| 1 | Excavation in foundation in ordinary soil, loam, clay or sand including lift upto 1.5 m & lead upto 30m including filling watering & ramming of excavated earth into the trenches or into the space between the building & the sides of foundation trenches or in to the plinth removal & disposal of surplus earth as directed by the Engineer in charge upto a distance of 30 m from the foundation trenches. (S.I. 251) |
| 2 | Dismantling brick work or stone work in lime or cement mortar and including stacking material as directed by E/I within a distance of 60mt (200 Ft) (S.I. 692) |
| 3 | Concrete with 4 cm guage stone ballast, coarse sand of 2.50 fineness modulous and cement in proportion of 8:4:1 in foundation and under floor, including supply of all material labour and T&P etc. required for proper completion of the work. (S.I. 281) |
| 4 | RCC work with cement approved coarse sand and 2cm guage approved stone ballast in the proportion 1:1.5:3 in raft foundation excluding supply of reinforcement and its binding but including its fixing and biding the same includingn binding wire , neccessary centering and shuttering including supply of all material labour T&P etc complete PWD 287 |
| 5 | RCC work with cement approved coarse sand and 2cm guage approved stone ballast in the proportion 1:1.5:3 in for coloumn excluding supply of reinforcement and its binding but including its fixing and biding the same includingn binding wire , neccessary centering and shuttering including supply of all material labour T&P etc complete PWD 289 |
| 6 | RCC work with cement approved coarse sand and 2cm guage approved stone ballast in the proportion 1:1.5:3 in the lighter beam excluding supply of reinforcement and its binding but including its fixing and biding the same includingn binding wire , neccessary centering and shuttering including supply of all material labour T&P etc complete PWD 285 |
| 7 | First class brick work with 1:4 cement and coarse sand in foundation plinth including supply of all material, labour T&P etc. required for the proportion of the work as per S.I. 305 |
| 8 | First class Brick work in Super structure in 1:4 cement and couarse sand mortar incl. supply of all materials , labour and t& P required for proper completion of the work PWD 305 + 309 |
| 9 | Mild steel, or iron in plain work such as reinforce concrete or rainforce brick work when not includded over all retes wrought to required shape as necessary including bending or proper completion of the work and including supply of all steel and wastage and over lapping and hooks. includding cutting and welding revatting all complete of the work(S.I. No-504) |
| 10 | 12mm thick plaster with 1:4 ( one part cement & four parts of coarse sand of 2.75 F.M.) over brick work minimum thickness not to be less than 1 cm including supply of all material, labour, T&P etc. required for proper completion of the work (S.I. No-584(i) |
| 11 | Providing and applying white cement based putty of average thickness 1mm of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete (DSR 13.80) |
| 12 | Finishing wallwith acrylic smooth exteriaor paint of required shed 2 or more coat applied @ 1.67Liter per 10Sqm over and including base coat of water proofing cement paint applied @ 2.20Kg/10Sqm PWD 13.46.1 |
| 13 | Making grooves (S.I. 13.76) |