|
| 1 | Removing of silt, dry leaves, murrum, small Boulders, etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals & disposingthe removed earth within a lead of 50 mtr during monsoon period. The rates are including removing of green wild creepers etc. silt thickness upto 100 mm thick and upto 3.00 M depth. |
| 2 | 230 to 749 mm wide at bottom |
| 3 | 750 to 2000 mm wide at bottom |
| 4 | Above 2000 mm upto 3000mm wide at Bottom |
| 5 | Above 3000 mm upto 5000mm wide at Bottom |
| 6 | Desilting of deposited silt by excavating from the stalling ponds & drains, canals, etc. at various locations and sizes and depth upto 3m below ground level including removing of wild vegetations, creepers, if any by the side of ponds as per the directions of Project Engineer. |
| 7 | Open RCC canals, drains inside and outside fencing |
| 8 | From box culverts arches. |
| 9 | Lead charges for removal of soil deposited from stalling ponds and other areas of BARC by mechanical transport for lead or mentioned below including loading, unloading , stacking, levelling etc. Note: The rate for this item is applicable for the net quantity arrived at after making deductions for voids @ 20% in respect of Soil and @ 30% in respect of debris from the truck measurement for payment. |
| 10 | Lead for Soil for 1st 1 KM or part thereof |
| 11 | Lead for Debris for 1st 1 KM or part thereof |
| 12 | Cleaning of existing storm water chamber of varying depth at various locations by removing the silt, leaves, small stones, earth etc. within a lead of 50 mtr during monsoon period including labour required for removing and replacingC.I Covers at storm water chamber.Mximum plan area of upto 1 SqM |
| 13 | Supplying man power along with necessary pans, spades, shovels pickaxe, punjas, ropes, small special spade, raincoats, safety shoes, etc. minimum two number of labour per day upto maximum any number of labour as and when decided by Project Engineer to work for eight hours per day (excluding Lunch) or monsoon period to carry out the cleaning of choked drains grating grills/hume pipes /footpath by removing the dryleaves, silt etc. and also carry out seasonable departmental work allotted by Project Engineer from time to time.Note:- 1) Unit of measurement shall be per man day per day ( i. e. Eight hours a day)2) :- Number of manpower requirement as and when required will be as per direction of Project Engineer. |
| 14 | Cleaning of existing storm water Hume Pipe lines of Different Diameters / Pipe culverts mentioned below and at all locations such as road, berms/ lawns, burried inside the building which are partly or fully filled with silt, small boulders, dry leaves, grass, etc. by disposing the removed debris within a lead of 50 mtrs and as directed by the Project Engineer. |
| 15 | Upto 450 mm Dia. |
| 16 | Above 450 mm Dia |
| 17 | Removing / Breaking big boulders of landslide by chieselling from road/ RCC canals, open rubble pitched canal and transporting the same with mechanical transport for lead exceeding 2 Km but not exceeing 3 Km including loading, unloading stacking and levelling.\"Note: The rates in respect of above item is applicable for the NET Quantities arrived at after making deductions for voids 50% from the corresponding Stack / truck measurement for payment. |
| 18 | Removing silt upto 100 mm thick, dry leaves, grass, etc. completely from theShahabad pavement / road / Terrace during the entire monsson period and transporting the removed earth, leaves, and debris to dumping ground upto 3 kms lead by mechanical transport as directed by Project Engineer. |
| 19 | Clearing Jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared as per specifications and as directed by the Engineer-in-charge. |
| 20 | Providing, supplyingloader cum excavator, including operator and helper for executing the work like excavation, grading, levelling, debris cleaning and other works all as directed by Project Engineer \" As and whenever required\" \"Note: 1. The rate shall be inclusiveof machine, Fuel, Operator, Driver, Helper and other consumablesetc.The contractor is required to engage skilled driver / Operatorpossessing valid driving license (ForExcavator/Loader). 2. The vehicle should be free from all sorts of defects and will be subjected to inspection by a representative of BARC whose decision is final and binding as regards suitability of that particular vehicle. 3. The cost of POL, maintenance of vehicleincluding replacement of parts, fuel, etc., wages of driver, Motor Vehicle taxes, comprehensive insurance, etc. shall be payable by contractor and BARC shall have no liability towards usage of the vehicle.4. The rates are inclusive of all taxes if any, excluding Goods & Service taxes (GST). 5. In and exit time at North Gate/South Gate of BARC shall be strictly considered for billing/payments/measurements. Logbook duly countersigned by EIC to be maintained. 6. Breakdown hours and lunch break timing shall not be considered for the payments. \"7. Fraction of hours shall be rounded off to nearest half an hour at time of preparing the bill. 8. BARC being a strategic Organisation, all the operators, drivers should have good credentials andshall have valid Police Verification Certificate, Driving licenses and address proof. They should be in a position to understand Hindi / English. \"9. Cost of damages to any Government movable/ immovable property in and around the site shall be entirely borne by the contractor. \"10. The contractor shall follow all security rules & regulations of BARC issued from time to time and no claim, whatsoever, will be entertained in this regard. \"11. The driver and the labourers shall work as per the instructions given by the departmental Officers. \"12. Advance intimation will be given to the contractor about the requirement. 13. The contractor shall take the signature of the departmental authorities on duty completion slip daily after completion of the work. 14. The contractor shall arrange adequate insurance coverage for his personnel. Department shall not be responsible for any liability arising out of any accident / injury caused to contractor persons while executing the job. 15. The contractor shall follow minimum wages act and other rules of Government of Maharashtra. |