| 1 | Earth work in Excavation in soil for laying of pipe line to give 1 mtr cover propper completeion of work |
| 2 | Supply of PVC Pipe ISI Mark 6kg/cm2 of following dia ( kisan,supreme appolo,trupati etc make.including supply of all material,labour and T&P etc.required for proper completion of work |
| 3 | 90mm dia |
| 4 | PVC Secials 5% of Above Items |
| 5 | Carting,laying & jointing of PVC pipesi/c supply of all material,labour and T&P etc.including all complete of work |
| 6 | 90mm dia |
| 7 | Making Tee connection i/c supply of all material,labour and T&P etc. |
| 8 | Inter connection to new pipe line to existing pipe linei/c supply of all material,labour and T&P etc |
| 9 | Crossing of small drain & culvert 1 to 2 mtr width for laying pipe linesi/c supply of all material,labour and T&P etc. |
| 10 | Dismantling of old and damage nterlocking Tiles including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-20/new4) |
| 11 | Disposal of dismantling material up to 5km lead inc loading/unloading including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-3/231a) |
| 12 | Dismantling of old and damage drain brick work including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-17/692) |
| 13 | Deduction of old and workable brick 40% of above items including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-1/1a) |
| 14 | Deduction of brick bats in 5.00cm gauge 60% of item no-3 including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-1/2a) |
| 15 | Earth work in filling upto 5km distance including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) |
| 16 | Cement concrete in 1:6:12 with brick ballast including supply of all material,labour and T&P etc.required for proper completion of work,Chpt-5/273 |
| 17 | M-150 brick work in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-6/307) |
| 18 | 12mm thick Plaster in 1:3 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-13/582a) |
| 19 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labourand T&P etc required for proper completion of work (Chpt-5/279a) |
| 20 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work |
| 21 | Cement concrete with 2cm gauge approved stone grit,coarse sand and cement in proporation of 1:1.5:3 in pavement for c.c road coarse and fine aggregate cinfirming to IS standard mixed in concrete mixture laying and fixing of 125 micron thick polytheen film,wedges ,steel plates including supply of all material,labourand T&P etc required for proper completion of work (Chpt-20,New9 |
| 22 | R.C.C work in 1:1.5:3 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labourand T&P etc required for proper completion of work (Chpt-5/284a) |
| 23 | Supply and fixing of Iron work such as reinforced steel including supply of all material,labour and T&P etc.required for proper completion of work,(As per Analysis) |
| 24 | Add sign board of granite stone |
| 25 | GST |