| 1 | Labour |
| 2 | Insertion of one LT PSC pole in existing Sph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
| 3 | Dismantling one section fuse |
| 4 | Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling existing 2 conductors, stringing 3 Rabbit & 1 Weasel incl. conveyance. |
| 5 | Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting allitems to the new pole. |
| 6 | Re-joining snapped one LT conductor after removing damaged portion incl.Reshackling and conveyanceof all materials complete. |
| 7 | Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole. |
| 8 | Providing Strut using LT PSC pole incl. digging & back filling pit. |
| 9 | Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc. |
| 10 | Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 11 | Renewal of existing damaged/old LT stay with new stay in place and refitting of all items and conveyance of all materials. |
| 12 | Renewal of existing damaged/broken old LT stay with existing stay rod. |
| 13 | Stringing of 1.1 kV Ariel bunched cable XLPE insulated of size 3 x 70(For Phase)+ 1 x 50 (insulated messenger nuetral) + 1X16 (street light) sqmm |
| 14 | Erection of Anchor clamp / dead end clamp for LT ABC of any size |
| 15 | Erection of suspension clamp for LT ABC of any size |
| 16 | Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 17 | Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 18 | Loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 19 | Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). |
| 20 | Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. |
| 21 | Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking. |
| 22 | Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 23 | Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls. |
| 24 | Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls. |
| 25 | Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same. |
| 26 | Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 27 | Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 28 | Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 29 | Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same. |
| 30 | Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking. |
| 31 | Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store. |
| 32 | Erecting one LT PSC Pole in position incl. digging & back filling pit. |
| 33 | Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 34 | Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit. |
| 35 | Providing Stay for LT poles incl. digging & back filling pit. |
| 36 | Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit. |
| 37 | Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 38 | Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 39 | Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials. |
| 40 | Fitting and erecting one HT A type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads. |
| 41 | Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). |
| 42 | Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc. |
| 43 | Providing WP support with PSC pole incl. digging & back filling pit. |
| 44 | Drilling hole of various sizes on existing Channel/Cross Arm. |
| 45 | Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole. |
| 46 | Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling. |
| 47 | Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 48 | Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits. |
| 49 | Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line. |
| 50 | Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 51 | Additional rate for excavation of one Pit for HT Pole/HTStay in Hard Laterite. |
| 52 | Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 53 | Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 54 | Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials. |
| 55 | Providing/Inserting 2 line spacer on the existing LT OH line. |
| 56 | Providing/Inserting 3 line spacer on the existing LT OH line. |
| 57 | Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion. |
| 58 | Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion. |
| 59 | Dismantling one ordinarystreet light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting. |