| 1 | Work of Round the Clock Shift Operation of 33/110KV Sector-10 and Jhariyanala Sub-Station of Obra Thermal Power Station, Obra. (Three skilled & Three Un skilled manpower shall be engaged per Sub-station) |
| 2 | Work of Round the clock shift maintenance of street light and HT/LT line system of Obra Project colony & CISF Colony.(two skilled & two unskilled manpower shall be engaged per shift) |
| 3 | Work of Routine maintenance of internal electrical wiring/fixing different type fixture/Routine maintenance of ceiling Fan in R.B\"s, N.R.B\"s of Obra Project Colony and CISF Colony. |
| 4 | Cleaning wild grasses works/tree chopping works/earth works. |
| 5 | Dismantling of existing damaged 11/33 KV HT electrical poles & accessories. |
| 6 | Fabrication and erection of guarding wire at road crossing complete in all respects. |
| 7 | Fabrication and erection of single rail pole. |
| 8 | Overhauling/repairing of spare 11KV Southern make OCB installed at 33/11KV Sub-Station, Obra. |
| 9 | Fabrication and commissioning of Male & female contacts of breaker as per sample (One set consists of 6 male & 24 female contacts). |
| 10 | Repairing of burnt, damaged copper stem. |
| 11 | Fabrication of Arching Chamber compatible for the breaker, as per sample. |
| 12 | Fabrication of Hub, roller (with assembly), roller pin and split pin, as per sample. |
| 13 | Overhauling/repairing works of Incomers and Feeder Breakers of Substations. |
| 14 | Rewinding work of ceiling fan. |
| 15 | Preventive/Breakdown maintenance works of ceiling fans. |
| 16 | End termination/ Straight through cable jointing of 33/11/0.4 KV 3C cables. |
| 17 | LayingofonenumberadditionalPVC insulatedandPVC sheathed / XLPE power cable of 11 KV grade of following size direct in ground in the same trench in one tier horizontal formation including excavation, sand cushioning, protective covering and refilling the trench etc as required. Above 120 sq. mm and upto 400 sq. mm. |
| 18 | Transportation of 11mtr. Rail pole from site store to work site. The work includes manual shifting of poles from stackyard to nearest approach road at work site, loading and unloading then shifting of pole manually at exact location of pole pit. |
| 19 | Transportation of ACSR Dog conductor to work site in crusher Field area and making proper arrangement to replace the damaged ACSR Dog conductor and dismantle the damaged conductors 6 nos. Phase wire and drawing, sagging by ACSR Dog conductor, 6 nos. Phase wire and making double of old and damaged ACSR Dog conductor and transported from site. |