| 1 | CENTRALIZED MATERIALS,Loading unloading & safe cartageand errection of new STP/PCC Poles and othermaterials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 80Km.) |
| 2 | STP POLE 09 MTR |
| 3 | STP POLE 11 MTR |
| 4 | PCC POLE 8.05 MTR |
| 5 | MS Top channel (125x65x2240mm) |
| 6 | MS Channel 125x65x1300mm (T-off) |
| 7 | MS Channel Dropper 100x50x6mm 2028mm long |
| 8 | ACSR Weasel Conductor |
| 9 | 11 KV Disc Insulator T&C type 4500kg. With fitting |
| 10 | 11 KV Pin insulator with Pin |
| 11 | 11/0.4 KV T/F 250 KVA |
| 12 | 11/0.4 KV T/F 100 KVA |
| 13 | 11/0.4 KV T/F 63 KVA |
| 14 | 11/0.4 KV T/F 25 KVA |
| 15 | MS angle 75x75x6x2028mm with clamp & bolt and nut (T/F base) |
| 16 | Stay set Complete 16x1800 MM |
| 17 | X-arm M.S. Angle 65×65×6 m m V Type |
| 18 | Earthing Complete |
| 19 | DE-CENTRALIZED MATERIALS, Provided by Contractor |
| 20 | Earthing Complete |
| 21 | LT PVC Cable Al 1x400 sq mm |
| 22 | LT PVC Cable Al 4x16 sq mm |
| 23 | 250 Sqmm Al.Lug |
| 24 | Fuse set |
| 25 | Chemical Earthing Complete |
| 26 | LT PVC Cable Al 1x240 sq mm |
| 27 | Alumimium Crimping Lug 240 sqmm |
| 28 | Alumimium Crimping Lug 250 sqmm |
| 29 | Alumimium Crimping Lug 400 sqmm |
| 30 | Copper L-piece 50x225x10mm |
| 31 | Barbed Wire |
| 32 | Top T-Off & Cross Brasing Angle Clamp With Nut & Bolt |
| 33 | T/F Trolly with 11 KV TPMO and Fencing |
| 34 | Stone pad 300x300x75mm |
| 35 | F- Bracket withNuts& Bolts |
| 36 | P.G. Clamp for weasel conductor With Nut & Bolt |
| 37 | 3 Phase LT Distribution Box Including Clamp With Nut & Bolt |
| 38 | Danger baord with Nut & Bolt |
| 39 | Cross Arm Holding Clamp with Nut & Bolt |
| 40 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 41 | Construction of Plinth Of Size size 2x2x1.5M & Fencing of All Type T/F With All Accessories. |
| 42 | Cairrage From Store to Site and Installation of 11/0.4 KV T/F 250 KVA ,100 KVA,63 KVA ,25 KVA With all accessories. |
| 43 | Recive Back From Site to Store of 11/0.4 KV T/F 250 KVA ,100 KVA,63 KVA ,25 KVA,10 KVA |
| 44 | Stringing of ACSR Weseal Conductor along with fitting of all accessories |
| 45 | Installation of 250 KVA T/F on Trolly with all Accessories |
| 46 | Guarding and fencing of 11/.4 KV S/S |
| 47 | Cairrage and Erection ofsingle support ST/PCC pole for installation of T/F including digging of pit, fitting of all accessories, back filling of earth & others required work. Proper Grouting of Poles. |