 20 | Dismantalling of old switchyard structures and cc work etc. |
| 21 | Erection/grouting/Plinthing/mounting /installation/fittinng/connection of all items as requiredto complete the work with small items and works. |
| 22 | Main Bus Bar complete with structure(A-type steel structure) |
| 23 | 33 KV Line Isolator 400 Amp. |
| 24 | 33 KV Bus Isolator 400 Amp. |
| 25 | Structure for above |
| 26 | 33 KV Post Insulator |
| 27 | Structure for above |
| 28 | 33 KV Lightening Arresters |
| 29 | Structure for above |
| 30 | P.T. 33 KV 1 Ph/110 V |
| 31 | Structure for above |
| 32 | 33 KVSingle T/F Control Pannel |
| 33 | 33 KVdouble T/F Control Pannel |
| 34 | 33kv CT 200/100/1A |
| 35 | 33 kv vcb with structure |
| 36 | 33 kv ct structure |
| 37 | 11 KV Incoming VCB 600/300/5A 300 MVA |
| 38 | 11 KV Outgoing VCB 200/100/5A 350 MVA |
| 39 | 11 KV Bus Coupler |
| 40 | 33kv Complete fuse set |
| 41 | 100 KVA 11/.4 KV T/F |
| 42 | Bus bar jumering including all equipments |
| 43 | 24 Volt battery(2*12 volts) & Invertor / charger with cabinet for control systems. |
| 44 | Laying of Copper Control Cable 4x2.5 mm² and 2*2.5mmsq. |
| 45 | Making interconnection drawing and connection with all protective,meteriing relays/equipments /control systems complete work. |
| 46 | Cable stand of MS Channel for 33 KV for Cable stand and neutral stand and grouting,errectionm,plinthing in switchyard with (3200 mm two length jointed with 4 no.intermediatechannel with clamp ) and also cable stand for 33kv incoming cable to switchyard from PPMC room. |
| 47 | Fabrication & fixing of cable flatform/cable rest/cable tray for safely keeping standby cables in pump house and 33/11kv control room. |
| 48 | Jointing charges off 11 kv C/J Kit |
| 49 | Plinth & Foundation of VCB |
| 50 | Dismantelling of old TF from plinth and keeping it at suitable place. |
| 51 | Dismantalling or repair of old transformer plinth as per site conditions. |
| 52 | Plinth of foundationfor power T/F as quired. |
| 53 | Shifting/installation of 3MVA Tf on plinth complete work required as per req site condition. |
| 54 | Digging/laying out old cables and dismantalling of old damage cable trench or complete work req. |
| 55 | construction of permanent trench base and cc wall in hanger side and brick wall 9inch in other side with cc cover of suitable sizes of 1mtr depth 90cm width with installation of 4 no. parallel cable hangers made of ms angleat 1 mtr width in run as per requirement including material, size of trench may vary as per site req.(from control to pump house) and from Power TF to Control room. |
| 56 | Laying of 11 KV Cable Double ckt , LT cable D/C from both TF to incoming panel and outgoing panels to pump house 1 and 2. with sand filling and cable tags,suitable size lugs etc complete supply & work as per req. |
| 57 | 11 KV Cable boxes coupling with switch gear and T/F |
| 58 | Earthing of S/S Outdoor equipement (Fabrication Full switchyard Earthmat) by cutting of CC work complete supply & work. |
| 59 | Earthing of complete Indoor/outdoor equipement with 25mmMS flat including painting complete supply&work. |
| 60 | Power Transformer Delta neutral Earthing/ Body Earthing with providing neutal support(with gi pipe 1.5inch inch 40ft mtr length/upto water level. Using copper cone and 6 mmsq. Copper wire) complete supply & work. |
| 61 | LT transformer Earthing with 20ft gi pipe neutral and body complete supply & work.. |
| 62 | Switchyard(1*22mtr span) Extension including earth filling all required for Switchyard and CR room. |
| 63 | Fencing of extended switchyard with ms flat 40x4 mm with cross welding 6 feet height at regular space including grouting with ms channel at regular space including 9 inch brick wall with RCC pillars 0.5mtr below ground level and 0.5mtr above ground levelincluding supply & work. |
| 64 | Repairingof old switchyard fencing complete with ms flats and strips etc |
| 65 | painting of old and new switchyard fencing complete complete supply & work.. |
| 66 | Outdoor Switchyard approach road, lightening as per req.with 70w led light 16 sets including LT 4*16 mmsq. cable or 4*25 mmsq all.cable as per requirement including supply of 4 no. branded blowers and its power wiring , sockets,switches,mcb`s etc. and also supply and exhaust arrangement 4 no. in control room with control room lighting arrangement and wiring ,supply and installation of fans etc and 1no. branded cooler arrangement complete supply & work. |
| 67 | Plinth of foundation for LT 100 KVA T/F in switchyard including cable stand with supply and installation of 11kv bakelite fuse system and partition wall between both TF. |
| 68 | Painting of S/S structures & equipements(Primer paint and allumunium paint)complete. |
| 69 | Rubber Mat |
| 70 | Sub-station Name & Arrow shine Board complete(1.5*1.5 mtr. Iron sheet with stand) |
| 71 | Furniture of S/S (8 chair, 2 table(1 executuve office table and one 4*5 feet wooden table with racks), 1 bench, 2 stool),2 office chair(1 executive chair),2 chowki. |
| 72 | writing name on S/S building and all 11 KV switchgear pannels |
| 73 | T & P of S/S & switchgears (as per specifications),pliers 4 no, wrench 1 set whole, hammer 2 no, 2 no Saw, 2 no. Axe, 2 no. long rope and small rope, 2 no. earth chain, 3 no. bamboo ladder,tongue tester, multimeter,leather bag,33&11 kv hand gloves 6each, Ladder trolley,safety belt, pulley, meggar 5 kv ,Expandable Discharge earth Rod for Earthing all as per requirement. |
| 74 | 4.5 Kg. CO₂ fire extinguisher portable type |
| 75 | 5 Kg. dry powder fire extinguisherportable type |
| 76 | Fire buckets with stand filled with dry sand as req. |
| 77 | Max./Min. line diagram keyboard, hand gloves, earthing chain etc. |
| 78 | Digging of Kaccha/Pakka Road for completion or work and also refilling complete work as req. |
| 79 | Other miscellenius items & works required to complete the work. |
| 80 | Flooring of switchyard complete with CC work with 4 inch base with bricks and sand ,cement with 3 inch cc flooring complete supply & work. |
| 81 | Labour charges for dismentalling of old xlpe cable from same route of new cable |
| 82 | Fabrication/supply of highmast arrangement structure with STP pole/highmast includingfitting of LED lights at top including all materials and also installation of LED lights with control circuit,power wires and power switches, mcb`s.The work includes pole erection , grouting, painting, plinthing etc complete work and also making climbing arrangements. |
| 83 | Centrifusing and gasket change of Power Transformer as per requirement complete Work including Material,T&P and labour as req. |
| 84 | Installtion of capacitor bank with complete material supply ,work and labour,etc. as req.as per anx. |
| 85 | Testing of S/S complete supply & work(including cleaning of site/old material management/disposing off all items at suitable place). |
| 86 | Metering Work |
| 87 | Fabrication of Structure for mounting CT/PT unitwith materialwith grouting ,earthing complete work. |
| 88 | construction of permanent trench with cover. From CT/PT to PPMC and PPMC to Terminal Gantry including cost of sand & brick with complete supply & work. |
| 89 | Laying of 33 KV Cable Double ckt from CT/PT to PPMC and PPMC to Terminal Gantry including cost of sand. |
| 90 | Jointing charges for 33 kv jointing kit |
| 91 | Construction of 3x3 mtr PPMC room with gate adjusent to control room as per requirement including trench , 15 mtr wide/as req. with interlocking approach road from main road and flooring,lighting arrangement,power wiring and giving connection from control room,power sockets including supply of 2no. branded blower and power switches,mcb`s complete supply & work. |
| 92 | 6\" Dia GI pipe3 mtr. for 33 Kv cable protection complete supply & work. |
| 93 | Other small materials and jobs to complete supply & work. |
| 94 | Mounting & Fitting of following equipment on erected structure |
| 95 | CT/PT |
| 96 | 33 KV TVM |
| 97 | Earthing outdoor and indoor equipment withMS strip 25mm |
| 98 | Installation of 33 KV Pilfer Proof resistant M/C in PPMC room. |
| 99 | Line work |
| 100 | Erection of pole including all works. |
| 101 | Straightning of tilted poles with grouting including all complete supply & work. |
| 102 | Fixing of stay complete with work |
| 103 | Tightening of loose Spans including all work |
| 104 | Rewinding of jumpering / winding of pin insulator/ disc insutor of tightening of loose conductor. |
| 105 | Openeningof existing damaged X Arm and f bracket |
| 106 | All other small items and work req to complete the work. |
| 107 | Drawing,design, approval and Electrical NOC charges complete work. |