| 1 | Clearing snow (with frost) from Roads, manually using picks and shovels; snow depth upto 150 mm |
| 2 | Clearing Snow (without frost) from Roads, manually; |
| 3 | Snow depth upto 150 mm |
| 4 | Snow depth over 150 mm but upto 250mm |
| 5 | Snow Clearance by Mechanical Means using Machines as specified or equivalent |
| 6 | Snow Plough 4WD 90 BHP (Trucks |
| 7 | Snow Plough 4WD 60 BHP (Trucks) |
| 8 | Snow depth over 150 mm but upto 250mm |
| 9 | Snow cutter Rolba 1500 |
| 10 | Sprinkling of Salt for clearing snow (Frost) Mannually |
| 11 | Slip Clearance In ordinary soils disposal lead upto 50 m and lift upto 1.5 m |
| 12 | In soils; mixed with moorum/Kankar/shingle/boulders; disposal lead upto 50 m and lift upto 1.5 m. |
| 13 | In soils; mixed with Decomposed Rocks; by blasting or any other means |
| 14 | Hand packed stone filling in horizontal level including cost of stones |
| 15 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone |
| 16 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with:Cement mortar 1:6 (1 Cement : 6 coarse sand) |
| 17 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared |
| 18 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m in -All kinds of soil. |
| 19 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : |
| 20 | Removal of unhygienic materials (so classified by the site engineer) from designated sites and its disposal as per directions, all inclusive. |
| 21 | Carriage of material by Mechanical Transport including loading / unloading and stacking at site com |
| 22 | Carriage of Stone at an average distance 5.00 Km by M.T |
| 23 | Carriage of Mulba at an average distance 5.00 km by M.T |