| 1 | Drilling of 150 mm dia borewell (Drilling of 200mm dia in strata and 150 mm dia drilling in hard rpcks including machinery, fuke Transportation and lbour carges on site of borewell to be drill) |
| 2 | Yeild testing of borwell usung 90 degree V notch by air lift method for 150mm dia Borewell work (Half Hour) |
| 3 | Dillimg og 115 mm dia, borewell work, (Drilling of 150 mm dia in soft rock and 150 mm dia drilling work in hardeocks, icluding Mchinery Fuel Trasportation charges of rig lobour charges on site of borewell to be drill. |
| 4 | After completion of 115 mm dia Borewell driling yield testing of borewell dreilling yield testing of borewell by 90 degree V notch (By Air lift method) (Half Hour) |
| 5 | Lowering and retreving of bencher in well and drilling time cutting material lobour charges. |
| 6 | Unloding benchers and other materials form the machine and re-mounting the machinne after completion of drilling work also site preparation and labour for moving benchers to each drilling well site for non-conventional plan drilling work |
| 7 | Drilling holes taken for bore blasting should be completely sealed after blastingforsafety reasons (Said rate will be applicable only for drilling boreholes dug under jacket well BBT,SBT) |
| 8 | Providing and fixing 180 mm dia PVC casing pipe for Drilling 150 mm dia borewell has presure 6kg//cm2 as per IS 485-1988 standard |
| 9 | Providing and fixing 1 sqmm dia PVC casing pipe 8kg /cm2 ISI 4985-1988 in Dry Rubble stone (If Caoing Oioe more than 40 Feets |
| 10 | providing and fixing 180 mm PVC casing Pipe 6kg/cm2 8kg/cm2 IS 4985-1988 casing Lowering and Grounting in To 12 mtr. |
| 11 | Providing and fixing PVC casing Pipe UP To 12 mtr. |
| 12 | Providing and fixing PVC boer cap for 10 mm dia pvc casing pipe for 150mm dia borewell |
| 13 | for unconventional work 140mm dia pvccasing pipe of 4kg/cm2 for 115 mm dia Drilling work as per IS 4985-1988 Without grouting, Including loweing laying handing etc. |
| 14 | Providing and fixing 140 mm dia PVC casing pipe for 115mm dia borewell has 6kg/cm2 pressure and as per IS 4985-1988 standardincluding lowering, handling, grouting etc |
| 15 | Providing and fixing 140 mm dia 4 kg/cm2 PVC pipe lowering and Grounting etc complate for unconventionalhole |
| 16 | Providing and fixing 140 mm dia 6kgcm PVC pipe Lowering and Grounting etc |
| 17 | PVC bore cap for 140 mm dia pvc casing pipe |
| 18 | to be used for recharge shaft PVC casing pipe for meshing at suitable place. |
| 19 | Installation of India mark-2 hanspump set on borewell. |
| 20 | Excavation work for preparing H.P. platform |
| 21 | Dry rubble stone filling work before the construction of platfrom total dry rubble stone filling work |
| 22 | construction of plasform PCC (m-150) work should be in 1.2.4total p.c.c work |
| 23 | Transportation on up to 40km per handpump installation and construction of platform TIP hand Pump Platform construction as per GSDAbplan |
| 24 | Providing and fixinf special water chamber for duel pump |
| 25 | provding and fixing stainless steel bottam nipple for duel pump |
| 26 | Yeild testing of borewell by electrical or Deneretor etc comp |
| 27 | for HydrofacturingFlushing, Borewell special repair yeld test hand pump removal and installation |
| 28 | Redrilling/ Flusing of Borewell 150 mm / 115 mm by machinery with transportation withfule etc comp. |