|
| 1 | Removing and Relaying theprecast slab for drain \" including pointing in cm1:3 mix , as per deparmental officer etc., Complete |
| 2 | Dismantling the existing damaged RCC slab as per deparmental officer etc., Complete |
| 3 | Desilting the Existing Drain as per the instruction ofdepartmental officer etc., complete |
| 4 | Dismantling the damaged Cement concrete as per the instruction of Departmental officers etc., Complete |
| 5 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. departmental officers etc complete |
| 6 | Conveying the excavated earth from the site to the distance of 15kms out side of the city limit including all initial lead, lift, loading and unloading with transportation charges etc complete as per the direction of departmental officers. |
| 7 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hardbroken granite stone jelly for foundationincluding dewatering if found necessary andlaid in layers of not more than 15 cm thickand compacted etc.,complete |
| 8 | Supplyingand erecting SHUTTTERING including necessary supports for plane surfaces such as Drain wallsetc, using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. |
| 9 | Cement concrete 1:3:6 (one cement, three sand and sixaggregate ) using 20mm hard brokengranite stone jelly for all CC items of workexcludingcentering, shuttering, and cost of reinforcement grill but including curing finishing etc.,complete fixtures in CC works wherever necessary as directedby departmental officer etc., complete. |
| 10 | PLASTERING with cement mortar 1:5(one cement and five sand by volume)12mm thick for all internal/external surfacescomplying with standard specifications. |
| 11 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification |
| 12 | Supply and manufacturing of RCC Precast Slab 75mm thick in CC 1:2:4 mix using 20mm broken jelly including water curing, moulding, charges etc., complete as per the direction of departmental officers |
| 13 | Paving theRCC Precast Slab 75mm thick and pontingin correct position including all charges etc complete |
| 14 | Add :- GST @ 18% |