|
| 1 | supply and fixing of 230 V.No.volt coil |
| 2 | supply and fixing of Starter relay set |
| 3 | 1.5 HP Motor rewinding charges including materialscost. |
| 4 | supply and fixing of 1.5HP motor bearing 2 nos.and maintanance work. |
| 5 | supply and fixing of 150/200 MFD Starting condancer. |
| 6 | supply and fixing of 20 MFD Running condancer. |
| 7 | supply and fixing of 1.5HP Comproser 3 Bearings and mainteance workfixing labour charges |
| 8 | supply and fixing of Comprosser Connecting rod and Brass push and maintenance work. |
| 9 | supply and fixing of Comprosser Piston rings and 3 bearing and paral oning work. |
| 10 | supply and fixing of Comprosser oil seal |
| 11 | supply and fixing of 3/4\" Air filter |
| 12 | supply and fixing 20-40 Multi grade oil 1/2 litre |
| 13 | supply and fixing Comprosser Motor V.Belt No.35-42 |
| 14 | supply and fixing of 1/2\" G.I. Pipe.(TWAD SR 23-24 Page No.41) |
| 15 | supply and fixing of 1\" G.I. Pipe. (TWAD SR 23-24 Page No.41) |
| 16 | 1/2\" HDPE Hose one metre |
| 17 | 1\"HDPE Hose one metre |
| 18 | 20mm Gate valve(TWAD SR 23-24 Page No.46) |
| 19 | 25mm Gate valve (TWAD SR 23-24 Page No.46) |
| 20 | 1/2\"Union(TWAD SR 23-24 Page No.46) |
| 21 | 1/2\" G.I.Bend(TWAD SR 23-24 Page No.46) |
| 22 | 1/2\"GI Coupling(TWAD SR 23-24 Page No.46) |
| 23 | 1\"GI Coupling (TWAD SR 23-24 Page No.46) |
| 24 | 1\" CPVCpipe |
| 25 | 1\" CPVCTank Niple |
| 26 | 20mm Waste Not Tap.(TWAD SR 3-24 Page No.45) |
| 27 | 50mm M.S.Clamp set. (TWAD SR 3-24 Page No.45) |
| 28 | 6 1/2\" Bore cover plate with bole nutincluding |
| 29 | Comproser motor pipe Borewell inner side repair,remove and re errection labour charges |
| 30 | Supply and fixing of 1.5HP Sub motor pump threst Bearing & impular set |
| 31 | 1.5HP Sup motor coil rewinding charges |
| 32 | 1.5HP Sup motor repair and remove & re errection charges |
| 33 | 1.5HP sup motor panel board complete set (TWAD SR 23-24 Page No.118) |
| 34 | 3 Phase panal board complete setup to 5 HP.(TWAD SR 23-24 Page No.118) |
| 35 | DOL Starter with single phasing preventor (TWAD SR 23-24 Page No.119) |
| 36 | MCB 240V/415V 50hz AC Supply DP 40A, 10KA.(TWAD SR 23-24 P. No.211) |
| 37 | 32 Amps Fuses (TWAD SR 23-24 P. No.211 |
| 38 | 2.5 sq.mm 3 Core Flat type copper cable (TWAD SR 23-24 Page No.124) |
| 39 | 4.0 sq.mm 3 Core Flat type copper cable (TWAD SR 23-24 Page No.124) |
| 40 | 6.0 sq.mm 3 Core Flat type copper cable (TWAD SR 23-24 Page No.124) |
| 41 | 2x4sqmm cable& G.I wire Service wire change incl.material with labour |
| 42 | 3/4\" x6\"G.I.Service pipe & Fixing labour charges. |
| 43 | Supply and fixing of HDPE tank 500 Litres (TWAD SR 23-24 Page No.92) |
| 44 | Supply and fixing of HDPE tank 1000 Litres (TWAD SR 23-24 Page No.92) |
| 45 | Supply and fixing of HDPE tank 2000 Litres(TWAD SR 23-24 Page No.92) |
| 46 | Single phase Submersible pump set without panel board(15LPMx90M) (TWAD SR 23-24 Page No.104) |
| 47 | 3 phase Submersible pump set without panel board(30LPMx100M)(TWAD SR 23-24 Page No.105) |
| 48 | 2000 litre tank tap cover |
| 49 | Provision for GST 18% |