| 1 | Safe loading carriage including unloading and proper stacking of following materials from Central Store, Lucknow / JE Store to site of work. |
| 2 | ST Pole 11 M long |
| 3 | 11 KV RMU |
| 4 | 11 KV VCB I/C CTR 800/400/5A, 350 MVA |
| 5 | 11 KV VCB O/G CTR 400/200/5A, 350 MVA |
| 6 | Bus Coupler |
| 7 | 11 KV XLPE Cable 3x185 Sqmm |
| 8 | 11 KV XLPE Cable 3x185 Sqmm (I/D) |
| 9 | 11 KV XLPE Cable 3x185 Sqmm (O/D) |
| 10 | 11 KV XLPE Cable 3x185 Sqmm (S/Th) |
| 11 | Line Material |
| 12 | Erection, Grouting , plinthingof Substation type double pole with ST Pole 11 M long including mounting of Top Channel, Dropper Channel, base angle with clamps and nut and boltsAs per RESSPO norms (Only Polesshall be supplied by deptt.) |
| 13 | Fabrication & erection of single 11 Mtr long ST Pole with fixing of Cross Arm and necessary clamps required including digging of pit and fixing of all accessories as per RESPO Norms. Cost of clamps borne by contractor . |
| 14 | Grouting of Poles with cement, balast and corse sand |
| 15 | Plinthing of Poles |
| 16 | Painting of Poles |
| 17 | Supply HDPE Pipe for Cable Laying as Per Norms |
| 18 | Laying of 11 KV 3x185 Sqmm XLPE Cable in Single Circuit underground Manual Method Approximate 1Mtr Depth with HDPE Pipe. Cutting of Road with Laying ofas per agreement Nroms |
| 19 | Errection of 11 KV S/Th cable Jointing Kit of 3x185 Sqmm Complete work in alll respect with sealing its at both end ( All the Material Shall be supplied by Contractor excluding 11 KV S/Th cable Jointing Kit). |
| 20 | Pipe Type earthing with 20mtr deep boring and providing G.I. pipe 1.5 dia (20mtr G.I.pipe ) of tata jindal make and GI Strip 25x5mmx6 mtr long attached with clamps L Nut bolts and GI pipeAll material shall be supplyed by the contractor |
| 21 | Hoisting of 11KV 3x185 Sq. mm XLPE cable on double pole with proper clamping & jumpering.The cable will be passed through MS pipe of size 200 mm dia & pipe will be clamped with pole at the bottom, middle & top of the MS pipe (All the material will be arranged by the contractor except cable.) |
| 22 | High Pressure Testing as per Respo Norms if Required |
| 23 | Instalation & Commissioning of Busbar Coupler |
| 24 | Providing & Fixing Danger Board with Clamp (All Material supply by Contractor) As per Norms. |
| 25 | Off size Clamp (Supplied Contractor) |
| 26 | Alluminium Lugs |
| 27 | Transformer Base Angle |
| 28 | Top Channel |
| 29 | T-Off Channel |
| 30 | Taping of line |
| 31 | Earthing of Poles with M.S. earthing Rod |
| 32 | Supply & Errection of D.O. Fuse set |
| 33 | Supply & Errection of Fuse set |
| 34 | Making of Circuit |
| 35 | GI Pipe 4dia 3 Mtr Long |
| 36 | Instalation & Commissioning of 11 KV RMU |
| 37 | Instalation & Commissioning of 11 KV VCB I/C CTR 800/400/5A, 350 MVA |
| 38 | Instalation & Commissioning of 11 KV VCB O/G CTR 400/200/5A, 350 MVA |
| 39 | Other Petty Work |