Tender For Reapiring And Overhauling Of 3 Ph, 415 V, Ac Cooling Fans For Variouspower Transformers At Various 220/132 Kv Sub-Stations Under Etd, Bulandshahr. Against Tender No. 05/2024-25, Dueon & Open On 26.03.2025.
Tender Value
1.99 Lakhs
Estimated cost
Bid Submission
26 Mar 2025
0 days left
EMD
2000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
bulandshahr → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender For Reapiring And Overhauling Of 3 Ph, 415 V, Ac Cooling Fans For Variouspower Transformers At Various 220/132 Kv Sub-Stations Under Etd, Bulandshahr. Against Tender No. 05/2024-25, Dueon & Open On 26.03.2025.
BOQ
| Sl. No. | Item Description |
| 1 | REAPIRING AND OVERHAULING OF 3 PH, 415 V, AC COOLING FANS FOR VARIOUSPOWER TRANSFORMERS AT VARIOUS 220/132 KV SUB-STATIONS UNDER ETD, BULANDSHAHR |
| 2 | General maintenance/servicing of heavy-duty cooling fan of transformers having capacity 415V 50Hz 1400rpm, 240-watt, 610 mm sweep the scope of work includes safe disconnection of electrical wirings of fan, removing case guard of cooling fan, dismantling of fan motor from main structure from radiator, cleaning oiling greasing/lubrication of bearings, replacement of deflective bearing/bushes it required, replacement of worn-out contacts if required, proper alignment of rotor shaft & fan wheel, proper sealing, changing of connections leads etc. The work also includes rafting/reinstallation back on radiator structure, checking the performance of the fans after connecting the proper supply and starting/stopping of fans at desired setting and free from abnormal noise. All men, material, consumables, T&P shall be provided by the contractor at his own cost. |
| 3 | 132kV Bhoor: 63MVA 1No., 40MVA 2No., 20MVA 2No. |
| 4 | 132kV Bhoor-II: 40MVA-I 2No., 40MVA-II 2No. |
| 5 | 132kV Gulaothi: 40MVA-I 2No., 40MVA-II 1No. |
| 6 | 132kV BB Nagar: 40MVA-I 2No., 40MVA-II 2No. |
| 7 | 132kV Lakhaoti: 40MVA- 1No., 63MVA – 2No. |
| 8 | 220kV Rukhi: 60MVA-I 2No., 60MVA-II 2No. |
| 9 | 220kV Sikandrabad: 63MVA-1No, 100MVA-II 1No. |
| 10 | Complete rewinding and servicing of 240 wat, 610 mm Sweep, 1400 rpm, 50Hz, 3 phase 415 Volt cooling fans 63 MVA Transformers by removing the fans from transformer. Dismantling of fans and rewinding of motor with fresh supper enamelled copper wire of standard gauge and drying properly after varnishing, replacement of worn out bearing 2 Nos. repairing of bearing housing turning of shaft and changing of connection leads, refitting of the fans on the transformers radiators and checking the performance of the fans after connecting the proper Supply.132kV Bhoor: 20MVA 4No., 40MVA 4No.132kV Bhoor-II: 40MVA-I 5No., 40MVA-II 1No.132kV Gulaothi: 40MVA-I 2No., 40MVA-II 1No.132kV Siyana: 40MVA-I 2No.220kV Sikandrabad 40MVA-I 1No., 100MVA-Ist 1No. |
AI Tender Summary
Tender Timeline
Mar 19, 2025
11:30 IST
Tender Published
Tender notice published.
CompletedMar 26, 2025
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedMar 26, 2025
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender