Supplying Of Materials To New Gram Panchayat Building At Kolur Village In Koppal Taluka - Helper, (Semi - Skiller Labour),Operator, (Semi - Skiller Labour),For Lowering, Laying And Jointing (Skiller Labour),Support Vehicle,,Fuel/Energy Charges And Average Ouput 1200 Mt Per Day (The Consumption Of 200Ltr Per 8 Hours At The Rate Of Rs 60 Per Iter Of Diesel),Laser Guided, Trencher Machine/Mechanical Means For Laying Of Perforated Corrugated Flexible Pipe With 250 Gsm Geosynthetic Filter Pipes In Accordance To Is 9271,Transportation, Of Material To Site, 8% Of (1 2 3),Accessories/Moulded Fittings Coupler, End Cap, Reducers, T-Joints, Y-Joints, 160Mm Tee (4Kg/Cm2), 90 X 80 X 90Mm Tee, 110 X 80 X 110Mm Tee, 120 X 120 X 80Mm Tee, 110 X 110 X 100 Mm Tee, 145 X 145 X 80Mm Tee, 160 X 80 Tee, 200 X 200 X 80Mm Tee, 200 X 200 X 100Mm Tee, 250 X 250 X 80Mm Tee, 100Mm Cross. 8% Of (1 2),Geosynthetic, Filter Material 250 Gsm,Perforated Corrugated, Pvc Pipe, 80 Mm Dia,Licenced Plumber With Tools,,Lead Or Pvc Connection, Pipe 32 Mm Dia (For Wash Basin),C.I. / M.S. Brackets, For Flushing Cistern,Brass, Stop Cock,Cp Brass Waste 32,Mm Of Standard Pattern,Cp Brass Chain, With Plug,,Copper Plated Brass Piller Tap 15 Mm,White Vitreous China Clay Flat Back Wash Basin Size 550 X 400 Mm,Add White Lead Paint , Gasket , Cement , Sand For Making Good The Wall And Floor At 2 % On Material,Trap, 100 Mm, S Or P,Indian Type Water Closet, Of Size 580 Mm Of Specified Make With Footrests,Handling Loading And Unloading 3 % On Material,Labour Charges For Lifting And Placing In Position And Making Connection At 7 % On Material,Polyenthylene Water Storage Tank Of Specifief Capacity L,Add Brush , Putty , Sand Paper At 2 % On Cost Of Paint,Water Proofing, Cement Paint.,Add Brush, Putty At 5% On Cost, Of Distemper Primer.,Distemper, Primer.,Add Brush , Putty , Glue At 5 % On Cost Of Paint,Whitening.,,Dry Distemer,White, Cement.,Ceramic Tiles, Of Size 30 X 30 Cms,Add White Cement, For Pointing At 2% On Material.,Border, Tiles 30 X 10 Cms,Glazed, Tiles 300X450.,Binding, Wire,Tmt Bars Fe, 500,Add Brush At 1 % On Cost Of Paint,Enamel Metal, Paint,Add Providing And Removing Scaffolding At 3 % On Labour,Painter Class L,Add Wire Brush, Fine Steel Wool, Putty , Sand Paper , At 3 % On Cost Of Paint,Ready Mix Primer Paint (Ready Miix Red Lead Paint),Add Hom Of Welding And Grinding Machine At 4 % On Material,Welder Grade, L,Fitter Class L,Ms, Flat,M . S , Rods,Unit Cost As Per The, Specification.,Honnewood Planks, For Panels 20 Mm Thick,Honne, Wood,Hom, Of Machinaries For Planing,Add Cutting And Other Wastage 5 %,Mathi/Nandi Wood, Scantling,Add Handling , Loading And Unloading At 1 % On Material,Solid Concrete Block (40X 15 X20 Cms)- 5.00 N/Sqmm,Add Watering, Charges At 1 % On Labor,Stone, Chistler Class Ll,Mason Class Ll (With Tools),Mason Class L (With Tools),Mixer ( Concrete Small, Used In Culvert),Boulders,.,,Bond Stone 20 X 20 X 45, Cm,Size Stone, 20 X 20 X 25 Cms.,Casurina Poles 100 - 150,Mm,Add Handling , Loading And Unloading At 2 % On Material,Casurina Poles, 75 - 100 Mm Dia,Jungle Wood,Runners And Planks,Silver Oak Or Equivalent, Planks,Hom Of Vibrator 0.71, Days.,Plasticizer, / Super Plasticizer.,Add Watering Charges, At 1 % On Material.,Mixer (Concrete) - 1,Cum Capacity.,Portland, Cement.,Coarse Sand (Zone -Lll),Broken Stone Aggreate 12, Mm To 10,Mm Size,Broken Stone Aggregate 20,Mm Size.,Broken Stone Aggregate 40Mm Size.