River Bank Protection Work On The Right Bank Of River Fulahar For A Length Of 60 M At Village-Naya Bilaimari, Mouza-Maniknagar, Block-Ratua-I, P.S.-Ratua, Dist.-Malda At Mahananda Embankment Sub-Division No.-Iii Under Mahananda Embankment Division
Tender Overview
Project Description
River Bank Protection Work On The Right Bank Of River Fulahar For A Length Of 60 M At Village-Naya Bilaimari, Mouza-Maniknagar, Block-Ratua-I, P.S.-Ratua, Dist.-Malda At Mahananda Embankment Sub-Division No.-Iii Under Mahananda Embankment Division
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation in the canals / drainage channels / borrow pits / River bed / slope of bank as noted below as per designed section & throwing the spoils in layers of 25 cm. for making banks as per profile or to deposit the same in any other place within an initial lead of 30 metre and initial lift of 1.5 metre including breaking clods, rough dressing etc. complete as per direction of the Engineer-in-charge.(a) Ordinary soil / local soil / soil mixed with moorum or kankar / silt, dry or moist / slushy silt / sticky soil. |
| 2 | Supplying Nylon cage netting different size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete. |
| 3 | (a) For 1 m x 1 m x 1 m nominal size crate |
| 4 | (b) For 1 m x 1 m x 0.60 m nominal size crate |
| 5 | (c) For 1 m x 1 m x 0.40 m nominal size crate |
| 6 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than 0.028 m3.Size of Nylon crate is 1metre x 1metre x 1metre.b) Where boats arenecessary. |
| 7 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in HDPE bagswith local earth or sand, sewing and tying the crate with nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled HDPE bags should not be less than 0.0328 m3.a) Size of Nylon crate is 1metre x 1metre x 0.6metre.Where boats are not necessary. |
| 8 | a) Size of Nylon crate is 1metre x 1metre x 0.6 metre. |
| 9 | b) Size of nylon is 1 metre X 1 metre X 0.40metre.Consider 85 % filling of each bag for compact on the crate for slope pitching as per guideline. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender