|
| 1 | ARC for 400KV S/Y,T/F,Gen 1ST YEAR |
| 2 | 4 weekly PM of 400 KV CB |
| 3 | 4 weekly PM of 400 KV CT |
| 4 | 4 weekly PM of 390 KV LA |
| 5 | 4 weekly PM of 400 KV CVT |
| 6 | 4 weekly PM of Gen. TRANSFORMER |
| 7 | 4 weekly Preventive mtc. ofSAT |
| 8 | Cleaning of Exciter & Replacing Brushes |
| 9 | Cleaning and Replacment of Shaft Earthin |
| 10 | 48 weekly PM of 400 KV CB |
| 11 | 48 weekly PM of 400 KV CT |
| 12 | 48 weekly PM of 400 KV CVT |
| 13 | 48 weekly PM of 400 KV ISOLATOR |
| 14 | 48 weekly PM of 390 KV LA |
| 15 | 48 weekly PM of Gen. TRANSFORMER |
| 16 | 48 weekly Preventive mtc. of SAT |
| 17 | 12 weekly PM of 400 KV CB |
| 18 | 24 weekly PM of 400 KV ISOLATOR |
| 19 | 24 weekly PM of Gen. TRANSFORMER |
| 20 | 24 weekly Preventive mtc. ofSAT |
| 21 | Oil / SF6 filling in EHVCB / GCB |
| 22 | Routine checking of equipments |
| 23 | Miscellaneous job for 4 Hours |
| 24 | Attending the Breakdown at site |
| 25 | Attending Hot Spots in 400KV S/Yard |
| 26 | Replacement of 400KV CB/isolator motor |
| 27 | Replace of Jumper Interstate Line & Busb |
| 28 | Checking of Jumper Interstate Line & Bus |
| 29 | Maintenance of 400KV isolators |
| 30 | Maintenance of CT/ CVTs |
| 31 | Clng & chkng of EHVCB / isolator MK |
| 32 | Checking & cleaning Excitation Trf |
| 33 | Clng & ckng of EHV bushing & LA of G/Trf |
| 34 | Clng & checking of LV bushing of G/Trf |
| 35 | Arresting oil lekages in the Transformer |
| 36 | Clng & checking coolers of G/Trf. |
| 37 | Replacing oil pump of G/Trf. |
| 38 | Clng & checkng of the MK of G/Trf or SAT |
| 39 | Clng & checking of HV/LV bushings of SAT |
| 40 | Replacing silica gel of the G/Trf or SAT |
| 41 | Cleaning and Washing of Gen Trf/SAT |
| 42 | Clng & checking coolers of SATs |
| 43 | Cleaning & changingoil of OLTC |
| 44 | Replacement of T/F fan/pump motor. |
| 45 | Cleaning & checking of Gene Bushing Term |
| 46 | Cleaning & Checking Of NGR/NGT |
| 47 | Replacing the Motor of NG Switch |
| 48 | Cleaning & Checking Of SPVT/ LAVT |
| 49 | Maintenance of the Gene. Exciter |
| 50 | Maintenance of IPBD/APU |
| 51 | Maintenance of GCB |
| 52 | Checking & cleaning of 420kV CB |
| 53 | Isolating Trf for testing 31.5-292.4MVA |
| 54 | Dismantling of 400KV CT/CVT |
| 55 | Dismantling of 400KV LA |
| 56 | Dismantling of 400KV Wave Trap |
| 57 | Dismntg & erection of 4”Al tube<=10 Mtr |
| 58 | Erection of 400KV CT/CVT |
| 59 | Erection of 400KV LA |
| 60 | Erection of 400KV Wave Trap |
| 61 | Replacement of jumper betwn Equip& Equip |
| 62 | Replacement of suspension disc insulator |
| 63 | Replacement of tension disc insulator. |
| 64 | Replacement of 400 kV BPI |
| 65 | Checking & cleaning of set of 6 BPI |
| 66 | Checking & cleaning of String Insulator |
| 67 | Checking & strengthening of Shield wire |
| 68 | Providing of crane with 100 Ft Boom for |
| 69 | Providing ofcrane with 100 Ft Boom on# |
| 70 | Providing of 14T Hydra crane for 8#Hrs a |
| 71 | Providing of 14T Hydra crane beyond 8 Hr |
| 72 | Shifting of T/F oil filter m/c. |
| 73 | Commisning & decomm of T/F filter M/c. |
| 74 | c) Oil filtration of Transformers |
| 75 | Cleaning/ maint. Of oil filter m/c. |
| 76 | Clng & checking DCDB of the Switchyard. |
| 77 | Clng & checking ACDB of the Switchyard. |
| 78 | Clng & checking MLDB of the Switchyard. |
| 79 | Laying/remov of cntr cable diff. size. |
| 80 | Cleaning of Cable Trenches |
| 81 | Checking & attending Swyrd Tower Light |
| 82 | Replacement of 400KV Jack Bus |
| 83 | Maintenanceof offices Electrical |
| 84 | ARC for 400KV S/Y,T/F,Gen 2ND YEAR |
| 85 | 4 weekly PM of 400 KV CB |
| 86 | 4 weekly PM of 400 KV CT |
| 87 | 4 weekly PM of 390 KV LA |
| 88 | 4 weekly PM of 400 KV CVT |
| 89 | 4 weekly PM of Gen. TRANSFORMER |
| 90 | 4 weekly Preventive mtc. ofSAT |
| 91 | Cleaning of Exciter & Replacing Brushes |
| 92 | Cleaning and Replacment of Shaft Earthin |
| 93 | 48 weekly PM of 400 KV CB |
| 94 | 48 weekly PM of 400 KV CT |
| 95 | 48 weekly PM of 400 KV CVT |
| 96 | 48 weekly PM of 400 KV ISOLATOR |
| 97 | 48 weekly PM of 390 KV LA |
| 98 | 48 weekly PM of Gen. TRANSFORMER |
| 99 | 48 weekly Preventive mtc. of SAT |
| 100 | 12 weekly PM of 400 KV CB |
| 101 | 24 weekly PM of 400 KV ISOLATOR |
| 102 | 24 weekly PM of Gen. TRANSFORMER |
| 103 | 24 weekly Preventive mtc. ofSAT |
| 104 | Oil / SF6 filling in EHVCB / GCB |
| 105 | Routine checking of equipments |
| 106 | Miscellaneous job for 4 Hours |
| 107 | Attending the Breakdown at site |
| 108 | Attending Hot Spots in 400KV S/Yard |
| 109 | Replacement of 400KV CB/isolator motor |
| 110 | Replace of Jumper Interstate Line & Busb |
| 111 | Checking of Jumper Interstate Line & Bus |
| 112 | Maintenance of 400KV isolators |
| 113 | Maintenance of CT/ CVTs |
| 114 | Clng & chkng of EHVCB / isolator MK |
| 115 | Checking & cleaning Excitation Trf |
| 116 | Clng & ckng of EHV bushing & LA of G/Trf |
| 117 | Clng & checking of LV bushing of G/Trf |
| 118 | Arresting oil lekages in the Transformer |
| 119 | Clng & checking coolers of G/Trf. |
| 120 | Replacing oil pump of G/Trf. |
| 121 | Clng & checkng of the MK of G/Trf or SAT |
| 122 | Clng & checking of HV/LV bushings of SAT |
| 123 | Replacing silica gel of the G/Trf or SAT |
| 124 | Cleaning and Washing of Gen Trf/SAT |
| 125 | Clng & checking coolers of SATs |
| 126 | Cleaning & changingoil of OLTC |
| 127 | Replacement of T/F fan/pump motor. |
| 128 | Cleaning & checking of Gene Bushing Term |
| 129 | Cleaning & Checking Of NGR/NGT |
| 130 | Replacing the Motor of NG Switch |
| 131 | Cleaning & Checking Of SPVT/ LAVT |
| 132 | Maintenance of the Gene. Exciter |
| 133 | Maintenance of IPBD/APU |
| 134 | Maintenance of GCB |
| 135 | Checking & cleaning of 420kV CB |
| 136 | Isolating Trf for testing 31.5-292.4MVA |
| 137 | Dismantling of 400KV CT/CVT |
| 138 | Dismantling of 400KV LA |
| 139 | Dismantling of 400KV Wave Trap |
| 140 | Dismntg & erection of 4”Al tube<=10 Mtr |
| 141 | Erection of 400KV CT/CVT |
| 142 | Erection of 400KV LA |
| 143 | Erection of 400KV Wave Trap |
| 144 | Replacement of jumper betwn Equip& Equip |
| 145 | Replacement of suspension disc insulator |
| 146 | Replacement of tension disc insulator. |
| 147 | Replacement of 400 kV BPI |
| 148 | Checking & cleaning of set of 6 BPI |
| 149 | Checking & cleaning of String Insulator |
| 150 | Checking & strengthening of Shield wire |
| 151 | Providing of crane with 100 Ft Boom for |
| 152 | Providing ofcrane with 100 Ft Boom on# |
| 153 | Providing of 14T Hydra crane for 8#Hrs a |
| 154 | Providing of 14T Hydra crane beyond 8 Hr |
| 155 | Shifting of T/F oil filter m/c. |
| 156 | Commisning & decomm of T/F filter M/c. |
| 157 | c) Oil filtration of Transformers |
| 158 | Cleaning/ maint. Of oil filter m/c. |
| 159 | Clng & checking DCDB of the Switchyard. |
| 160 | Clng & checking ACDB of the Switchyard. |
| 161 | Clng & checking MLDB of the Switchyard. |
| 162 | Laying/remov of cntr cable diff. size. |
| 163 | Cleaning of Cable Trenches |
| 164 | Checking & attending Swyrd Tower Light |
| 165 | Replacement of 400KV Jack Bus |
| 166 | Maintenanceof offices Electrical |