}

Tender For 2000163896-Jc-Thermal Insulation P&F Cy25-Pp-Mech, vizianagaram-Andhra Pradesh

Arcelor Mittal Nippon Steel India Limited has published Tender For 2000163896-Jc-Thermal Insulation P&F Cy25-Pp-Mech. Submission Date for this Tender is 22-03-2025. Insulation work Tenders in vizianagaram Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

48295553
Tender For 2000163896-Jc-Thermal Insulation P&F Cy25-Pp-Mech
Tender
Indian
Andhra Pradesh
Vizianagaram
22-03-2025

Tender Details

Tender For 2000163896-Jc-Thermal Insulation P&F Cy25-Pp-Mech 2000163896 10 10 70 PROVIDING & DOING INSULATION 350 M 50 Scaffolding Charges 1,700 M2 40 FIXING OF M.S.SHEET 1,700 M2 80 PROVIDING & DOING INSULATION 350 M 10 SUPPLY/APPLI.OF INSULATION OF 100MM 2,400 M2 20 Supply & erection of 22 SWG Al sheet 2,100 M2 30 Removal of Old Insulation 1,700 M2 60 SUPPLY& APPL. LRB INSULATION 50MM 450 M2 Email : yogeshwara.rao@amns.in Contact : Name : Gaddam Yogeshwara Rao Item Details : 1. Specification: a. LRB mattress with SS netted wires to thickness as required for the ducts., with 125 kg/m3 (Tolerance +/-15%) density of the LRB material. • Mattress -Mineral Wool LRB (Confirming to IS-8183) • Thickness; 100mm. • Service Temperature of LRB-Heat Resistance-750 Deg C • Thermal Conductivity- As Per IS-3346/8183 • Chloride content -0.01% Max. As per IS:8183 • Shot Content- Over 250 Micron-15% Max <(>&<)> Over 500 Micron-5% Max. • Moisture Absorbtion-2% Max • Moisture Content-2% Max • Incombustibility-5% Max • Fibre Dia-7mics Max. • Resistant to Vibration-1% Max • Resistant to Jolting 3% Max • Alkalinity-7-10 pH • Recovery after compression-90% Min. • Resin Content-2% max. • Netting size- 3/4 X 24 swg GI wire netting one side <(>&<)> as per IS-280 <(>&<)> 3150. b. Aluminium sheet to be cladded over the LRB material of thickness 22 SWG and necessary joints are to be screwed or wherever necessary based on duct application to be banded with aluminium banding. c. Sound pressure level: 85 +2 dB (A) d. Scaffolding (in the scope of vendor) 2. Scope: a. Removal of Older Insulation. (Surface to be insulated shall be cleaned of all dirt. Oil loose scale etc. by wire brushing.) b. Scaffolding for the insulation (pipes, planks, clamps, jack screws and other items)-installation requirement. c. Welding of supporting MS flats and anchors d. LRB fixing and sheeting as per specification. e. MS Flats included in the scope of vendor. f. Ceramic Rope supply <(>&<)> Installation ½ and 1 sq. rope. g. Manpower and material required. h. Documentation, Reporting. 3. Quantities: a. Unit of measurement: Sq. M 4. Schedule of Rates (SOR): S. No Description Qty** Unit Rate / Unit Total 1 Scaffolding Charges---------------------------2400.00 M2 2 Removal of Old Insulation-------------------- 2100.00 M2 3 Supply <(>&<)> erection of LRB 125kg/m3 100mm--------1700.00 M2 4 Supply <(>&<)> erection of 22 SWG Al sheet plain------1700.00 M2 5 MS Flat for Insulation--------------------------1700.00 M2 6 Supply <(>&<)> erection of LRB 125kg/m3 50mm thick-----450.00 M2 7 Supply <(>&<)> Application 1/2 Ceramic Rope for Oil Pipe---350 M 8 Supply <(>&<)> Application 1 Ceramic Rope for Oil Pipe-----350 M **Quantities are estimated and Actual Qty may vary as per site conditions <(>&<)> requirement. Required supporting flats to be supplied by Vendor. Scaffolding is the square meter of application of Scaffold work during Insulation works of ducts carried out if any. Vendor to submit break up for services rendered. 4. Important Terms: a. Sufficient manpower to be deployed as per the requirement by the vendor to complete the job within the agreed stipulated time. b. Minimum 3 workers to be stationed in the plant on daily basis. c. Quality of workmen ship should be as per standards. d. Manpower performance shall be evaluated internally by AM/NS Engin person without giving any reasons. e. Guarantee period to be 2 years from the date of installation of insulation. If the insulation or sheets failed within 6 months, then not less than 50% of rectification to be carried out by the vendor free of cost. f. All the traceability reports of the material supplied to be submitted by the vendor for the new material being fixed, particularly new insulation LRB, Aluminium Sheet. (TDS reports). g. Vendor shall provide necessary break up of Gate In record at AMNS material gate for the new material being used against the work order for every Job work claim. Also, shall maintain necessary reconciliation report and submit once requested. h. Bills should be enclosed with the Job measurement sheet, completion, and satisfactory report of Area Engineer along with the MIS report of the AMC (Consolidated bill Statement) without which bills shall be rejected. i. Raw materials storage room required for Insulation, Sheets, scaffolding pipes, GI sheet shall be provided by AM/NS . Bills shall be raised based on Sq. m of actual application of Material/services usag

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail