Operation of wheel washing, ETP day to day cleaning of all ramps and platform etc.
2
Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
3
Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials. All kinds of soil
4
Manure or sludge Lead - 3 km carriage of materials ,earth cost per trip per unit 1 k.m (by providing tractor weekly one day)as per EIC
5
Rep. of skimmer with changing of silicon endless belt, scrapers and all bearing. All complete as per direction of EIC
6
overhauling and changing of all diffuser and making up to date WITH REPAIRING OF AIR COMPRESSOR ALL complete as per direction of EIC
7
Rep. ofnMMF with all complete include removing cleaning of old media changing of all strainers and filling of new media all completes as per EIC
8
Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
9
Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.