Tender For Work Of New Sewer Line In Ward No. 97, 98, 99 And 95 - Dismantling of cement concrete pavement for sewer line and manholes by mechanical means using pneumatic tools, cutting the peripheral edge by CC cutter, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), rehandling of material/earth to complete the task. 2 Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. 3 Depth upto 1.5 m 4 Add extra for over all depth of excavation above 1.5 m and upto 3.0m over item no 17.1.1.1 5 Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP3 class (with s/s ends) IS: 458 - 1988 (amended up to date) marked and pipes from 300 mm upto 2000 mm manufactured through vertical / vibrated casting process all levels with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 6 200 mm internal diameter 7 250 mm internal diameter 8 300 mm internal diameter 9 Providing, lowering & laying in trenches, aligning & jointing of IS marked SW pipes (IS: 651:1980 amended up date) at all depths with rubber gaskets (EPDM/ SBR) for sewer lines and laying as per IS:4127:1983 (amended up to date) including cost of Rubber gaskets, lubricants and sectional hydro testing of the sewer pipe line (including the cost and conveyance of water to site for testing) complete in all respect as per specification and the directed of the Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 10 200 mm Nominal Dia 11 250 mm Nominal Dia 12 310 mm Nominal Dia 13 Providing granular bedding having width = outer dia of pipe (Bc) + 500mm, thickness below pipe = 0.25Bc or 100mm (whichever is higher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sheive, 20 to 50 % passing through 10mm sheive and 100 % retain on 6.3mm sheive, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing andor as directed by Engineer. 14 200 mm internal diameter 15 250 mm internal diameter 16 300 mm internal diameter 17 Providing and constructing of RR stone masonry circular manholes of Type-A with internal dia 0.90m and depth upto 1.65m having 300mm thick RR stone masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC footsteps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole Type-A of depth 0.90 m 18 Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferably red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect. 19 Providing, lowering, laying in trenches, aligning, fixing in position and jointing socketed rubber gasket type ISI marked uPVC pipes of Class III (6 Kg/sqcm) suitable for potable water with rubber ring joints (as per IS 4985-2000) of following outer dia with all accessories (excluding specials) complete including all material, labour, hydraulic testing and commissioning as per Technical Specifications and as per direction of Engineer. Note : E/w to be measured and paid separately.160 mm dia 20 Providing and making house service connections from water supplydistribution uPVC/ DI/ CI pipe line upto water meter chamber inside the property using MDPE/ HDPE (Class-PE 80) PN 6 composite pipes for upto 5 metre length. The item consisting of composite pipes of MDPE/ HDPE pipe below the ground level and GI class B pipe above the ground level including supply and fixing of ferrules, clamps, rubber sheets, tapping, compression fittings etc, complete including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. With MDPE pipe 20 mm Diameter MDPE below the ground & 15 mm GI pipe class B above the ground 21 Providing, lowering, laying & jointing MDPE/ HDPE pipes (Class-PE 80) PN 12.5 composite pipes for extra length for house service connections as per drawing and specifications complete including all material, labour, testing and commissioning as per Technical Specifications and as per direction of Engineer. With MDPE pipe 20 mm dia service pipe 22 Constructing masonry Chamber 30x30x50 cm, inside with 75 classdesignation brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for stop cock, with C. I. surface box 100x100 x75 mm (inside) with hinged cover fixed in cement concrete slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) necessary excavation foundation concrete 1:5:10 ( 1 cement : 5 fine sand:10 graded stone aggregate 40mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12mm thick finished with a floating coat of neat cement complete as per standard design : With bricks 23 Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer. 24 Lime Concrete, cement concrete grade M-10 (1:5:10) and below 25 Cement Concrete Grade M-15 and above and PCC blocks 26 Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. 27 Providing and laying un-reinforced, dowel jointed, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximumsize of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. PCC M-20 28 CARRIAGE OF MATERIALS (By Mechanical Means): Carriage of Materials By Mechanical transport including loading, unloading and stacking:: Remark : The rates will be applicable to net quantities after deduction of prescribed percentage for voids mentioned in the specification under subhead Carriage of Materials 29 Earth 5 Km 30 Beyond 5 Km upto 10 Km. per Km.