| 1 | Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening theerviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge.Cutting & picking up existing metalled black top portion of road surface to an average depth of 300 mm by using Jack hammer with all necessary tool and plant including reening theerviceable materials & stacking within a lead of 75 mtr. all complete as per direction of the Engineer-in- Charge. |
| 2 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as requiredcomplete.(a) Depth of excavation not exceeding 1,500 mm. |
| 3 | Hire and labour charges for shoring work(including necessary close plank walling, framing,Eucalyptus/Jhou bulla piling, strutting etc)complete as per direction of the Engineer-in charge for foundation excavation (vertical surface are in contact with supported earth is to be measured.) (This item should be executed on specific direction of the Engineer in charge).(a) Depth upto 1.5m |
| 4 | Lead jointing to C.I pipes and specials with supply of lead and spun yarn all complete to make the joint water tight at required hydraulic pressure as per specification & direction of the Engineer-in-charge.(Lead shall be supplied supplied departmentally departmentally to the Agency at specified specified Issue rates and cost thereof shall be recovered from the. works Bill of the Agency] (a) 750 mm dia |
| 5 | Supplying including cost of installation of C.I. Leak Repair Clamps suitable for permanent repair of leakages in Socket / Spigot joints in C.I. Spun Pipes (as per IS: 1536) and D.I. Pipes (as per IS: 8329). The Clamp consists of two Cast Iron Rings supplied in overlapping semi circular halves which compress a specially shaped / contoured rubber gasket made of EPDM quality (IS:5382 Type-4) on the socket face making the Socket / Spigot Joint water right at the operating pressure. The Clamp to be supplied complete with Rubber Gaskets made of EPDM quality and coated Nut Bolts as per manufacturer specification. Fitting and fixing should be in proper position with proper care of main pipe line for leak proof condition. (a) 700 mm dia |
| 6 | Dewatering by pumps including all leads, lifts and making all arrangements of disposal. where continuous flow of water from a source other than natural or ground water is encountered in case of emergency maintenance works related to leakage. breakage and making wet connections. [Note ;- In case of any other situation demanding such emergency dewatering. use of this item is to be approved by the Superintending Engineer/Tender Accepting Authority. This item shall be executed on the specific direction duly supported by proper clarification of the E.I.C. who will be satisfied in absolute discretion that such work has not been necessitated due to any natural source of water or any fault of the Contractor] |
| 7 | Hire & labour charges for diesel generating set for lighting including fuel, 300M wire, 11 points with 200 Watt bulb with post for hanging & maintaining the same for day & night for the period. |
| 8 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete.(Payment to be made based on the basis of measurement of finished quantity of work. |
| 9 | Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water,ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)By fine sand |
| 10 | Brick soling with picked jhama bricks including preparation of bed as necessary with brick joints properly filled in and packed with powdered earth and including necessary cushion of similar material below the soling (and in between layers when more than one layer is used) completes as per direction.A) Soling or dry pavement with one brick-on-edge on a layer of brick flat (thicknass 125 mm. plus 75 mm.) |
| 11 | Removal of rubbish, earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal /Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge. |
| 12 | Add GST @18% on sum of Sl No 1 to 11 |
| 13 | Add LWC @ 1% on sum of Sl No 1 to 12 |