|
| 1 | LT Distribution Box |
| 2 | Special Clamp with both side Hook |
| 3 | LT XLPE Cable 1x35sq mm |
| 4 | LT PVC TPE |
| 5 | Total (A) |
| 6 | LABOUR CHARGE |
| 7 | Erection of Earthing Rod |
| 8 | Fabrication of Steel |
| 9 | Excavation of PIT for Stay set |
| 10 | Erection of LT StaySet |
| 11 | Grouting of Stay Set |
| 12 | Excavation of PIT for Pole |
| 13 | Erection of Single PCC Pole |
| 14 | Erection of Single SP-23Pole |
| 15 | Grouting of Pole |
| 16 | Muffing of Pole |
| 17 | Painting of SP-21/23 Pole |
| 18 | Laying of LT PVC Cables (up to 150sqmm) |
| 19 | Making of Section Pole |
| 20 | Cartage PCC Pole, 21-50 KM |
| 21 | Cartage of SP-21/23Pole, 21-50 KM |
| 22 | Cartage of Petty Material, 21-50 Km |
| 23 | Head load cartage PCC Pole (0-1 Km) |
| 24 | Head load cartage SP-21/23 Pole (0-1 Km) |
| 25 | Head load cartage of Material (0-1 Km) |
| 26 | Disconnection & Reconnection of Consumers |
| 27 | Instalation of single phase meter |
| 28 | Un-Instalation of single phase meter |
| 29 | Straightning of tilledexisting LT pole |
| 30 | Laying of LT XLPE ABC 3x120+1x95+1x16 Sq. |
| 31 | Laying of LT XLPE ABC 3x95+1x70 Sq.mm |
| 32 | Inst. Of Danger Board / Number Plate |
| 33 | Sagging/Resagging of ACSR/ABC LT Line |
| 34 | Installation ofLT Distrubution Box |
| 35 | Opening & Making of Jumpher of Section Pole |
| 36 | Supply & fixing of LT Clamp for PCC Pole |
| 37 | Erection of Dead end Clamp |
| 38 | Erection of Suspension Clamp |
| 39 | Fixing of Channel, Angle on Pole |
| 40 | Laying & fixing of 1x35 sq mm XLPE Cable |
| 41 | Fixing of PG Clamp 95-95 Sq.mm |
| 42 | Supply & fixing IPC |
| 43 | Looping and Choping of tree branches |
| 44 | Total (B) |
| 45 | Total (A+B) |
| 46 | Company/Firm Name |
| 47 | Name |
| 48 | Designation |
| 49 | Date |