| 1 | Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. |
| 2 | CoursedstoneKharanjamasonry(usinghammerdressedstonesnot less than 20 cm in any direction and at least 50 % stones to be more than23cmindepth)upto0.5thicknessontopofexposedface, includingall leads of all construction materials including curing etc. complete. |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earthwithininitialleadof50mandliftupto1.5mincludingdressingof excavated area and dewatering wherever required complete in all respect (C) Hard soil mixed with Kankar / boulders, Morrum |
| 4 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto (d) 20 mm |
| 5 | Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove |
| 6 | Side shuttering including propping etc. complete (to achieve finish F 2) for :(c) Retaining wall, counterfort, abutment, wing walls up stream or down- stream slope facings of dams and open faces of construction joints etc. |
| 7 | Supplying of M.S. reionforcement including labour charges for bending bindingandplacinginpositionallreinforcementasperdrawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985) |
| 8 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:1.5:3)includingleadsofallconstructionmaterials,curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto (d) 20 mm |
| 9 | ProvidingandLayinginpositionofCementconcreteNominalmix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3(1 cement : 3 coarse sand) and making good the joints excludingthe cost of centering, shuttering and reinforcement. Well graded crusherbroken stone aggregate of maximum size upto (d) 20 mm |
| 10 | Add extra over items of cement plaster/ cement concrete/cc.lining/cc flooring or RCC for providing and mixing Polypropylene/Polyester fibresas per IS 16481:2022 or latest revision, 6/12 mm long @ 0.25% (125 gram per 50 kg of cement) or in ratio of as specified by manufacturer specification and direction of Engineer in charge with all leads and lifts. |
| 11 | Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. (b) Columns, slabs, cantilevers projections staircases, lintels, beams, chajjas, Retaining walls, piers, abutments, galleries, arch covers, bed plates, sluice capstan bases etc. |
| 12 | Re-handling of excavated material including loading unloading and dressing withininitialleadof50mandliftof1.5mwithcostofde-watering whereverrequiredandallapplicabletaxesandleviesetc.completeinall respect. (b) Mixed strata muck |
| 13 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as morrum, sand, sandy silt, clay, black cotton soil, kankar, etc.Depth upto 1.5 m |
| 14 | Providing A.C. pipe Weep holes 150mm dia in Masonry/plain Concrete/Reinforced Concrete abutment, wing wall/return wall complete as per drawing and technical specification. [MoRTH Specification : Clause 2205]. |