| 1 | Excavation of earth in ordinary soil including lift up to 1.5m c sand lead upto 30 & including filling watering and remming of excated each trenches and plinth and removal and diposal of surplus earth as directed by the engineer in charge upto a distance of 30m from the foundation treches including all T&P phoarah and basket etc complet SOR No. 34 |
| 2 | Supply & Laying of 90mm die HDPE Pipe for Distribution system comforming to latest/Is specification with all joining material and special confirming to latest/relevant I.S. Specificatio including FOR destination and all taxes etc with loading unloding and casting up to site of wotk all complete as per instruction of engineer in charge as per SOR 41.01 |
| 3 | Dismantling of interlocking road of following type road and stacking of useful material and temporary rainstatement of road with old material etc all comp. SOR 50.3 |
| 4 | Reinstatement interlocking road of following type road and stacking of useful material and temporary rainstatement of road with old material etc all comp. SOR 51.3 |
| 5 | Making House connection all complete as per SOR 53 |
| 6 | Levelling of site and making pit for storage of water for boring purpose including labour T&P etc required for proper completion of work |
| 7 | Transpotration of mechenical boring matching T&P etc required for boring work including eection/dismantling of ring machine |
| 8 | B.G.L OW 60M |
| 9 | 160mm dia P.V.C. pipe of 10kg/cm2 |
| 10 | 125 mm dia P.V.C. pipe of 10kg/cm2 pressure approved quality |
| 11 | 125 mm dia P.V.C. pipe end cap of approved quality |
| 12 | Supply of Solvent pproved quality |
| 13 | Supply of 160 mm dia M.S. clamp approved quality |
| 14 | Supply of 65 mm dia M.S. clamp approved quality |
| 15 | 160 mm x 125 mm dia PVC Reducer of approved quality |
| 16 | 125mm dia IA mark PVC slotted stainer of of approved quality |
| 17 | B.G. LOW 60m |
| 18 | Supply and fixing gravel size 1.6m to 4.8mm of approved quality |
| 19 | Transpotration of compressure machine including garge machine oprator cost of fuel all comp of work |
| 20 | Washing of bore by compressure machine including garge of machine oprator cost of fuel all comp of work |
| 21 | lowering of 60mm B.DM ISI marked GI pipe with flanges at both end including cutting weilding threding etc all comp. |
| 22 | S/O Submersible pump set 05HP capacity ISI Mark Sor 7.02 |
| 23 | Supply and laying 3 core copper phenolax cable for connecting to control panel/stablizer to sunmersible |
| 24 | Supply and installation of 5KVA three phase automatic stablizer ISI mark for control of voltage of applied make all comp. SOR 12 |
| 25 | Making inter connecting of 63mm delivery pipe to exiting MS/PVC/AC pipe 3to 8 complete with special required SOR 53 |
| 26 | Supply and laying 3 core copper phenolax cable for connecting to control panel/stablizer. |
| 27 | Less than 03meter |
| 28 | more than 01 meter |
| 29 | local sand filling in pipe line work including supply of local filling watering ramming etc all work complete |
| 30 | supply of all material T&J etc and construct pump house as per departmental type design |
| 31 | watch and work of material during of execution of work |
| 32 | site clearance |
| 33 | cess charges |