| 1 | PART-A Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation |
| 3 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level, and filling joints with powered or local sand. |
| 4 | (I) Cement Concrete with graded stone ballast (40 mm size excluding shuttering) In ground Floor. (A) Pakur Variety. (a) 1:3:6 Porportion |
| 5 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade. Pakur Variety |
| 6 | Brick work with 1st class bricks in cement morter (1:6). (b) In Super structure and Ground Floor |
| 7 | Projection of individual brick 12.5 cm x 7.5 cm x 6.5 cm to 12.5 cm projection from wall surface. (The rate covers the projection only, the embedded portion being including in the measurement of the wall against appropriate item) |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement morter including rounding off or chamfering corners as directed and raking out joints or roughening of concrete surface by chamfering etc. including throating, nosing and drip course, scaffolding/stagging where necessary. Ground Floor.( Excluding cost of chipping over concrete surface)(i) With 1: 6 cement mortar b) 20mm thick plaster |
| 9 | (i) With 1: 6 cement mortar c) 15 mm thick plaster |
| 10 | Reinforcement for reinforced concrete work in all sorts structure including distribution bars, stirrups, binders etc. including of rods initial straightening and removal of loose rust (if necessary), cutting to requisite length , hooking and bending with 16 gauge black annealed wire at every inter section, complete as per drawing and directio. TATA / SAIL/RINL |
| 11 | Hire and labour charges for shuttering with centreing and necessary staging up to 4m using approved stout props thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, linteles curved or straight including fitting, fixing and striking out after complition of works.(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 12 | Precast pierced concrete jally work as per design and manufacturer\"s specification including moulding etc. with stone chips and necessary reinforcement shuttering complete including fitting, fixing in position in all floors. (a) 50 mm. thick panels |
| 13 | Applying Exterior grade Acrylic primer of approved quality and brand on plastered or cencrete surface old or new surface to receive decorative textured (matt finish) or smooth finish acrylic exterior emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer\"s specification and as per direction of theEIC (a) One Coat |
| 14 | Protective and Decorative Textured exterior high class matt finish paint of approved quality, composed of special Tharmoplastic Resin containing fine crystalline additives derive from Granite as per manufacturer\"s specification and as per direction of EIC to be applied over acrylic primer as required. The rate includes cost of material, labour, scaffolding and all incidental charges but excluding the cost of primer. In Ground floor. Two coat. |
| 15 | Part-B Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. |
| 16 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation |
| 17 | Single brick flat soling of picked jhama bricks including ramming and dressing bed to proper level, and filling joints with powered or local sand. |
| 18 | (I) Cement Concrete with graded stone ballast (40 mm size excluding shuttering) In ground Floor. (A) Pakur Variety. (a) 1:3:6 Porportion |
| 19 | Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 300 Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation.[using concrete mixture] M 25 Grade. Pakur Variety |
| 20 | Brick work with 1st class bricks in cement morter (1:6). (b) In Super structure and Ground Floor |
| 21 | Reinforcement for reinforced concrete work in all sorts structure including distribution bars, stirrups, binders etc. including of rods initial straightening and removal of loose rust (if necessary), cutting to requisite length , hooking and bending with 16 gauge black annealed wire at every inter section, complete as per drawing and directio. TATA / SAIL/RINL |
| 22 | Hire and labour charges for shuttering with centreing and necessary staging up to 4m using approved stout props thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, linteles curved or straight including fitting, fixing and striking out after complition of works.(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work |
| 23 | Supplying, fitting & fixing 1st quality Ceramic tiles in walls and floors to match with the existing work & 4 nos. of key stones (10mm) fixed with araldite at the back of each tile & finishing the joints with white cement mixed with colouring oxide if required to match the colour of tiles including roughening of concrete surface, if. (B) Wall With Sand Cement Mortar (1:3) 15 mm thick & 2 mm thick cement slurry at back side of tiles using cement @ 2.91 Kg/Sq.m & joint filling using white cement slurry @0.20kg/Sq.m. (a) Area of each tile upto 0.09 Sq.m. (i) Coloured decorative |
| 24 | M.S. gate of Jail type as per approved design made of strong M.S. frame work, intermediate stiffeners and round / square bars or angles. M.S. sheet (not less than 14 gauge) gussets, cleats etc. including necessary riveting, bolting, welding, locking and hanging arrangements, fitting and fixing complete as per direction of the Engineer-in -charge. In ground floor. |
| 25 | Supplying, fitting, fixing in position rails on any surface. |
| 26 | (a) Priming one coat on steel or other metal surface with synthetic oil bound primer of approved quality including smoothening surfaces by sand papering etc. |
| 27 | (A) Painting with best quality synthetic enamel paint of approved make and brand including smoothening surface by sand papering etc. including using of approved putty etc. on the surface, if necessary. (b) On steel or other metal surface : With super gloss (hi-gloss) - (iv) two coat (with any shade except white) |
| 28 | Sub Total |
| 29 | GST 18% |
| 30 | CESS 1% |