| 1 | For Shifting of old and damaged 11 KV Branch Aladapur of Kuchlai feeder due ton Electrical safety reasons.The following works involves. |
| 2 | Supply of Tee-off Channel |
| 3 | Supply of Holding Clamp for PCC Pole |
| 4 | Supply of Holding Clamp for Round Pole |
| 5 | Supply of Nut Bolt with washer off size |
| 6 | Supply of Top Cleat for 11 KV STP |
| 7 | Supply of 11 KV F Clamp for PCC Pole |
| 8 | Supply of Stay Clamp |
| 9 | Carriage of ACSR Weasel Conductor From ESC, Sitapur to Dump Site |
| 10 | Carriage of ST Pole From ESC, Sitapur to Dump site |
| 11 | Carriage of PCC Pole From ESC, Sitapur to Dump Site |
| 12 | Carriage of other Line Material From ESC, Sitapur to Dump Site |
| 13 | Shifting of ACSR Weasel Conductor FromDump Site to work site |
| 14 | Shifting of ST Pole FromDump Site to work site |
| 15 | Shifting of PCC Pole FromDump Site to work site |
| 16 | Shifting of other Line Material FromDump Site to work site |
| 17 | Fabrication of Top, T-off, Dropper Channel etc |
| 18 | Laying stringing and sagging of ACSR Weasel Conductor |
| 19 | Errection of ST Pole |
| 20 | Errection of PCC Pole |
| 21 | Fixing of stay |
| 22 | Earthing of Pole |
| 23 | Grouting of Stay |
| 24 | Grouting of Pole |
| 25 | For Connecting Lodhipurwa Village From Sdhauli Town.The following works involves. |
| 26 | Supply of ALU 150 sqmm Lug |
| 27 | Supply of Nut Bolt with washer off size |
| 28 | Supply of Top Channel |
| 29 | Supply of Holding Clamp for Top/Dropper |
| 30 | Supply of Dropper Channel |
| 31 | Supply of LT Clamp for 8.5 mtr Pole |
| 32 | Supply of Tee-off Channel |
| 33 | Supply of Stay Clamp |
| 34 | Carriage of ACSR Weasel Conductor From ESC, Sitapur to Dump Site |
| 35 | Carriage ofAB Cable L.T. (3x120+1x95+1x16) sqmm From ESC, Sitapur to Dump Site |
| 36 | Carriage of PCC Pole From ESC, Sitapur to Dump Site |
| 37 | Carriage of other Line Material From ESC, Sitapur to Dump Site |
| 38 | Shifting of ACSR Weasel Conductor FromDump Site to work site |
| 39 | Shifting ofAB Cable L.T. (3x120+1x95+1x16) sqmm FromDump Site to work site |
| 40 | Shifting of PCC Pole FromDump Site to work site |
| 41 | Shifting of other Line Material FromDump Site to work site |
| 42 | Errection of Single PCC Pole |
| 43 | Laying stringing and sagging of ACSR Weasel Conductor |
| 44 | Fabrication of Top, T-off, Dropper Channel etc |
| 45 | Laying of AB Cable L.T. (3x120+1x95+1x16) |
| 46 | Fixing of stay |
| 47 | Earthing of Pole |
| 48 | Grouting of Stay |
| 49 | Grouting of PCC Pole |
| 50 | Shifting of Transformer |