| 1 | Supplying, dressing and stacking at site bamboo pins above 5 cm. diameter and upto 7.5 cm. diameter. (Dia. To be measured at mid length). |
| 2 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. |
| 3 | Supplying, fitting and fixing with ironnails half split bamboo wailing pieces (av. dia. of bamboo not less than 5.0 cm.) |
| 4 | Supplying Jhaw / Eucalyptus bullah piles at work site, including dressing and making one end pointed.(ii) 12.50 cm av. Diameter |
| 5 | Labour for driving Jhaw / Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.(ii) 12.50 cm av. diameter |
| 6 | Supplying, fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc. complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 7 | Supplying to site empty cement polythene bags (capacity50kg) in good condition including stacking, incedental charges etc. all complete (capacity 50 kg). |
| 8 | Labour charges for filling empty cement gunny bag / polythene bag (capacity50kg) with all kinds of earth (wetordry), sand or agreegates (stone/brick) and sewing as done in case of cement bags, (tying with a knot after filling will not be accepted), and stacking with in a lead of 30 metre as per direction of Engr-in-charge (cost is excluding the cost of any types of filling materials). |
| 9 | Dumping in position earth /sand filled gunny / poly bags (capacity50kg) within a lead of 30 metre inclusive of all lifts. |
| 10 | Supplying Nylon cage netting 1 metre x 1 metre x 1 metre size with knot having mesh size 17.5 cm x 17.5 cm constructed with nylon thread (210 x 24) having tensile strength not less than 250 Kg. / sq. cm. including carriage, delivery and stacking at site inclusive of all taxes complete |
| 11 | Labour charges for dumping and placing in position properly filled in Nylon crates with filled in gunny / poly cement bags (minimum 25 nos. having capacity 50 kg) with local earth or sand, sewing and tying the cratewith nylon wire within a lead of 150 m. and all lifts in river slope or bed by cutting trenches upto 50 cms depth, if necessary, or by boat including cost of hire charges of boat, boatmen and other necessary equipments and also including cost of bags, carriage and charge of filling bags with earth / sand but excluding cost of nylon crate as per direction of the Engineer – in – Charge.NB:- Volume of each earth/ sand filled bags should not be less than0.028 m3.Size of Nylon crate is 1metre X 1metre X 1metre...(a) Where boats are not necessary. |
| 12 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breachesetc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 13 | Extra rate over Item Nos. 1 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres.i) From 90 meter to 120metre- |
| 14 | Extra rate over Item Nos 1.0 for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre. |
| 15 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land , including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, clannels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within lead of-A) Beyond 2.00 km and up to 3.00 k.m |
| 16 | Bailing out water by pump including all leads and lifts and including making all arrangements for disposal,where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically as certained as perdirection of the Engineer-in-charge. |