|
| 1 | Various mechanical repairing worksin Deonar abattoir |
| 2 | work of removing old storage cabin and fabrication and fixing of storage cabin with gates as per specifications |
| 3 | work of fabrication providing, and fixing of medium hording frame at various location as per specifications |
| 4 | work of Designing, Typing, Printing, providing and sticking Vinyle sticker with lamination as per specifications |
| 5 | work of fabrication, providing, and fixing of Concertina Coil Fencing, Barbed Razor, 450 mm with Y shape bracket at 10 ft distance. at sheep unloading ramp as per specifications |
| 6 | Work of fabrication, repairing, refurbishment and painting from both side of existing Diamond shape fencing and railing, MS angles, and including gates. Railing height is 7 FT at sheep unloading ramp as per specifications |
| 7 | work of removing old gates and fabrication providing and fixing of sliding gates area is 11x7 ft. by using material: 4\"\"x2\"\"x16 gauge rectangle pipe for framing and 1.5\"\" 16 gauge for internal framing and fixingofdiamond shape fencing with all necessary accessories with oil painting as per department. at sheep unloading ramp(near toilet block) |
| 8 | work of removing old gates and fabrication providing and fixing of sliding gates area is 13x7 ft. by using material: 4\"\"x2\"\"x16 gauge rectangle pipe for framing and 1.5\"\" 16 gauge for internal framing and fixingofdiamond shape fencing with all necessary accessories with oil painting as per department. at sheep unloading ramp(near canteen) |
| 9 | work of Design fabrication providing and fixing of 4\"x4\" MS double door gate by using material 2\"\"x2\"\"x16 gauge MS box pipe for outer framing and 1.5\"\"x 1.5 \"\"x16 gauge for inner horizontal fixing at 6-8 inch gap with double hinges. At sheep unit pens.as per specifications |
| 10 | work of Design fabrication providing and fixing of 5\"x4\" MS double door gate by using material 2\"\"x2\"\"x16 gauge MS box pipe for outer framing and 1.5\"\"x 1.5 \"\"x16 gauge for inner horizontal fixing at 6-8 inch gap with double hinges. At sheep unit pens as per specifications |
| 11 | work of Design fabrication providing and fixing of 5\"x4\" MS single door gate by using material 2\"\"x2\"\"x16 gauge MS box pipe for outer framing and 1.5\"\"x 1.5 \"\"x16 gauge for inner horizontal fixing at 6-8 inch gap with double hinges. At sheep unit pens as per specifications |
| 12 | work of removing of old damage I-channel and pipe of column and providing fabrication and fixing and strengthening of ramp structure with fixing of 6\"\"x3\"\" I channel height is 8 ft. including minor civil work & concrete filing ( 55x 11ft) at sheep unit ramp as per specifications |
| 13 | work of fabrication providing and fixing of MS railing at height 4ft. And length is 13 ft. by using material 2 inch round pipe at 6 inch gaps. at sheep unit ramp as per specifications |
| 14 | work of providing replacement of AC sheet of length 8 ft . At sheep unit pens as per specifications |
| 15 | work of scrapping repairing and oil painting as per Department of over all sheep loading ramp structure, railings, sheds, channels, and platform and resting shed area structure . At sheep unit pens as per specifications |
| 16 | work of fabrication providing replacement and fixing of G.I wire mesh jali with height 4 ft. of choky at sheep and goat pensareaas per specifications |
| 17 | Repairing & strengthening work of SS platform in kena section at sheep unit as per specifications |
| 18 | work of framing fabrication and cover from all side and fabrication of new gate for old shed by using material provided by department (profile sheet angles and other required materials). Total area of Shed is 30\"x20\" and height is 11 ft. at mechanical section as per specifications |
| 19 | Work of providing fabrication and replacement of corrosion profile sheet in cash counter office. At sheep unloading ramp HIUR office. as per specifications |
| 20 | work of repairing, cleaning, drinking water tank with inlet and outlet plumbing work with taps and all accessories. Small size(200ltr capacity) as per specifications |
| 21 | work of repairing, cleaning, drinking water tank with inlet and outlet plumbing work with taps and all accessories.Big Size (1000&1200Ltr tanks capacity) & shifting of 2 units |
| 22 | Replacement of pulley of legging platform& shaft of sheep slaughter line no. 3 as per sample |
| 23 | Repairing & strengthning work ofShutter withsrapping & painting of red oxide paint & 2 Coat of Aluminium paint |
| 24 | work of fabrication providing and fixing of MS railing at height 42 inch. And length is 12 ft. by using material 2 inch round pipe for horizontal and4 x 2 inch I channel for vertical support at 8 inch gaps. |
| 25 | Rebate ofold unserviceable MS material |
| 26 | Rebate ofold unserviceable MS materialto take away |