Public Administrative Department Local Bodies Closing in 0 days TDR #48307518

Tender For Work Of Internal Conservation, Landscaping Etc. Of The Historic Butler Gate Located In Butler Colony. Part-B - Site Clearance 2 Disposal Of Moorum/Building Rubbish/ Malba/ Similar Unserviceable, Dismantled Or Waste Material By Mechanical Tran

Issued by Local Bodies · lucknow, Uttar Pradesh
Tender Value
53.06 Lakhs
Estimated cost
Bid Submission
25 Mar 2025
0 days left
EMD
1.06 Lakhs
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Work of internal conservation, landscaping etc. of the historic Butler Gate located in Butler Colony. Part-B - SITE CLEARANCE 2 Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for all lead for all lifts, complete as per directions of Engineer-in-charge. 3 DISMANTLING WORKS 4 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. 5 Raking out joints in lime or cement mortar and preparing the surface for re pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. 6 FINISHING WORKS 7 Lime plaster 1:1:1 (1 lime putty : 1 surkhi: 1 finesand) 8 Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi) 9 Plastering of the dome in lime mortar 1:1:1(1 Lime:1 surkhi:1 coarse sand) of 100mm thickness 10 Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followedby grinding to fine paste for smooth finish 11 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) 12 Providing and laying of artistic painting on wall in approved shade including the cost of themetically designing of artworks including graphics, text, illustrations as per design approved by Architect in charge. 13 Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc.Red sand stone 14 Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. Red sand stone 15 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class teak wood 16 Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) Second class teak wood35 mm thick shutters 17 WATERPROOFING WORKS 18 Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineralTurpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding). 19 ROAD WORK 20 Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge. 21 Providing and fixing of 40 to 50 mm thick granite cobble stone of approved color, size and design, including setting in position to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand), with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixture with pigment to match the shade of stone aand pointing with same mortar. 22 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1 23 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3 24 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69 25 Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR civil 2.25a 26 Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). DSR Horticulture 2020; 2.2 27 Supplying and stacking sludge at site including royalty and carriage upto 5km lead complete (sludge measured in stacks will be reduced by 8% forpayment). DSR Horticulture 2020; 2.3 28 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). DSR Horticulture 2020; 2.25 29 Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). DSR Horticulture 2020; 2.8 30 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge DSR Horticulture 2020; 2.9 31 Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing includingremoval of rubbish and surplus earth, if any, with all leads and lifts (cost ofmanure, sludge or extra good earth if needed to be paid for separatelyHoles 45 cm dia, and 45 cm deep. DSR Horticulture 2020; 2.14.4 32 Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) DSR Horticulture 2020; 2.57 RA 33 Shrubs Plant 2.57.2 34 Hedge Plant/Ground Cover 2.57.3 35 Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 15 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020;7.67 36 Providing and stacking of Alternanthera species of height 15 cm to 20 cm, full of branches and foliage in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 6.2 37 Providing and stacking of Chandni dwarf of height 15-20 cm., well branched in earthen potsof size 20 cm as per direction of the officer-in-charge. s per direction of the officer-in-char. DSR Horticulture 2020;8.14 38 Providing and displaying of Spathiphyllum (peace Lilly), having 15 cm to 25 cm ht. blooming stag with fresh & healthy foliage well developed in 15 cm of Earthen pot/plastic pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 3.90 39 Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. DSR Horticulture 2020; 2.28 40 Providing & laying Selection no. 1 doob grass turf with earth 50mm to60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light rollermake the surface smoothen and light watering the same maintenance for30 days or more till the grass establish properly,as per direction of officer in charge. DSR Horticulture 2020; 2.34 41 PLUMBING 42 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 150 mm dia. R.C.C. pipeDSR Civil 2023, 19.6.2 43 Constructing brick masonry road gully chamber 110x50x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame and vertical grating complete as per standard design : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 44 HORTICULTURE MAINTENANCE FOR 12 MONTHS 45 Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.) Play grounds / Public parks Per Sqm (as per yard stick 1Mali =2.00Acre).DSR (Hort) 2020/2.40.5 46 Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/ edge bed watering, manureing & apply insecticides & fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. DSR20202.2.36 47 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). DSR 2020 horti - 2.25 48 Supplying and stacking of good earth at site including royalty and carriage upto 10 km lead complete (earth measured in stacks will be reduced by 20% for payment). PSR Contract No. 490/CE/2024 49 Supply & stacking Urea 40% Nitrogen @160 kg per acre (as per yard stick of CPWD LDA SOR 2018-19/11.1 50 Supply & stacking DAP 50 kg per acre/year. LDA SOR 2018-19/11.2 51 Supply & Stacking Bone Meal/ Oil Cake(LDA SOR Horti 2018-19/11.3) 50 kg per acre/Year 52 Removal of garden waste by TATA 407 or equivalent including loading and unloading and carriage upto 1 km lead, complete disposal upto designated place as per direction of Officer in charge. DSR Horticulture 2020/2.60 53 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1 54 Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand: 8 graded stone ballast 40mm. nominal size) including supply of all materials. labour and T&P etc.required for proper completionof the workand curing complete, also including cost of formwork in foundation and floors.(DSR 4.1.8/2023) 55 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3 56 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69 57 Supply & Fixing of floral and ornate cast iron bollard and ornamantal chain as per design casted dise grinded and pin grinded for smooth surface finish with proper removal of casting, suitably spray preminered dried and then base surfacer coated and subsequently spray painted with premium quality high glass enamel paint of colour approved by engineer-in-charge, including cost of fastener, etc. PSR (item no. 133 - Upgradation and Beautification of Ghanta Ghar)

BOQ

Name of Work -%cVyj dkyksuh fLFkr ,sfrgkfld cVyj xsV ds vkUrfjd laj{k.k] yS.MLdsfiax vkfn dk dk;ZA ikVZ&ch
Sl. No. Item Description
1SITE CLEARANCE
2Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for all lead for all lifts, complete as per directions of Engineer-in-charge.
3DISMANTLING WORKS
4Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead.
5Raking out joints in lime or cement mortar and preparing the surface for re pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.
6FINISHING WORKS
7Lime plaster 1:1:1 (1 lime putty : 1 surkhi: 1 finesand)
8Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi)
9Plastering of the dome in lime mortar 1:1:1(1 Lime:1 surkhi:1 coarse sand) of 100mm thickness
10Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followedby grinding to fine paste for smooth finish
11Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
12Providing and laying of artistic painting on wall in approved shade including the cost of themetically designing of artworks including graphics, text, illustrations as per design approved by Architect in charge.
13Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc.Red sand stone
14Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. Red sand stone
15Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class teak wood
16Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) Second class teak wood35 mm thick shutters
17WATERPROOFING WORKS
18Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineralTurpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding).
19ROAD WORK
20Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge.
21Providing and fixing of 40 to 50 mm thick granite cobble stone of approved color, size and design, including setting in position to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand), with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixture with pigment to match the shade of stone aand pointing with same mortar.
22Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1
23Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3
24Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69
25Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR civil 2.25a
26Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). DSR Horticulture 2020; 2.2
27Supplying and stacking sludge at site including royalty and carriage upto 5km lead complete (sludge measured in stacks will be reduced by 8% forpayment). DSR Horticulture 2020; 2.3
28Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). DSR Horticulture 2020; 2.25
29Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). DSR Horticulture 2020; 2.8
30Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge DSR Horticulture 2020; 2.9
31Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing includingremoval of rubbish and surplus earth, if any, with all leads and lifts (cost ofmanure, sludge or extra good earth if needed to be paid for separatelyHoles 45 cm dia, and 45 cm deep. DSR Horticulture 2020; 2.14.4
32Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) DSR Horticulture 2020; 2.57 RA
33Shrubs Plant 2.57.2
34Hedge Plant/Ground Cover 2.57.3
35Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 15 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020;7.67
36Providing and stacking of Alternanthera species of height 15 cm to 20 cm, full of branches and foliage in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 6.2
37Providing and stacking of Chandni dwarf of height 15-20 cm., well branched in earthen potsof size 20 cm as per direction of the officer-in-charge. s per direction of the officer-in-char. DSR Horticulture 2020;8.14
38Providing and displaying of Spathiphyllum (peace Lilly), having 15 cm to 25 cm ht. blooming stag with fresh & healthy foliage well developed in 15 cm of Earthen pot/plastic pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 3.90
39Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. DSR Horticulture 2020; 2.28
40Providing & laying Selection no. 1 doob grass turf with earth 50mm to60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light rollermake the surface smoothen and light watering the same maintenance for30 days or more till the grass establish properly,as per direction of officer in charge. DSR Horticulture 2020; 2.34
41PLUMBING
42Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 150 mm dia. R.C.C. pipeDSR Civil 2023, 19.6.2
43Constructing brick masonry road gully chamber 110x50x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame and vertical grating complete as per standard design : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5
44HORTICULTURE MAINTENANCE FOR 12 MONTHS
45Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.) Play grounds / Public parks Per Sqm (as per yard stick 1Mali =2.00Acre).DSR (Hort) 2020/2.40.5
46Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/ edge bed watering, manureing & apply insecticides & fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. DSR20202.2.36
47Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). DSR 2020 horti - 2.25
48Supplying and stacking of good earth at site including royalty and carriage upto 10 km lead complete (earth measured in stacks will be reduced by 20% for payment). PSR Contract No. 490/CE/2024
49Supply & stacking Urea 40% Nitrogen @160 kg per acre (as per yard stick of CPWD LDA SOR 2018-19/11.1
50Supply & stacking DAP 50 kg per acre/year. LDA SOR 2018-19/11.2
51Supply & Stacking Bone Meal/ Oil Cake(LDA SOR Horti 2018-19/11.3) 50 kg per acre/Year
52Removal of garden waste by TATA 407 or equivalent including loading and unloading and carriage upto 1 km lead, complete disposal upto designated place as per direction of Officer in charge. DSR Horticulture 2020/2.60
53Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1
54Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand: 8 graded stone ballast 40mm. nominal size) including supply of all materials. labour and T&P etc.required for proper completionof the workand curing complete, also including cost of formwork in foundation and floors.(DSR 4.1.8/2023)
55Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3
56Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69
57Supply & Fixing of floral and ornate cast iron bollard and ornamantal chain as per design casted dise grinded and pin grinded for smooth surface finish with proper removal of casting, suitably spray preminered dried and then base surfacer coated and subsequently spray painted with premium quality high glass enamel paint of colour approved by engineer-in-charge, including cost of fastener, etc. PSR (item no. 133 - Upgradation and Beautification of Ghanta Ghar)

AI Tender Summary

OUR REF NO 48307518
AUTHORITY Local Bodies
TENDER VALUE 53.06 Lakhs
LAST DATE 25-03-2025
Authority
Authority Name Lucknow Development Authority
Work Description Tender For Work of internal conservation, landscaping etc. of the historic Butler Gate located in Butler Colony. Part-B - SITE CLEARANCE 2 Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved municipal dumping ground for all lead for all lifts, complete as per directions of Engineer-in-charge. 3 DISMANTLING WORKS 4 Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. 5 Raking out joints in lime or cement mortar and preparing the surface for re pointing or replastering, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge. 6 FINISHING WORKS 7 Lime plaster 1:1:1 (1 lime putty : 1 surkhi: 1 finesand) 8 Repairing ornamental plaster works to match with the existing design using lime plaster (1lime putty:1surkhi) 9 Plastering of the dome in lime mortar 1:1:1(1 Lime:1 surkhi:1 coarse sand) of 100mm thickness 10 Lime punning with lime putty mixed with Gur,Bilgri,Urd and other ingredients followedby grinding to fine paste for smooth finish 11 Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm) 12 Providing and laying of artistic painting on wall in approved shade including the cost of themetically designing of artworks including graphics, text, illustrations as per design approved by Architect in charge. 13 Providing and fixing stone jali 40 mm thick throughout in cement mortar 1:3 (1 cement : 3 coarse sand), including pointing in white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment, matching the stone shade, jali slab without any chamfers etc.Red sand stone 14 Stone work, plain in copings, cornices, string courses and plinth courses, upto 75 mm thick in Cement mortar 1:6 (1 cement : 6 coarse sand), including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust) with an admixture of pigment matching the stone shade. Red sand stone 15 Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately). Second class teak wood 16 Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling which will be paid for separately, all complete as per direction of Engineer-in-charge. (Note:- Butt hinges and necessary screws shall be paid separately) Second class teak wood35 mm thick shutters 17 WATERPROOFING WORKS 18 Applying breathable, non-reactive, antifungal, and water repellant Silane/ Siloxane chemical as approved by Archaeological Survey of India/ Engineerin- charge, of approved brand and manufacture, diluted with solvent mineralTurpentine oil in the ratio of 1:12 (One part of approved chemical :12 Part of Turpentine oil), on the existing sand stone masonry surface with two or more coats to give uniform application of chemical on the surface, all complete as per direction of Engineer-In-charge (The rate is inclusive of all materials & labours involved except scaffolding). 19 ROAD WORK 20 Providing and laying 75 mm thick compacted bed of dry brick aggregate of 40 mm thick nominal size including spreading, well ramming, consolidating and grouting with jamuna sand, including finishing smooth etc. complete as per direction of Engineer-in-charge. 21 Providing and fixing of 40 to 50 mm thick granite cobble stone of approved color, size and design, including setting in position to the required level and line over a bed of 20 mm average thick cement mortar 1:5 (1 cement : 5 coarse sand), with joints 3mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixture with pigment to match the shade of stone aand pointing with same mortar. 22 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1 23 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3 24 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69 25 Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. DSR civil 2.25a 26 Supplying and stacking of good earth at site including royalty and carriage upto 5 km lead complete (earth measured in stacks will be reduced by 20% for payment). DSR Horticulture 2020; 2.2 27 Supplying and stacking sludge at site including royalty and carriage upto 5km lead complete (sludge measured in stacks will be reduced by 8% forpayment). DSR Horticulture 2020; 2.3 28 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 5 k.m.lead complete (Cattle manure measured in stacks will reduced by 8% for Payment). DSR Horticulture 2020; 2.25 29 Spreading of sludge, dump manure and/or good earth in required thickness as per direction of officer-in-charge (cost of sludge, dump manure and/ or good earth to be paid separately). DSR Horticulture 2020; 2.8 30 Mixing earth and sludge or manure in the required proportion specified or directed by the Officer-in-charge DSR Horticulture 2020; 2.9 31 Digging holes in ordinary soil and refilling the same with the excavated earth mixed with manure or sludge in the ratio of 2:1 by volume (2 parts ofstacked volume of earth after reduction by 20% : 1 part of stacked volume of manure after reduction by 8%) flooding with water, dressing includingremoval of rubbish and surplus earth, if any, with all leads and lifts (cost ofmanure, sludge or extra good earth if needed to be paid for separatelyHoles 45 cm dia, and 45 cm deep. DSR Horticulture 2020; 2.14.4 32 Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) DSR Horticulture 2020; 2.57 RA 33 Shrubs Plant 2.57.2 34 Hedge Plant/Ground Cover 2.57.3 35 Providing and stacking of Clerodendrum inerme having ht. 25 cm to 30 cm multi branched in 15 cm size of Earthen Pot / Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020;7.67 36 Providing and stacking of Alternanthera species of height 15 cm to 20 cm, full of branches and foliage in 15 cm size of Earthen Pot/Plastic Pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 6.2 37 Providing and stacking of Chandni dwarf of height 15-20 cm., well branched in earthen potsof size 20 cm as per direction of the officer-in-charge. s per direction of the officer-in-char. DSR Horticulture 2020;8.14 38 Providing and displaying of Spathiphyllum (peace Lilly), having 15 cm to 25 cm ht. blooming stag with fresh & healthy foliage well developed in 15 cm of Earthen pot/plastic pot & as per direction of the officer-in-charge. DSR Horticulture 2020; 3.90 39 Preparation of mounds of various size and shape by available excavated / supplied earth in layers not exceeding 20 cm in depth, breaking clods, watering of each layer, dressing etc., lead upto 50 meter and lift upto 1.5 m complete as per direction of Officer-in-charge. DSR Horticulture 2020; 2.28 40 Providing & laying Selection no. 1 doob grass turf with earth 50mm to60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light rollermake the surface smoothen and light watering the same maintenance for30 days or more till the grass establish properly,as per direction of officer in charge. DSR Horticulture 2020; 2.34 41 PLUMBING 42 Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : 150 mm dia. R.C.C. pipeDSR Civil 2023, 19.6.2 43 Constructing brick masonry road gully chamber 110x50x77.5 cm with bricks in cement mortar 1:4 (1 cement : 4 coarse sand) including 500x450 mm precast R.C.C. horizontal grating with frame and vertical grating complete as per standard design : With common burnt clay F.P.S. (non modular) bricks of class designation 7.5 44 HORTICULTURE MAINTENANCE FOR 12 MONTHS 45 Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, hedge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter , removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide , Pesticide will be provided by the Department & lawn mover and brush cutter with fuel , other T & P material/articles shall be provided by the contractor.) Play grounds / Public parks Per Sqm (as per yard stick 1Mali =2.00Acre).DSR (Hort) 2020/2.40.5 46 Cutting of Hedge/Edge including removing of cut material, cleaning, hoeing of hedge/ edge bed watering, manureing & apply insecticides & fungicides etc. (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. DSR20202.2.36 47 Supplying and stacking of well decayed cattle manure at site including royalty and carriage upto 05 k.m. lead complete (cattle manure measured in stacks will reduced by 8% for Payment). DSR 2020 horti - 2.25 48 Supplying and stacking of good earth at site including royalty and carriage upto 10 km lead complete (earth measured in stacks will be reduced by 20% for payment). PSR Contract No. 490/CE/2024 49 Supply & stacking Urea 40% Nitrogen @160 kg per acre (as per yard stick of CPWD LDA SOR 2018-19/11.1 50 Supply & stacking DAP 50 kg per acre/year. LDA SOR 2018-19/11.2 51 Supply & Stacking Bone Meal/ Oil Cake(LDA SOR Horti 2018-19/11.3) 50 kg per acre/Year 52 Removal of garden waste by TATA 407 or equivalent including loading and unloading and carriage upto 1 km lead, complete disposal upto designated place as per direction of Officer in charge. DSR Horticulture 2020/2.60 53 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including gettingout and disposal of excavated earth upto 50 m and lift upto 1.5 m, asdirected by Engineer-in- Charge:All kinds of soil0.30m & above. DAR 2.6.1 54 Providing and laying Cement concrete 1:4:8 ( 1 cement : 4 coarse sand: 8 graded stone ballast 40mm. nominal size) including supply of all materials. labour and T&P etc.required for proper completionof the workand curing complete, also including cost of formwork in foundation and floors.(DSR 4.1.8/2023) 55 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) DAR 4.1.3 56 Providing and laying at or near ground level factory made kerb stone of M-25 grade cement concrete in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement: 3 coarse sand), including making joints with or without grooves (thickness of joints except at sharp curve shall not to more than 5mm), including making drainage opening wherever required complete etc. as per direction of Engineer-in-charge (length of finished kerb edging shall be measured for payment). (Precast C.C. kerb stone shall be approved by Engineer-in-charge). DSR 16.69 57 Supply & Fixing of floral and ornate cast iron bollard and ornamantal chain as per design casted dise grinded and pin grinded for smooth surface finish with proper removal of casting, suitably spray preminered dried and then base surfacer coated and subsequently spray painted with premium quality high glass enamel paint of colour approved by engineer-in-charge, including cost of fastener, etc. PSR (item no. 133 - Upgradation and Beautification of Ghanta Ghar)
Basic Detail
Tender No 142/E-Tender/CE/2025
Bidding Type Tender
Location
City lucknow
State Uttar Pradesh
Key Dates
Publish Date 18 Mar 2025
Submission Date 25 Mar 2025
Open Date 26 Mar 2025
Finance
Tender Value 53.06 Lakhs
Tender Fee 2950
EMD 1.06 Lakhs
Exemption Not Available
Document List
b6d4a655-2236-4b30-8be5-fc6fe11036aa.html
BOQ_1836837.xls
TDDDD.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Mar 18, 2025
11:30 IST

Tender Published

Tender notice published.

Completed
Mar 25, 2025
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Mar 26, 2025

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

b6d4a655-2236-4b30-8be5-fc6fe11036aa.html

xls

BOQ_1836837.xls

pdf

TDDDD.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender