Educational and Research Institute Boards / Undertakings / PSU Closing in 0 days TDR #48378452

Tender For Sitc Of Batteries For 150Kva And 40Kva Delta Make Ups At Iucaa, Ganeshkhind, Pune And Sitara Sppu, Pune

Issued by Boards / Undertakings / PSU · pune, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Apr 2025
0 days left
EMD
41000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
pune → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Sitc Of Batteries For 150Kva And 40Kva Delta Make Ups At Iucaa, Ganeshkhind, Pune And Sitara Sppu, Pune , Cat (A) -Items To Be Supply And Installation , Supply, Installation, Testing & Commissioning Of 12 Volt, 160Ah,Factory Charged Smf Vrla Batteries Including All Required Connectors/ Fastners For Interlinks, Battery Tags, Seperators, Terminal Covers Etc. Complete As Instructed By The Incharge Person. , Supply, Installation, Testing & Commissioning Of 12 Volt, 65Ah,Smf Vrla Batteries Including All Required Connectors/ Fastners For Interlinks, Battery Tags, Seperators,Terminal Covers Etc. Complete As Instructed By The Incharge Person. , Earthing Stystem: Supply, Installation, Testing And Commissioning Of Eco Safe & Electrical Maintenance Free Earth Electrode Of 40 Mm Dia. Having At-Least 250 Micron Copper Plating, 3 Meter Longmolecularly Bonded With 99.9% Pure Electrolytic Grade Copper, ‘U’ Bolt Clamp With All Fastners Etc.Earth Enhancing Compound To Reduce The Soil Resistivity As Per Iec 62561-7. It Should Be Highly Conductive Earthing Backfill Compound Terec + 5 Kg And Earthcon/Erec 50 Kg (Or As Per Actual Requirement), Capable Of Reducing Soil Resistivity For Electrical Requirements, Maintains Constant Volume Regardless Of Moisture Content, Not Diffuse In To The Ground, Not Expand Or Experience Any Shrinkage But Remain In Constant Contact With Earth & Should Be Able To Reduce Contact Resistance To Earth Significantly & Create A Low Steady State Impedance For A Very Long Period Resulting In Faster Transient Dissipation. Confirm With The Requirements Of Ul467-2007. , Supply, Installation, Testing And Commissioning Of 25 X 6 Mm Of Copper Strip/ Wire Completely Pvc Insulated Clamped To Walls, Cables In Recess Or Surface, Underground Minimum Depth Of 1.5Ft Etc. For Equipment/ System Earthing Complete As Required Including Inter Connection Between Length At Joints, All Fixing Accessories Saddles, Clamps Etc And Other Fixing Hardware Material As Required For Proper Installation. (Required Core Cutting Through The Walls Inclusive) , Perform Quarterly Testing, Measurements, And Record-Keeping Of 160Ah*80N & 65Ah*29N Batteries Voltages And Charging Currents Under Both No-Load And Load Conditions And Load Tests To Ensure The Health And Reliability Of The Cells/Batteries. Submit Detailed Test Reports To Iucaa For Review. This Service Will Be Provided For A Duration Of 36 Months From The Date Of Battery Installation. The Engineer Performing The Work Must Be Qualified To Test 1000V Dc Power Battery Strings, Equipped With Appropriate Personal Protective Equipment (Ppe), And Carry All Necessary Measuring Instruments Required For The Tests. , Cat (B) - Buy Back Items , Buyback Of Old 12 Volt, 160Ah, Amaron Quanta Make Smf Vrla Batteries (Including Dismantling, Removing/Handling, Transport, Cleanning The Space, Etc.) (Batteirs Purchas By 2021) , Buyback Of Old 12 Volt, 65Ah, Amaron Quanta Make Smf Vrla Batteries (Including Dismantling, Removing/Handling, Transport, Cleanning The Space, Etc) (Batteirs Purchas By 2020)

BOQ

Name of Work:SITC of Batteries for 150KVA & 40KVA Delta make UPS at IUCAA, Ganeshkhind, Pune & SITARA SPPU, Pune
Sl. No. Item Description
1Cat (A) -Items to be supply and installation
2Supply, Installation, Testing & Commissioning of 12 Volt, 160Ah,Factory charged SMF VRLA Batteries including all required connectors/ fastners for interlinks, battery tags, seperators, terminal covers etc. complete as instructed by the Incharge person.
3Supply, Installation, Testing & Commissioning of 12 Volt, 65Ah,SMF VRLA Batteries including all required connectors/ fastners for interlinks, battery tags, seperators,terminal covers etc. complete as instructed by the Incharge person.
4Earthing Stystem: Supply, Installation, Testing and Commissioning of eco safe & electrical maintenance free Earth electrode of 40 mm dia. having at-least 250 micron copper plating, 3 meter longmolecularly Bonded with 99.9% pure electrolytic grade Copper, ‘U’ bolt clamp with all fastners etc.earth enhancing compound to reduce the soil resistivity as per IEC 62561-7. It should be highly conductive earthing backfill compound terec + 5 Kg and earthcon/erec 50 Kg (or as per actual requirement), capable of reducing soil resistivity for electrical requirements, maintains constant volume regardless of moisture content, not diffuse in to the ground, not expand or experience any shrinkage but remain in constant contact with earth & should be able to reduce contact resistance to earth significantly & create a low steady state impedance for a very long period resulting in faster transient dissipation. Confirm with the requirements of UL467-2007.
5Supply, installation, testing and commissioning of 25 x 6 mm of Copper strip/ wire completely PVC insulated clamped to walls, cables in recess or surface, underground minimum depth of 1.5ft etc. for equipment/ System earthing complete as required including inter connection between length at joints, all fixing accessories saddles, clamps etc and other fixing hardware material as required for proper installation. (required core cutting through the walls inclusive)
6Perform quarterly testing, measurements, and record-keeping of 160Ah*80N & 65Ah*29N batteries voltages and charging currents under both no-load and load conditions and load tests to ensure the health and reliability of the cells/batteries. Submit detailed test reports to IUCAA for review. This service will be provided for a duration of 36 months from the date of battery installation.The engineer performing the work must be qualified to test 1000V DC power battery strings, equipped with appropriate personal protective equipment (PPE), and carry all necessary measuring instruments required for the tests.
7Cat (B) - Buy Back Items
8Buyback of Old 12 Volt, 160Ah, Amaron Quanta make SMF VRLA Batteries (including Dismantling, removing/handling, transport, cleanning the space, etc.) (Batteirs purchas by 2021)
9Buyback of Old 12 Volt, 65Ah, Amaron Quanta make SMF VRLA Batteries (including Dismantling, removing/handling, transport, cleanning the space, etc) (Batteirs purchas by 2020)

AI Tender Summary

OUR REF NO 48378452
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 11-04-2025
Authority
Authority Name Inter-University Centre For Astronomy And Astrophysics
Work Description Sitc Of Batteries For 150Kva And 40Kva Delta Make Ups At Iucaa, Ganeshkhind, Pune And Sitara Sppu, Pune , Cat (A) -Items To Be Supply And Installation , Supply, Installation, Testing & Commissioning Of 12 Volt, 160Ah,Factory Charged Smf Vrla Batteries Including All Required Connectors/ Fastners For Interlinks, Battery Tags, Seperators, Terminal Covers Etc. Complete As Instructed By The Incharge Person. , Supply, Installation, Testing & Commissioning Of 12 Volt, 65Ah,Smf Vrla Batteries Including All Required Connectors/ Fastners For Interlinks, Battery Tags, Seperators,Terminal Covers Etc. Complete As Instructed By The Incharge Person. , Earthing Stystem: Supply, Installation, Testing And Commissioning Of Eco Safe & Electrical Maintenance Free Earth Electrode Of 40 Mm Dia. Having At-Least 250 Micron Copper Plating, 3 Meter Longmolecularly Bonded With 99.9% Pure Electrolytic Grade Copper, ‘U’ Bolt Clamp With All Fastners Etc.Earth Enhancing Compound To Reduce The Soil Resistivity As Per Iec 62561-7. It Should Be Highly Conductive Earthing Backfill Compound Terec + 5 Kg And Earthcon/Erec 50 Kg (Or As Per Actual Requirement), Capable Of Reducing Soil Resistivity For Electrical Requirements, Maintains Constant Volume Regardless Of Moisture Content, Not Diffuse In To The Ground, Not Expand Or Experience Any Shrinkage But Remain In Constant Contact With Earth & Should Be Able To Reduce Contact Resistance To Earth Significantly & Create A Low Steady State Impedance For A Very Long Period Resulting In Faster Transient Dissipation. Confirm With The Requirements Of Ul467-2007. , Supply, Installation, Testing And Commissioning Of 25 X 6 Mm Of Copper Strip/ Wire Completely Pvc Insulated Clamped To Walls, Cables In Recess Or Surface, Underground Minimum Depth Of 1.5Ft Etc. For Equipment/ System Earthing Complete As Required Including Inter Connection Between Length At Joints, All Fixing Accessories Saddles, Clamps Etc And Other Fixing Hardware Material As Required For Proper Installation. (Required Core Cutting Through The Walls Inclusive) , Perform Quarterly Testing, Measurements, And Record-Keeping Of 160Ah*80N & 65Ah*29N Batteries Voltages And Charging Currents Under Both No-Load And Load Conditions And Load Tests To Ensure The Health And Reliability Of The Cells/Batteries. Submit Detailed Test Reports To Iucaa For Review. This Service Will Be Provided For A Duration Of 36 Months From The Date Of Battery Installation. The Engineer Performing The Work Must Be Qualified To Test 1000V Dc Power Battery Strings, Equipped With Appropriate Personal Protective Equipment (Ppe), And Carry All Necessary Measuring Instruments Required For The Tests. , Cat (B) - Buy Back Items , Buyback Of Old 12 Volt, 160Ah, Amaron Quanta Make Smf Vrla Batteries (Including Dismantling, Removing/Handling, Transport, Cleanning The Space, Etc.) (Batteirs Purchas By 2021) , Buyback Of Old 12 Volt, 65Ah, Amaron Quanta Make Smf Vrla Batteries (Including Dismantling, Removing/Handling, Transport, Cleanning The Space, Etc) (Batteirs Purchas By 2020)
Basic Detail
Tender No M24-0714
Bidding Type Tender
Location
City pune
State Maharashtra
Key Dates
Publish Date 21 Mar 2025
Submission Date 11 Apr 2025
Open Date 12 Apr 2025
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 41000
Exemption Available
Document List
931bc399-cd8a-46be-b785-b5378d516bc6.html
BOQ_897890.xls
TechnicalBid.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 21, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Apr 11, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Apr 12, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

931bc399-cd8a-46be-b785-b5378d516bc6.html

xls

BOQ_897890.xls

pdf

TechnicalBid.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders