|
| 1 | Operation & Security of 6 nos. X 10MWp Solar Project |
| 2 | Manpower Services for Operation & Maintenance of the plant |
| 3 | Manpower services for Security of the plant |
| 4 | Maintenance of CMCS Equipment |
| 5 | Maintenance of Battery Room at the MCR |
| 6 | Maintenance of UPS, UPS DB at the MCR |
| 7 | Maintenance of ACDB panel & Lighting, MCB Distribution box at the MCR |
| 8 | Maintenance of Fire fighting equipment & Alarm Panel at the plant |
| 9 | Maintenance of Battery System, FCBC Panel at the MCR |
| 10 | Maintenance of WMS & SCADA system |
| 11 | Maintenance of CCTV system at the MCR |
| 12 | Maintenance of Incomer Cum Outgoing Panels ( 33kv HT Switchgear) at MCR |
| 13 | Maintenance of Earth Pits at MCR,33KV yard arrays and entire DC system |
| 14 | Maintenance of Battery Bank and its load test (All Battery bank) at the MCR |
| 15 | Maintenance of Inverter Rooms |
| 16 | Maintenance of INVERTER |
| 17 | Maintenance of UPS , UPS DB at the LCR |
| 18 | Maintenance of Battery Charger/ Battery Room at the LCR |
| 19 | Maintenance of 33KV HT Circuit Breaker/Switchgear at the LCR and its 33KV yard |
| 20 | Maintenance of ACDB Panel & Lighting system (Whole Plant except MCR) |
| 21 | Maintenance of DCDB Panel at the MCR/LCR |
| 22 | Maintenance of RTU Panel ( PLC , SCADA PANEL) at LCR/MCR |
| 23 | Borewell and Module Washing System of whole Plant |
| 24 | Maintenance of Earth Pits (LCR/Inverter/IDT and its associated switch yard) |
| 25 | Complete maintenance of Inverter duty Transformers |
| 26 | Maintenance of Auxiliary Transformers |
| 27 | Maintenance of Contactor Box for Exhaust Fan Controller |
| 28 | Repair Maintenance of String Monitoring Unit/Box (SMB) |
| 29 | Checking of Lightening Arrester (DC side) and replacement if required |
| 30 | Repair maintenance of CCTV systems at the entire plant except MCR |
| 31 | Repair maintenance of MMS structure |
| 32 | Roads Grading & Erosion & Boundary Fencing at the whole plant |
| 33 | Maintenance of Battery Bank and its load test (All Battery bank) at the LCR |
| 34 | Maintenance of 33KV O/G Feeder |
| 35 | Monthly Cleaningand Maintenance of 33KV O/G Feeder (including jumper tightening etc) |
| 36 | Maintenance of all 42KV grade Lightening Arrester |
| 37 | Maintenance of 33KV Isolator |
| 38 | Maintenance of 33KV CT/PT |
| 39 | Checking of Earth Pits and making good of it iro 33KV feeders |
| 40 | ABT Meters reading |
| 41 | Providing & Making ofST joint of 33 KV Cable if required |
| 42 | Providing & Making ofEnd joint of 33 KV Cable if required |
| 43 | Additional support services |
| 44 | Grass Cutting for entire plant |
| 45 | Module Washing for entire plant |
| 46 | Yearly Inverter Transformer Testing at the 1st month of every year (JAN/FEB) |
| 47 | Oil testing of Inverter Duty Transformer (JAN/FEB) |
| 48 | Handover & takeover |
| 49 | Yearly Calibration of pyranometer at the 1st months of every years (JAN/FEB) |
| 50 | AMCs |
| 51 | AMC for Inverters |
| 52 | AMC for SCADA & communication |
| 53 | AMC for PowerTransformers & IDTs |
| 54 | Amount linked to safety |
| 55 | Following of all safety norms including safety drills |