|
| 1 | Play Equipments |
| 2 | Supply DOUBLE SWING suitable in outdoor conditions including carriages and conveyance etc. |
| 3 | Supply ARC SWING suitable in outdoor conditions including carriages and conveyance etc |
| 4 | Supply SLIDE FRP 6FT suitable in outdoor conditions including carriages and conveyance etc. |
| 5 | Supply DELUXE WAVE SLIDE suitable in outdoor conditions including carriagesand conveyance etc. |
| 6 | Supply DOUBLE SEESAW suitable in outdoor conditions including carriages andconveyance etc. |
| 7 | Supply MERRY GO ROUND REGULAR 4 SEAT Suitable in outdoor conditionsincluding carriages and conveyance |
| 8 | Supply of DUCK SPRING RIDER Suitable in outdoor conditions including carriage |
| 9 | Supply of JUNGLE JIM Suitable in outdoor conditions including carriage |
| 10 | Cast iron bench 3 seater supply and conveyance include |
| 11 | Ice cream model dust bin for waste basket including conveyance |
| 12 | Fixing of Play eqipments |
| 13 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual meansin foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),including dressing of sides and ramming of bottoms, lift up to 1.5 m, includinggetting out the excavated soil and disposal of surplus excavated soil as directed,within a lead of 50 m.All kinds of soil |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) |
| 15 | Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete |
| 16 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 nominal size) |
| 17 | Providing and fixing Neelgiri/Mexican grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden (Dhurmos) and than rolling the surface with light roller make the surface smoothen and even, watering with sprinkler |
| 18 | Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete |