| 1 | Complete Overhauling with painting of 50 MVA Transformer Cooling Fans with supply of all materials if required |
| 2 | Repair and Overhauling of 3ph Sub-mersible pump including materials, lifting & lay down of Sub-mersible pump from Borewell , repair of water supply pipe all complete job & Transporation cost. |
| 3 | Repair of 132 KV SF6 Breaker 1Φ spring charged motor if required |
| 4 | Repair of 33 KV VCB 1Φ spring charged motor if required |
| 5 | Testing transformer oil by recognized laboratory including supply of sampling bottle |
| 6 | BDV |
| 7 | DGA |
| 8 | Water content PPM |
| 9 | Total Acidity |
| 10 | Inter Facial Tension(IFT) |
| 11 | Furan Analysis |
| 12 | Contingency(To&Fro Charges including fooding & lodging) |
| 13 | Erection, Connection, Testing and commissioning as per directions of E/I. |
| 14 | 132 KV SF6 CB excluding foundation |
| 15 | 132 KV CT |
| 16 | 132KV CVT/PT |
| 17 | 132 KV LA |
| 18 | 33 KV VCB |
| 19 | 33 KV CT/PT |
| 20 | 33 KV LA |
| 21 | Dismantling of following equipments with Crane/derrick at site including handling the material/equipments carefully at site including labour charges for all incidental and operational items of work ( Excluding Cost of Transportation Charges from Store to Site.) |
| 22 | 132 KV SF6 CB excluding foundation |
| 23 | 132 KV CT |
| 24 | 132KV CVT/PT |
| 25 | 132 KV LA |
| 26 | 33 KV VCB |
| 27 | 33 KV CT/PT |
| 28 | 33 KV LA |
| 29 | Transportation ofmaterilas & equipments through Truck/Pickup upto 3MT including loading,unloading of the materials |
| 30 | Upto First 50kM |
| 31 | 50kM |
| 32 | Air Condition |
| 33 | AC Gas Filling (Charging ) |
| 34 | AC Compressor supply and installation |
| 35 | Copper condenser coil |
| 36 | Annual Maintenance without spares |
| 37 | Maintenance of 100 KVA DG Set (replacement of air & fuel filter, gasket valve cover, engine tube oil etc.) |
| 38 | 220 V Battery Charger Maintenance at 132/33 KV GSS Goilkera |
| 39 | Assessment of Battery charger at GSS Goilkera. |
| 40 | Maintenance and replacement of defect parts/equipments of battery |
| 41 | Supply of Consumables viz. Markin cloth, Distilled water, Grease, Mobil, Nuts & Bolts, Cotton waste, Joute, Paterollium Jelly, Kerosine, mobil, WD-40 rust remover etc. required time to time for O&M works of GSS. |
| 42 | GST @ 18% |
| 43 | Total after GST |
| 44 | Labour Cess @1% |