| 1 | Construction of Embankment with approved material obtained form borrow pits with all lifts and leads, transporting 5.00 km upto site, spreading, grading torequired slope and compecting to meet requirement of table 300-2.andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 2 | Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 3 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 4 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density with bitumenus emulssion SS. 3.5% and OPC Cement @1% by wet of mix andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 5 | Providing and laying dense graded bituminous macadamgrade-1 with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG-40 @4.0 per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 6 | Providing & applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 7 | Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 8 | Construction of cement concrete kerb with top and bottom width 115 and 165 mm respectively, 250 mm high in M 20 grade PCC on M-10 grade foundation 150 mm thick, foundation having 50 mm projection beyond kerb stone, kerb stone laid with kerb laying machine, foundation concrete laid manually, all complete as per clause 409 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 9 | Planting and Maintaining of Flowering Plants and Shrubs in central verge Specification 11.8. 307 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 10 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 11 | Plain Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (M-15) Morth Spe. 1500, 1700 & 2100-12.8 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 12 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M20) Morth Spec. 1500, 1700 & 2100 12.8 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 13 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M25) Morth Spec. 1500, 1700 & 2100 12.8 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 14 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specificationsandincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 15 | Providing and laying Cement concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and as per Technical Specifications No. 2702 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 16 | Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specificatoinandincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 17 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing face. Complete as per drawing and Technical Specifications andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 18 | Painting first coat over priming coat (including cost of priming coat & wall Putty) on wood or steel and other metal surface with superior synthetic enamel paint of standared make brushing to give an even shade and finished and including cleaning the surface all dirt dust and other foreign matter sand paparing and stripping including cost matter and scoured with wire brushes fine steel/ wood scrappers sand papering and knotting including coat ofallandincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. SI No chp 15 New Item 1 a+2+12 |
| 19 | Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5m and lead upto 50m as per technical specitication clause 302.3andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 20 | Plain cement concrete with 4cm guage stone ballast and fine sand of 1.25 F.M and cement in proportion of 1:4:8 in foundation and under floorsandincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. SI No- 281 |
| 21 | Laying and compacting dry O.B.B. 40mm. Gauge in foundation in layers of not more than 15cm. Thickness including local sand, in ratio 2:1andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 22 | M-150 brick work in 1:3 cement and coarse sand mortar in foundation and plinthandincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. for proper complection of the work. (SI No - 307-309) |
| 23 | Supply and laying 1000 mm dia NP-3 Hume pipe SI No- Chp 1 new item (1) and Chp 18 Item no 1(5) andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 24 | Supply and laying 600 mm dia NP-3 Hume pipe SI No- Chp 1 new item (1) and Chp 18 Item no 1(5) andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 25 | Supply and laying 350 mm dia NP-3 Hume pipe SI No- Chp 1 new item (1) and Chp 18 Item no 1(5) andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |
| 26 | Struck pointing with cement mortar consisting of 1 part cement and 2 part of the fine sand of 1.25 finenes modulus on brick work andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. Si No 574 |
| 27 | Providing concrete for plain/reinforced concrete (1:2:4) in open foundations complete as per drawings and technical specification Clause 802,803,1202&1203 andincluding all material, labour, labour cess, T&P royalty, all tasex etc. complete as per diretcion by i-in-c but excluding G.S.T. |