| 1 | Excavation for pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 mtr. and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M. As Per MJP/DSR Item No. 01. |
| 2 | Excavation for pipe trenches in hard murum and boulders, W.B.M. road including removing the excavated material up to a distance of 50 mtr. and lifts as below, stacking and spreading as directed, manual dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (Bd-A-1/259) Lift 0 to 1.5 M. As Per MJP/DSR Item No. 03. |
| 3 | Removing following pipe SWG / RCC excluding cost of necessary excavation and refilling of the trenches, breaking the joints, lifting the pipes & stacking to the place as directed by the Engineer – in – Charge with all leads and lifts including cleaning the surfaces etc. complete. (I. No.: 12) MJP DSR Page No.: MJP/DSR/ Item No.: 01 Page No.: 29 Item No.: 150 mm dia. SWG Pipe Line. |
| 4 | Supplying ISI Standard 250 mm dia. salt glazed S.W.G. Pipe including Transportations loading, unloading etc. complete. As Per Market Rate Analysis. |
| 5 | Lowering, Laying and jointing of 250 mm dia. salt glazed S.W.G. Pipe including including fitting such as bends, tees, single junction, double junctions laying, jointing….etc. complete. As Per Market Rate Analysis. |
| 6 | Providing and constructing on drainage line B.B. masonary circular manhole, concentric cone 0.90 mtrs. dia. at bottom and 0.5 mtrs. dia at top and upto a depth of 1.50 mtrs. with 23 cm thick brick work in C.M. 1 : 6 prop, with 12 mm thick. Cement plaster in 1:4, with smooth rendering, 1:2:4 coping and fixing S.F.R.C. Frame and cover of 56 cm dia etc.(Excluding cost of SFRC frame& Cover ) including all necessary excavation & 1:5:10 bed c.c.etc all complete as directed by Engineer - in - charge.(Rate for 1.50 M is 15,461/-) (Rebate for every decrease in depth of 30cm or part there of Rs. 2232/- per 30cm) MJP DSR Page No:as per Rate analysis Item No:Depth : 1.50 Mtr |
| 7 | Providing & Supplying steel fiber reinforced concrete (S.F.R.C.) frame & cover heavy duty/medium duty of rectangular or circular in shape of approved make including loading unloading, transportation, all taxes etc. complete as directed by Engineer- in - charge. (20tonnes Capacity). As Per MJP 2021 -22. |
| 8 | Repairing and Reconstructing on drainage line B.B. masonry circular manhole, concentric cone 0.90 mtrs. dia. at bottom and 0.5 mtrs. dia at top with 23 cm thick brick work in C.M. 1 : 6 prop, with 12 mm thick Cement plaster in 1:4, with smooth rendering, 1:2:4 coping including all necessary excavation etc. all complete as directed by Engineer - in - charge. As Per MJP/DSR/2021-22. |
| 9 | Refilling the trenches with available excavated stuff with soft material first over pipe line and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging, etc. complete. As Per MJP DSR 2021 - 22 |
| 10 | Desilting the Supply Well, Intake Well / Head Works, Sump of water supply / sewerage works etc. in wet or dry condition including lifts upto 9 M and lead upto 150 M as required beyond the work site, stacking, spreading, including necessary guarding, etc. complete, as directed by Engineer-in-charge. As Per MJP DSR 2021 - 22 SECTION E EXCAVATION Page No. 45 Item No. 13. |
| 11 | Transportation of surplus material from work site to any disposal place as directed by the Engineer - in - charge with a lead of 5.00 km including and stacking etc. complete. As Per MJP/DSR/2021-22. |