| 1 | Cartage of PCC Polefrom ESC to Work side |
| 2 | Cartage of L.T PVC Cable & other Associated Material |
| 3 | Cartage of 25, 63 and 100 KVA Different T/F |
| 4 | Cartage and Loading Unloading of 250 KVA & 400 KVA Medium Power T/F |
| 5 | Errection of PCC & ST Pole For New Line |
| 6 | Errection of D/PPole to Mount 25 KVA T/F |
| 7 | Connecting of LT PVC Cable with Alluminium Lug |
| 8 | Grouting of PCC Pole as per standard |
| 9 | Earthing of Pole as per standared |
| 10 | Concreting of Stay |
| 11 | Mounted of 25, 63 and 100 KVA T/F on errected D/P |
| 12 | Dismental and Receive Back 10, 16, 25 and 63 KVA T/F due to capacity enhanced from side to Store Center JNP |
| 13 | Dismental and Receive Back 100 KVA T/F from site to Store Center JNP |
| 14 | Dismental and Receive Back 250 KVA & 400 KVA T/F from site to Store Center JNP |
| 15 | Mounted of 250 and 400 KVA T/F on Constructed Plinth |
| 16 | Construction of Chemical Earthing with Material for 250 KVA & 400 KVA T/F |
| 17 | Construction ofPlinth For 250 KVA & 400 KVA T/F |
| 18 | Fencing of 250 KVA & 400 KVA T/F on Side |
| 19 | Shifting charge of existing T/F from old plinth to other place & remounting of T/F after completion of T/F plinth |
| 20 | Supply of Trolley with gate arrangement & fencing for 400 KVA T/F |
| 21 | Installation of T/F on New Mobile Trolley with LT Bus bar & Fuse Set |
| 22 | Cartrage of VCB Switch gear Pannel from store to site |
| 23 | Installation of VCB, connection with HT XLPE Cable & Wiring |
| 24 | Copper Z-Piece 62x225x12 MM |
| 25 | T- OFF CLAMP FOR 8.5 MPCC POLE |
| 26 | HT CLAMP FOR DOUBLE POLE |
| 27 | MS BOLT & NUT (WITH 1-WASHER)1.25\"X3/8\"Ø |
| 28 | Alluminium Lug Different Size |
| 29 | Stone Pad |
| 30 | STAY CLAMP 8.5M PCC POLE |
| 31 | T/f Trolley with Stand |
| 32 | 12 VOLT-BATTERY 220 AH (Luminous Make) |
| 33 | BATTERY INVERTER 24V 2500 VA Inverter (Luminous Make) |