| 1 | Dewatering work by 5 HP Diesel pump set with operator & P.O.L. |
| 2 | Clearinggrass and removal of rubbish up to a distance of 50 m out side the periphery of the arae cleared. Sl. No.2.32 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind soil DSR NO 2.8.1 |
| 4 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind soil DSR NO 2.8.1 |
| 5 | Removal of slush from nala bed before excavation s.soil .incl allID SOR Chap. V Sl.No. 1(iii) With 5 Lift |
| 6 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind soil DSR NO 2.8.1 |
| 7 | P.C.C. Work with 1:3:6 (cement,c/sand & 20-40 mm s/ballast i/all cost of material, labour etc. Required for proper completion of work. |
| 8 | coursed Rubble Masonary (First sort) with hord stone in foundation and plinth with cement mortor 1:6 (1: cement 6: coarse sand ) 7.7.1 |
| 9 | coursed Rubble Masonary (First sort) with hord stone in foundation and plinth with cement mortor 1:6 (1: cement 6: coarse sand ) 7.7.1 |
| 10 | Random Rubble masonry with hord stone in foundation and plinth including levelling up to with cement cocrete 1:6:12 (1:cement ,6: coarse sand,12: gradede stone aggregate 7.1.1 |
| 11 | Cement Concret 1:2:4 (1 cement : 2course sand : 4 graded stone aggregate) complete.20 mm nominal size stone aggregate |
| 12 | Plaster work 1:3 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work. |
| 13 | Raised pointing work 1:2 (cement :c/sand) morter on stone masonary i/all the cost of material, labour etc. required for proper complition of the work. |
| 14 | Laying of dry stone boulder filling in inverted filter including cost of material, labour etc. |
| 15 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kind soil DSR NO 2.8.1 |
| 16 | Supply and fixing of sign board at site. |
| 17 | ( Rates in BOQ are exclusive of G.S.T. Amount ) |